OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlherg TELEPHONE:
(315) 349-2443
- 1. Unit Name:
Niae Mile Point Unit //'I
- 2. Reporting Period: 9/I/90 through 9/30/90
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
645
- 5. Design Electrical Rating (Net MWe):
625
- 6. Maximum Dependable Capacity (Gross MWe):
635
- 7. Maximum Dependable Capacity (Net MWe):
615
- 8. IfChanges Occur ia Capacity Ratiags (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe): 25% power through 9-13-90 and 75% power for the remainder of the month.
- 10. Reasons For Restrictions, IfAny: Power Ascension Testing, Phase I completed (limited to 25%) and operating within Phase 2 (limited to 75%).
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.0
- 12. Number ofHours Reactor Was Critical 720.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 663.5
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 541,882.0
- 17. Gross Electrical Energy Generated (MY'56,384.0
- 18. Net Electrical Energy Generated (MWH) 147,848,0
- 19. Unit Service Factor 92.2
- 20. Unit AvailabilityFactor 92.2
- 21. Unit Capacity Factor (Usiag MDC Net) 33.4
- 22. Unit Capacity Factor (Using DER Net) 32.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration ofEach):
6,551.0 1,303.2 0.0 1,006.4 0.0 733,615.0 193) 302.0 180,017.0 15.4 15.4 4.5 4,4 84.4 184,440.2 116,537.5 1,204.2 113,123.6 20.4 189,206,747.0 62,666,372.0 60,704,399.0 61.3 61.3 54.0 53.1 26.1
- 25. IfShut Down At End ofReport Period, Estimated Date ofStartup:
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL'LECTRIC1TY COMMERCIALOPERATION 9i02200090 910207 PDR ADOCK OS000220 PDR