ML20147C272

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-346/OL-87-02 of Exam Adminstered on 871130
ML20147C272
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20147C279 List:
References
NUDOCS 8801190151
Download: ML20147C272 (2)


Text

..

A JAN11 M Docket No. 50-346 Toledo Edison Company ATTN: Mr. Donald Shelton Vice Prasident Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

SUBJECl: EXAMINATION REPORT On November 30, 1987, the NRC administered examinations to employees of your company who had applied for licenses to operate your Davis-Besse Nuclear Power Station. At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission"s regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, hi'JGl.'!AL S!0NED. IlY GE0ff. REY 0, gggg Geoffrey C. Wright, Chief Operations Branch

Enclosures:

1. Examination Report No. 50-346/0L-87-02
2. Examination (s) and Answer Key (s) (SR0/R0)

See Attached Distribution RII R1 RIII RI I n

-? y urdick

- g g Re dinger/abl right re i1 8801190151 890111 6 ,

PDR ADOCK 050 y .

v g( fC, f 4 1

)

JAN11YEt Toledo Edison Company 2 Distribution cc w/ enclosures:

L. Storz, Plant Manager DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA James W. Harris, State of Unio Robert M. Quillin, Ohio Department of He'.ith State of Ohio, Tublic Utilities Commission R. Simn'.ieis, Plant Training Manager J. % nnon, Branch Chief, OLB

.. DeAgazio, Project Manager, NRR R. W. Cooper, ED0