Monthly Operating Rept for Oct 1998 for Nine Mile Point Nuclear Station,Unit 1.With
ML20195J414
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/31/1998
From: Close R, Rich Smith
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NMP91479, NUDOCS 9811240279
Download: ML20195J414 (5)


Text

. - - .-. . - - -

a.

l

'.. y l

NiagarahMohawk'

)

November 13, 1998 NMP91479 l

U.S. Nuclear Regulatory Commission Attention: Document Control Desk l Washington, D.C. 20555 i RE: Nine Mile Point Nuclear Station Unit #1 Docket No. 50-220 DPR-63 1

Subject:

Operating Statistics and Shutdowns - October 1998 Gentlemen:

1 Submitted herewith is the Operating Data Report, Unit Shutdowns and Power I Reductions, and a Narrative of Operating Experience for October 1998 for the Nine l Mile Point Nuclear Station Unit #1. Submittal of this information complies with Section 6.9.1.c of the Unit #1 Technical Specifications.

l

! Very truly yours,

!R ADOCK O 220-R PDR

'. . i ; ' , a Robert G. Smith i Plant Manager - NMP1

! Ilh Enclosures q

pc: H.J. Miller, Regional Administrator, Region 1

G.K. Hunegs, Senior Resident inspector /

l

l OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 11/06/98 PREPARED BY: R.S. Close TELEPlIONE: (315) 349-1282 OPERATING STA'US

1. Unit Name: Nine Mile Point Unit #1
2. Reporting Period: October 1998 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross Mwe): 642
5. Design Electrical Rating (Net Mwe): 613
6. Maximum Dependable Capacity (Gross Mwe): 584
7. Maximum Dependable Capacity (Net Mwe): 565
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr-to-Date Cumulative

11. Ilours in Reporting Period 745.0 7296.0 255,313.2
12. Number of flours Reactor Was Critical 745.0 6645.2 173,647.6
13. Reactor Reserve Shutdown flours 0 0 1,204.2

- 14. IIours Generator On-Line 745.0 6621.3 169,600.1

15. Unit Reserve Shutdown llours 0 0 20.4
16. Gross Thermal Energy Generated (MWil) 1,370,930.0 12,135,434.0 289,610,180.0
17. Gross Electrical Energy Generated (MWi-l) 457,677.0 4,059,782.0 96,412,675.0 l'-
18. Net Electrical Energy Generated (MWil) 445,530.0 3,951,109.0 93,511,237.0
19. Unit Service Factor 100.0 90.8 66.4
20. Unit Availability Factor 1009 90.8 66.4
21. Unit Capacity Factor ('Using MDC Net) 105/o 95.8 60.9
22. Unit Capacity Factor (Using DER Net) 97.6 88.3 59.2
23. Unit Forced Outage Rate 0.0 9.2 22.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

The next refueling outage is currently scheduled to begin 04/05/99; duration is 43 days.

l 25. If shutdown At End of Report Period, Estimated Date of Startup:

l l

l l

L

.. .. . . . - . . .. - - . . _ . . - . . .-. ~_. - . - . . _ - . . - . . - - _ ~ . . . . . . _ . . . - . . .

OPERATINO DATA REPORT

,, NINE MILE POINT UNIT I DOCKET NO.: 50-220 DATE:ll/06/98 PREPARED BY: R. S. Close TELEPilONE: (315) 349-1282 MONTil October 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 587 17 587 2 591 18 599 I 3 590 19 600 4 590 20 601 5 590 21 601 l 6 592 22 602 7 593 23 604 8 593- 24 605 )

9 591 25 605 10 593 26 605 11 595 27 605 12 600 28 605 13 605 29 605 14 599 30 606 15 597 31 606

-16 598 INSTRUCTIONS

- On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

-,ri w

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO: 50-220 NINE MILE POINT UNIT 1 ' o- [

UNITNAME NMP#i DATE:11/0dt98  !

REPORT MONTH-October 1998 PREPARED BY: R. S. Close TELEPHONE- (315) 349-1282 Method of Licensee cause a corrective Duration Shutting Event System Component Action to I

h- Date Type' (Hours) Reason

  • Down Report # Code' Code' Provent Recurrence Reactor
  • No entries this month.

o 4

h I

r P

i i

I t

i i

1 2 3 4 6 .

, F: Forced Reason: Method: Exhibit G -Instructions Exhibit I-Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee l C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161)  ;

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Exam i F-Administrative i G-Operational Error (Explain)

H-Other (Explain)  !

'e NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE I

l l

The plant operated during the month of October 1998 with a Unit Availability Factor of i

100.0% and a Net Design Electrical Capacity Factor of 97.6%. There were no challenges to the Electromatic Relief Valves or Safety Valves. Reductions in Capacity Factor were minimal. Load was reduced due to a #124 Feedwater Heater high level trip and to recover control rod 02-31 following maintenance.