ML18038A342

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1990 for Nine Mile Point Nuclear Station Unit 1
ML18038A342
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200084
Download: ML18038A342 (2)


Text

O'PERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: 1/13/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE:

(315) 349-2443

1. Unit Name:

Nine Mile Point Unit //1

2. Reporting Period:

12/1/90 through 12/31/90

3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

645

5. Design Electrical Rating (Net MWe):

625

6. Maximum Dependable Capacity (Gross MWe):

635

7. Maximum Dependable Capacity (Net MWe):

615

8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative 8,760.0 3,365.8 0.0 3,045.3 0.0 4,069,546,0 1,329,847.0 1,281,458.0 34.8 34.8 23.9 23.5 64.8

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor Was Critical 689,3
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 686.9
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MViGQ 1,221,464.0
17. Gro'ss Electrical Energy Generated (MWH) 420,279.0
18. Net Electrical Energy Generated (MWg 407,331.0
19. Unit Service Factor 92,3
20. Unit AvailabilityFactor 92.3
21. Unit Capacity Factor (Using MDC Net) 89.0
22. Unit Capacity Factor (Using DER Net) 87.6
23. Unit Forced Outage Rate 7.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration ofEach):

Midc cle Outa e for surveillance testin 3 March 91 throu h l3 A ril 91.

186,649.2 118,600.1 1,204.2 115,162,5 20.4 192,542,678.0 63,802,917.0 61,805,840.0 61.7 61.7 54.3 53.4 25.8

25. IfShut Down At End of Report Period, Estimated Date of Startup:
26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRIC1TY COMMERCIALOPERATION

'9102200080 5'10207

~j PDR ADOCK 05000220 R

PDR

K ~

tl

~C1