Revised Monthly Operating Rept for May 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B302
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/31/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200104
Download: ML17056B302 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit ¹1
2. Reporting Period: 5/1/90 through 5/31/90 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative ll. Hours in Reporting Period 744.0 3,623.0 181,512.2

12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 lg,lI7.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 61.8
20. Unit Availability Factor 0.0 0.0 61.8
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.7
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 53.8
23. Unit Forced Outage Rate 100.0 100.0 25.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e started on anua 22 1988.

26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved IN1TIALCRlTICALITY IN1TIALELECTRIC1TY COMMERCIAL OPERATION

('

9i02200104 910207 PDR ADOCK 05000220 R PDR