Responds to Concerning Actions Re IE Info Notice 85-009 Isolation Transfer Switches & post-fire Shutdown Capability.Generic Ltr 81-12 Does Not Specify When Fuses May Be Replaced.Nrr Should Be Contacted for Clarification
ML20137R105
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/21/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
References
GL-81-12, IEIN-85-009, IEIN-85-9, NUDOCS 8512050427
Download: ML20137R105 (2)


Text

_ - _ -

r.

NOV 211935 Docket No. 50-271 Vermont Yankee Nuclear Power Corporation ATTN: Mr. Warren P. Murphy Vice President and Manager of Operations RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301 Gentlemen:

This letter is in response to your letter dated June 28, 1985, concerning your actions with regard to IE Information Notice 85-09 isolation transfer switches and post fire shut down capability. This Information Notice alerted licensees to the possibility that a fire may adversely impact transfer of control for the safe shut down systems from the main Control Room to the alternate shut down

-panel (s). This problem may occur from loss of control power when fuses common to both normal and alternate shutdown system circuits blow, prior to transfer and isolation of the affected control power circuits.

Your letter indicates that Vermont Yankee will not provide parallel or redun-dant fusing for the circuits involved because a) the possibility of fuses blowing is remote and b) Generic letter 81-12 recognized the possibility that fuses may have to be replaced and provided for fuse replacement.

With regard to the latter, we recognize that the wording of Generic Letter 81-12 does not specify when fuses may be replaced, i.e. during hot or cold shutdown. Fuse replacement is considered by the staff to be a repair and as such'10 CFR 50 Appendix R does not allow for fuse replacement during hot shut-down conditions.

You should contact the office of Nuclear Reactor Regulation for their positian and further clarification of this issue.

Origiant signed Bv:

Jacque P. Dun Stewart D. Ebneter, Director Division of Reactor Safety

?

B512050427 B51121 PDR ADOCK 05000271 G PDR OFFICIAL RECORD COPY RL VY IEIN 85 0001.0.0 11/20/85

B o Vermont Yankee Nuclear Power Corp. cc:

Mr.' R. W. Capstick, Licensing Engineer Mr. W. F. Conway, President and Chief Executive' Officer Mr. J. P. Pelletier, Plant Manager Mr. Donald Hunter, Vice President Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire State of Vermont bcc:

Region I-Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DPRP M. McBride, RI, Pilgrim W. Raymond, SRI, Yankee V. Rooney, LPM, NRR 4

O tat -)

RI:DRS RI:DRS RI:DRS RI:DRS Krasopoulos/k1 son Du r Ebneter ooIvfr a Ander/r>.

n/y  !! .to $>,,

sf.fo{

clafn #b elq OFFICIAL RECORD COPY- RL VY IEIN 85 0002.0.0 11/04/85