O'PERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 1/13/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name:
Nine Mile Point Unit //1
- 2. Reporting Period:
12/1/90 through 12/31/90
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
645
- 5. Design Electrical Rating (Net MWe):
625
- 6. Maximum Dependable Capacity (Gross MWe):
635
- 7. Maximum Dependable Capacity (Net MWe):
615
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative 8,760.0 3,365.8 0.0 3,045.3 0.0 4,069,546,0 1,329,847.0 1,281,458.0 34.8 34.8 23.9 23.5 64.8
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor Was Critical 689,3
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 686.9
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MViGQ 1,221,464.0
- 17. Gro'ss Electrical Energy Generated (MWH) 420,279.0
- 18. Net Electrical Energy Generated (MWg 407,331.0
- 19. Unit Service Factor 92,3
- 20. Unit AvailabilityFactor 92.3
- 21. Unit Capacity Factor (Using MDC Net) 89.0
- 22. Unit Capacity Factor (Using DER Net) 87.6
- 23. Unit Forced Outage Rate 7.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration ofEach):
Midc cle Outa e for surveillance testin 3 March 91 throu h l3 A ril 91.
186,649.2 118,600.1 1,204.2 115,162,5 20.4 192,542,678.0 63,802,917.0 61,805,840.0 61.7 61.7 54.3 53.4 25.8
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRIC1TY COMMERCIALOPERATION