ML15167A442 | |
Person / Time | |
---|---|
Site: | Monticello ![]() |
Issue date: | 06/16/2015 |
From: | Gardner P Xcel Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-MT-15-034 LER 15-001-00 | |
Download: ML15167A442 (4) | |
Similar Documents at Monticello | |
---|---|
Category:Letter
MONTHYEARIR 05000263/20240042025-01-30030 January 2025
[Table view]Integrated Inspection Report 05000263/2024004 ML25006A1522025-01-16016 January 2025 Section 106 Consultation of Monticello SLR-Shakopee ML25006A1502025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Lower Sioux Indian Community ML25006A1512025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Mille Lacs Band of Ojibwe ML25010A0722025-01-10010 January 2025 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000263/2025002 IR 05000263/20244042025-01-0606 January 2025 Material Control and Accounting Program Inspection Report 05000263/2024404 (Public) ML24310A3442024-12-30030 December 2024 Transmittal Letter for Renewed License ML24270A1552024-12-19019 December 2024 Issuance of Amendment No. 213 Revise Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (Ptlr), and Update Neutron Fluence Methodology ML24354A2952024-12-18018 December 2024 ISFSI and Monticello Nuclear Generating Plant - Independent Spent Fuel Storage Installation Decommissioning Funding Plans L-MT-24-045, 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462024-12-13013 December 2024 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 ML24353A1192024-12-12012 December 2024 Usepa Monticello Re-license Feis Comments (1) IR 05000263/20244022024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024402; Independent Spent Fuel Storage Installation Security Inspection Report 07200058/2024401 IR 05000263/20244032024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024403 ML24324A0082024-12-0404 December 2024 Letter to Minnesota State Historic Preservation Office Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application IR 05000263/20243012024-11-27027 November 2024 NRC Initial License Examination Report 05000263/2024301 L-MT-24-042, Update to the Technical Specifications Bases2024-11-22022 November 2024 Update to the Technical Specifications Bases ML24323A2142024-11-21021 November 2024 – Relief Request RR-017, Inservice Inspection (ISI) Impracticality During the Fifth Ten-Year Interval ML24318C5002024-11-19019 November 2024 Letter to Robert Blanchard Tribal Chairman Bad River Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5102024-11-18018 November 2024 Letter to Louis Taylor Chairman Lac Courte Oreilles Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5092024-11-18018 November 2024 Letter to Doreen Blaker President Keweenaw Bay Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5012024-11-18018 November 2024 Letter to Catherine Chavers Tribal Chairwoman Bois Forte Band Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5202024-11-18018 November 2024 Letter to Grant Johnson President Prairie Island Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5182024-11-18018 November 2024 Letter to Gena Kakkak Chairwoman Menominee Indian Tribe of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5222024-11-18018 November 2024 Letter to Darrell Seki Chairman Red Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5282024-11-18018 November 2024 Letter to Jamie Azure Chairman Turtle Mountain Band of Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5322024-11-18018 November 2024 Letter to Robert Vanzile Jr Chairman Sokaogon Chippewa Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5032024-11-18018 November 2024 Letter to Anthony Reider President Flandreau Santee Sioux Tribe NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5232024-11-18018 November 2024 Letter to Alonzo Denney Chairman Santee Sioux Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5022024-11-18018 November 2024 Letter to Reggie Wassana Governor Cheyenne and Arapaho Tribes NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5162024-11-18018 November 2024 Letter to James Williams Jr Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5212024-11-18018 November 2024 Letter to Nicole Boyd Chairwoman Red Cliff Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5312024-11-18018 November 2024 Letter to Virgil Wind Chief Executive Mille Lacs Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5292024-11-18018 November 2024 Letter to Kevin Jensvold Tribal Chairman Upper Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5042024-11-18018 November 2024 Letter to Jeffrey Stiffarm President Fort Belknap Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5112024-11-18018 November 2024 Letter to John Johnson President Lac Du Flambeau Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3512024-11-18018 November 2024 Letter to Amy Spong, Deputy State Historic Preservation Officer, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5172024-11-18018 November 2024 Letter to Robert Larsen President Lower Sioux Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5072024-11-18018 November 2024 Letter Timothy Rhodd Chairman Iowa Tribe of Kansas and Nebraska Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5252024-11-18018 November 2024 Letter to J Garrett Renville Tribal Chairman Sisseton Wahpeton Oyate of the Lake Traversee Re NOA Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5262024-11-18018 November 2024 Letter to Lonna Johnson Street Chairperson Spirit Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5192024-11-18018 November 2024 Letter to Michael Laroque President Minnesota Chippewa Tribe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5302024-11-18018 November 2024 Letter to Michael Fairbanks Chairman White Earth Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5052024-11-18018 November 2024 Letter to Bruce Savage Tribal Chairperson Found Du Lac Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5062024-11-18018 November 2024 Letter to Robert Deschampe Tribal Chair Grand Portage Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5152024-11-18018 November 2024 Letter to Faron Jackson Sr Chairman Leech Lake Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3462024-11-18018 November 2024 Letter to Jaime Loichinger Director Office of Federal Agency Programs, Achp NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5242024-11-18018 November 2024 Letter to Cole Miller Chairman Shakopee Mdewakaton Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3202024-11-18018 November 2024 Letter to Durell Cooper Tribal Chairman Apache Tribe of Oklahoma Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5272024-11-18018 November 2024 Letter to Thomas Fowler Chairman St. Croix Chippewa of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR 2025-01-06 Category:Licensee Event Report (LER) MONTHYEAR05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024
[Table view]Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component 05000263/LER-2023-003, Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch2023-12-0404 December 2023 Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch 05000263/LER-2023-002, Reactor Scram and Containment Isolation Due to Valve Responses During Main Turbine Control Valve Testing2023-11-13013 November 2023 Reactor Scram and Containment Isolation Due to Valve Responses During Main Turbine Control Valve Testing 05000263/LER-2023-001, Main Steam Isolation Valve Leakage Exceeds Technical Specification Requirements Due to Stem Scoring2023-05-17017 May 2023 Main Steam Isolation Valve Leakage Exceeds Technical Specification Requirements Due to Stem Scoring 05000263/LER-2022-001, Loss of Control Room Envelope Operability2022-07-0707 July 2022 Loss of Control Room Envelope Operability 05000263/LER-2019-002, Two Manual Primary Containment Isolation Valves Found Open Resulting in a Condition Prohibited by Technical Specification2019-08-0909 August 2019 Two Manual Primary Containment Isolation Valves Found Open Resulting in a Condition Prohibited by Technical Specification 05000263/LER-2019-001, RHR Decay Heat Removal Pump Start Permissive Logic Hardening Error2019-06-13013 June 2019 RHR Decay Heat Removal Pump Start Permissive Logic Hardening Error 05000263/LER-1917-006, Regarding Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests Due to Use of a Test Fixture2018-01-12012 January 2018 Regarding Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests Due to Use of a Test Fixture 05000263/LER-1917-005, Regarding Diesel Generator Emergency Service Water System Automatic Transfer to Alternate Shutdown Panel2017-09-20020 September 2017 Regarding Diesel Generator Emergency Service Water System Automatic Transfer to Alternate Shutdown Panel 05000263/LER-1917-004, Regarding High Pressure Coolant Injection Steam Stop Valve Failed to Open During Test2017-08-16016 August 2017 Regarding High Pressure Coolant Injection Steam Stop Valve Failed to Open During Test 05000263/LER-1917-003, Regarding Main Steam Isolation Valve Leakage Exceeds Technical Specification Limits2017-06-14014 June 2017 Regarding Main Steam Isolation Valve Leakage Exceeds Technical Specification Limits 05000263/LER-1917-002, Regarding Main Steam Isolation Valve Closure Time Outside of Technical Specification Requirements2017-06-13013 June 2017 Regarding Main Steam Isolation Valve Closure Time Outside of Technical Specification Requirements 05000263/LER-1917-001, Regarding Reactor Scram and Group II Isolation Due to 11 Reactor Feed Pump (RFP) Removal from Service with 12 RFP Isolated2017-06-13013 June 2017 Regarding Reactor Scram and Group II Isolation Due to 11 Reactor Feed Pump (RFP) Removal from Service with 12 RFP Isolated 05000263/LER-1916-003-01, Regarding HPCI Declared Inoperable Due to Excessive Water Level in Turbine2017-05-25025 May 2017 Regarding HPCI Declared Inoperable Due to Excessive Water Level in Turbine 05000263/LER-2016-002, Regarding Inadequate Appendix R Fire Barrier Impacts Safe Shutdown Capability2016-09-30030 September 2016 Regarding Inadequate Appendix R Fire Barrier Impacts Safe Shutdown Capability 05000263/LER-2016-001, Regarding High Pressure Coolant Injection System Cracked Pipe Nipple Caused Oil Leak2016-05-18018 May 2016 Regarding High Pressure Coolant Injection System Cracked Pipe Nipple Caused Oil Leak 05000263/LER-2015-006, Regarding Reactor Scram Due to Group 1 Isolation from Foreign Material in the Main Steam Flow Instrument Line2016-01-21021 January 2016 Regarding Reactor Scram Due to Group 1 Isolation from Foreign Material in the Main Steam Flow Instrument Line 05000263/LER-2015-007, Regarding Loss of Residual Heat Removal Capability2016-01-21021 January 2016 Regarding Loss of Residual Heat Removal Capability 05000263/LER-2015-005, Regarding Use of the Reactor Water Cleanup System to Lower Level Without Declaring an OPDRV with Secondary Containment Inoperable - Extent of Condition Review2015-10-0202 October 2015 Regarding Use of the Reactor Water Cleanup System to Lower Level Without Declaring an OPDRV with Secondary Containment Inoperable - Extent of Condition Review 05000263/LER-2015-004, Regarding Past Inoperability of Turbine Stop Valve Scram Function Exceeded Technical Specification Requirements2015-08-21021 August 2015 Regarding Past Inoperability of Turbine Stop Valve Scram Function Exceeded Technical Specification Requirements 05000263/LER-2015-003, Regarding Use of the Reactor Water Cleanup System to Lower Level Without Declaring an Operation with a Potential to Drain the Reactor Vessel (OPDRV) with Secondary Containment Inoperable2015-07-13013 July 2015 Regarding Use of the Reactor Water Cleanup System to Lower Level Without Declaring an Operation with a Potential to Drain the Reactor Vessel (OPDRV) with Secondary Containment Inoperable 05000263/LER-2014-010-02, Regarding Physical Security Plan Inaccuracy Revealed Past Security Vulnerability2015-07-0101 July 2015 Regarding Physical Security Plan Inaccuracy Revealed Past Security Vulnerability 05000263/LER-2015-002, From Monticello Nuclear Generating Plant Regarding Loss of Shutdown Cooling Due to Improperly Landed Jumper Wire2015-06-29029 June 2015 From Monticello Nuclear Generating Plant Regarding Loss of Shutdown Cooling Due to Improperly Landed Jumper Wire 05000263/LER-2015-001, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable2015-06-16016 June 2015 Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable 05000263/LER-2014-011, Regarding Two Emergency Diesels Inoperable Due to Human Error2015-02-26026 February 2015 Regarding Two Emergency Diesels Inoperable Due to Human Error 05000263/LER-2013-007-02, Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures2015-01-27027 January 2015 Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures 05000263/LER-2014-008, Regarding Opening Identified in Fire Barrier2014-07-14014 July 2014 Regarding Opening Identified in Fire Barrier 05000263/LER-2014-007, Regarding Non-compliance with Technical Specification 3.4.9 - Reactor Coolant System Pressure and Temperature Limits2014-06-12012 June 2014 Regarding Non-compliance with Technical Specification 3.4.9 - Reactor Coolant System Pressure and Temperature Limits 05000263/LER-2014-006, Regarding Secondary Containment Doors Opened Simultaneously2014-05-23023 May 2014 Regarding Secondary Containment Doors Opened Simultaneously 05000263/LER-2014-005, Regarding Appendix R Fire Door Failed to Latch2014-05-19019 May 2014 Regarding Appendix R Fire Door Failed to Latch 05000263/LER-2014-004, Time to Energize Loads Greater than Surveillance Requirement2014-04-11011 April 2014 Time to Energize Loads Greater than Surveillance Requirement 05000263/LER-2014-002, Regarding Torus to Drywell Vacuum Breaker Did Not Indicate Closed During Testing2014-04-0808 April 2014 Regarding Torus to Drywell Vacuum Breaker Did Not Indicate Closed During Testing 05000263/LER-2014-003, Regarding Torus to Drywell Vacuum Breaker Dual Indication During Testing2014-04-0808 April 2014 Regarding Torus to Drywell Vacuum Breaker Dual Indication During Testing 05000263/LER-2013-007-01, Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures2014-03-28028 March 2014 Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures 05000263/LER-2014-001, Regarding Primary System Leakage Found in Recirculation Pump Upper Seal Heat Exchanger2014-03-14014 March 2014 Regarding Primary System Leakage Found in Recirculation Pump Upper Seal Heat Exchanger 05000263/LER-2013-008-01, Regarding Both Secondary Containment Access Doors Briefly Opened Simultaneously2014-03-12012 March 2014 Regarding Both Secondary Containment Access Doors Briefly Opened Simultaneously 05000263/LER-2013-003-02, Regarding Inadequate External Flooding Procedure2014-01-28028 January 2014 Regarding Inadequate External Flooding Procedure 05000263/LER-2013-006-01, Regarding Unanalyzed Condition for Emergency Diesel Generator Fuel Oil Pumps Train Separation2013-12-19019 December 2013 Regarding Unanalyzed Condition for Emergency Diesel Generator Fuel Oil Pumps Train Separation 05000263/LER-2013-000-08, Both Secondary Containment Access Doors Briefly Opened Simultaneously2013-11-0808 November 2013 Both Secondary Containment Access Doors Briefly Opened Simultaneously 05000263/LER-2013-007, Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures2013-10-28028 October 2013 Regarding Unanalyzed Condition Due to Inadequate Flooding Procedures 05000263/LER-2013-006, Regarding Unanalyzed Condition for Emergency Diesel Generator Fuel Oil Pumps Train Separation2013-10-18018 October 2013 Regarding Unanalyzed Condition for Emergency Diesel Generator Fuel Oil Pumps Train Separation 05000263/LER-2013-003-01, Regarding Inadequate External Flooding Procedure2013-09-26026 September 2013 Regarding Inadequate External Flooding Procedure 05000263/LER-2013-004, Loss of Normal Off-Site Power as a Result of Switch Gear Fault2013-08-12012 August 2013 Loss of Normal Off-Site Power as a Result of Switch Gear Fault 05000263/LER-2013-003, Regarding Inadequate External Flooding Procedure2013-07-30030 July 2013 Regarding Inadequate External Flooding Procedure 05000263/LER-2013-002, Regarding Essential Bus Transfer During 2R Transformer Testing2013-07-23023 July 2013 Regarding Essential Bus Transfer During 2R Transformer Testing 05000263/LER-2013-001, E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed2013-06-0707 June 2013 E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed 05000263/LER-2012-003-01, Regarding Automatic Reactor Scram During Maintenance on 4160V 12-Bus Ammeter2013-01-18018 January 2013 Regarding Automatic Reactor Scram During Maintenance on 4160V 12-Bus Ammeter 05000263/LER-2012-005, Regarding Partial Group II Isolation During Removal of Original Steam Dryer2013-01-11011 January 2013 Regarding Partial Group II Isolation During Removal of Original Steam Dryer 05000263/LER-2012-004, Regarding High Pressure Coolant Injection Inoperable When Inverter Is Out of Service2012-11-30030 November 2012 Regarding High Pressure Coolant Injection Inoperable When Inverter Is Out of Service 2024-08-27 |
Event date: | |
---|---|
Report date: | |
2632015001R00 - NRC Website | |