k,M ..

i slR j Northom States Power Company D<

[ 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 i

Telephone (612) 3S$500 :

s SAFEGUARDS INFORMATION August 6, 1990 10 CFR Part 50 Section 50.54(p).

7 Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR 22 Submission of Revision 31 to Monticello Security Plan-I 1

References:

U 1). Letter dated July 31990 from L Robert ~ Greger (Region III) to .C E I Larson (NSP) concerning the visit of G L Pirtle l l

Pursuant to 10 CFR Part 50, Section 50.54(p), we are submitting four copies of Revision 31 to the Monticello-Security Plan. These changes do not decrease the effectiveness of the Monticello Security Plan.

This revision to the Monticello Security Plan contains Safeguards Information as identified by the Commission in 10 CFR 73.21. The Security Plan revision should not be made-available for inspection and should not be placed in the public document room.

We a're undertaking a project to upgrade the Monticello Security systems'- This change describes the nature of the modifications'for the protected area perimeter and the compensatory measures that will be implemented during'the proj ect (Reference 1). -The target dates for the individual modifications presented.in this revision are provided below. These dates are provided for your.information. The completion dates can be affected by adverse weather conditions, unavailability of parts and other unplanned events. We will notify you by phone: 1) following the completion of each modification, or 2) if completion is delayed by more than thirty days beyond the target date.

When Separated from Enclosures, Handle This Document as Decontrolled SAFEGUARDS INFORMATION a (C

.a nn.,,,. N e,

@ jo81500 900306 a[i- pas noccm oc. coon.3 p rD. ' )/[

g% _ . .-

,l l

O l

'Dir of NRR * " "Y

': August.6, 1990 Page<2 q SAFEGUARDS INFORMATION 1 I

l Modification Completion '

Described in Section: Date.:

8,4.1 October 1, 1990

'8.4.2 October 1, 1990 8.4.3 October 1, 1990 8,4.4 Completed July 24, 1990 8.4.5 September 12, 1990~

8.4.6 September 4, 1990 8.4.7 September 4, 1990 e 8.4.8 September- 19, 1990.

8.4,9 August 31, 1990 Upon completion of the entire project, we will.make the necessary permanent changes to the Monticello Security Plan in accordance with'10 CPR Part 50.54(p).

Please contact us if you have any questions related to this revision.

i

_ Thomas M Parker Manager

.Nucleat-Support Services ,

When Separated from Enclosures.

Handlu This Document as Decontrolled c: Regional Administrator III, NRC (w/ 2 copies of Revision)

.NRR Project Manager, NRC (transmittal letter only) '

'NRC Resident Inspector (transmittal letter only)

C Charnoff (transmittal letter only)

Attachment:

Revision 31 to the Monticello Security Plan 1

u-SAFEGUARDS INFORMATION

___________._____________1