ML17056B302

From kanterella
Revision as of 23:08, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B302
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/31/1990
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200104
Download: ML17056B302 (2)


Text

OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:

(315)349-24431.UnitName:NineMilePointUnit¹12.Reporting Period:5/1/90through5/31/903.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative ll.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type,Refueloutaestartedonanua221988.744.00.00.00.00.00.00.00.00.00.00.00.0100.0DateandDurationofEach):3,623.00.00.00.00.00.00.00.00.00.00.00.0100.0181,512.2 115,234.3 1,204.2lg,lI7.220.4188,473,132.0 62,473,070.0 60,524,382.0 61.861.854.753.825.426.UnitisTestStatus(PriortoCommercial Operation):

ForecastAchievedIN1TIALCRlTICALITY IN1TIALELECTRIC1TY COMMERCIAL OPERATION

('9i02200104 910207PDRADOCK05000220RPDR l'