OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: I/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mile Point Unit //I
- 2. Reporting Period: 4/I/89 through 4/30/89
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes 9., Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (Mug
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anun 22 1
719.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
88 2,879.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,008.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.2 65.2 57.7 56,8 20.4
- '6.
Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION r
9102200131 910207
<<'r PDR ADOCK 05000220
-PDR