ML20202F782

From kanterella
Jump to navigation Jump to search
Forwards 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(vi).Ltr Contains No New Commitments or Modifies Any Prior Commitments
ML20202F782
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/27/1999
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20202F788 List:
References
NUDOCS 9902040179
Download: ML20202F782 (3)


Text

. I o

TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT 4 Certification of Plant-Referenced Simulator Manifest Date
January 27,1999 Correspondence Date: January 27,1999 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.. ...USAR File..... . ...Yes No_x_

Steve Ludders .. . . ..NRC Commitment... ..Yes No_x_

Lila Imholte.................Monti OC Sec.. .. . ....Yes No_x_ - 12, No dist to OC members below if YES SAC Secretary . ...... ..Monti SAC.... . . . . . .Ye s No_x_ - 6 Monticello Internal Site Distribution:

Monti Document Control File JCC ' b, o NGSS, OC M F Hammer, Plant MGR, SAC, OC L L f. o, GSSA, OC, SAC C A Schibonski, GSE, OC E C Sopkin, MGR MTC, OC E M Reilly, GSM, OC Monticello Oper Exp Coord J E Windschill, GSRS, OC A E Ward, NQD B D Day, GSO, OC Monti Site Lic File John Shriver (2 copies) Monticello Sr. Resident inspector NSP Internal Distribution G T Goering, Chainnan, SAC W A Shamla, Dir Gen Qual Serv, SAC Communications Dept Yes No_x_

External NSP Distribution Doc Controi Desk, NRC Kris Sanda, State of Minn Director, Office of Nuclear Reactor J E Silberg l Regulation Fred Lyon, NRR-PM, NRC 9902040179 990127 9 ADOCK 05000263 ;

PDR P PDR y M-1

~

l Northem States Power Company Monticello Nuclear Generating Plant l 2807 West Hwy 75 Monticello, Minnesota 55362 9637 i

o - January 27,1999 10 CFR 55.45(b)(5) ,

il 1

^

' Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Certification of Plant-Referenced Simulator This submittal provides the information required by 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) for the Monticello Nuclear Generating Plant simulator. The required four year certification report is enclosed. Certification of the Monticello Nuclear Generating Plant simulator was provided to the Commission by letter dated February 1,1991, from Thomas M. Parker to the US Nuclear Regulatory Commission, entitled " Certification of Plant-Referenced Simulator."

This letter contains no new NRC commitments, nor does it modify any prior commitments. Please contact Marcus Voth, Monticello Licensing Project Manager, at 612-271-5116 if you require further information.

%%flA/

Michael F. Hammer 1 Plant Manager . l Monticello Nuclear Generating Plant c: ' NRR Project Manager, NRC Sr. Resident inspector, NRC j

. State of Minnesota Attn: Kris Sanda D()

J Silberg -

I' '

Attachment:

' Monticello Nuclear Generating Plant Four Year Simulator Certification Report J11CENsETPeriodic Reports \ simulator.Jan99. Doc

l NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 31504138 EXPIRES: 06t'3 ff2001 U Esumated burden per response to comply with this mandatory mformabon colischon request. 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> This informabon is used to ca.tify a simulation facdity Forward Commerits regatdmg burden 85twnate to the Records M ment Branch (T.8 F33), U S SIMULATION FACILITY CERTIFICATION  %"J'OT"WJ" i'is"sc'.'"o'"fCfemeni a,d e'#4 'l0s*@.~oC' 20503 If anm bon collection does n me NRC may not conduct or sponsor. nd a .otdisplay a currencyvowlOMB

- a not iequired = .spond io.c,ontros me numbe informanon coHecton This form a to be filed for msbal IN..STRUCTIONS:we en me -o,-.een .nd ihe~,.-.

cerbficabon, e bm m,.~ encerbficanon e - ,e, s-.. (d required). arid for any change to a sanulaban facility performance tesDng plan m FACIUTY DOCKET NUMBER Monticello Nuc? ear Generating Plant 50-263 UCENSEE DATE Northern States Power Company Jan. 27, 1999 This is to cettrfy that

1. The above named facility licensee is usmg a simulaton faciidy cons,sbag solely of a plant. referenced samuistor that meets the requirernents of 10 CFR 55 45.
2. Documentat on is eveilable for NRC remew m accordance with 10 CFR 55 45(b).
3. This sunufabon focusty meets the gedance contained m ANSitANS 3 51965 or ANSIIANS 3 S1993, as endorsed by NRU Regulatory Guide 1.149 lllhete are any EXCEPTIONS to the certificaban of this stem, CHECK HERE [ ] and desenbe fully on addibonal pages as necessary  ;

NAME (a o@er afenbhcahon) AND LOCATION OF SIMULATION FACIUTY.

Monticello Nuclear Generating Plant Training Simulator )

Monticello Training Center Monticellos Minnesota 55362 SIMULATION FACluTY PERFORMANCE TEST ABSTRACTS ATTACHED (For penbrmence dests condueled a me permd andmg we me dets of mes corblicaban)

DESCRIPTION OF PERFORMANCE TESTING COMPLETED. (Altech addhonalpages as necessary end Idenk& @e reem descnpbon bemg conbnued)

See attached Monticello Simulator Certification Report I

l l

SIMULATION FACILITY PERFORMANCE TESTWO SCHEDULE ATTACHEO. (Fcr me conductof appromirnalsty 25 percent ofpeArmance kats per year A:r me itxr-yearpened

)( comunencing wem the date of thes certrncaban)

DESCRIPTION OF PERFORMANCE TESTMO TO BE CONOUCTED. (Atsech addobonalpages as necessay and adenbry the stem desaxpban kerrte continued)

See attached Monticello Simulator Certification Report l l

l l

\

PERFORMANCE TESTING PLAN CHANGE. (Fa any mod,fceban to e perhmence fesbng p'en submetfod on a proveus certificaban)

DESCRIPT10N OF PERFORMANCE TESTNO PLAN CHANGE (Anach eddabonelpages es necessary and adentr& te elem descnpban beng conbnued)

RECERT1FICATION (Desaube carectrve ockons teken, effech resuns of completedparksmance lesbng m occadence we y0 CFR SS 4S(b)(S)(r).

(Ansch addhanalpages es necessary end adentr& 50 item desenpkon beng conbnued)

Any false statement or ernesseon m tbs document, includmg attachments, may be subject to cMI and commal sanctions. I corbfy under penalty of perjury that the esformabon m thes document and attachments is hee and correct SsGNATURE - AUTHOR 1 ZED REPRESENTATlVE TITLE DATE Plant Manager Michael F. Hammer Monticello Nuclear Generatine Plant Jan. 27. 1999 in accordance with 10 CFR 55 5, Communicabons, this form shall be submetted b the NRC as follows BYMAIL ADORESSEDTO DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION BY DEUVERY IN PERSON ONE WHITE FUNT NORTH U.S. NUCLEAR REGULATORY COMMISSION TO THE NRC OFFICE AT; 11555 ROCKVILLE PlKE WASHINGTON, DC 206654001 ROCKVILLE, MO NRC FORM 414 (&1998) PRINTED ON RECYCLED PAPER