ML17056B296

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B296
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/30/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200086
Download: ML17056B296 (2)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:

(315) 349-2443

1. Unit Name: Nine Mile Point Unit //I
2. Reporting Period:

11/I/90 through 11/30/90

3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

645

5. Design Electrical Rating (Net MWe):

625

6. Maximum Dependable Capacity (Gross MWe):

635

7. Maximum Dependable Capacity (Net MWe):

615

8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period
12. Number ofHours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months Midc cle utn e for surveillance tcstln 8,016.0 2,676.5 0.0 2,358.4 0.0 2,848,082.0 909,568.0 874,127.0 29.4 29.4 17.8 17.5 70.2 720.0 6289 0.0 607.0 0.0 1,047,531.0 358,210.0 347,062.0 849 849 78.4 77.1 15.7 (Type, Date and Duration ofEach):

March I throu h 13 A ril 1.

185,9052 117,910.8 1,204.2 114,475.6 20.4 191,321,214.0 63,382,638.0 61,398,509.0 61.6 61.6 54.1 53.3 25.9

25. IfShut Down At End ofReport Period, Estimated Date of Startup:
26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INlTIALELECTRICITY COMMERCIALOPERATION

--- PI,0220008 05000220 910207 pQOCK pDP.

R

~ I ~

PIP 4

J

'lll)