Revised Monthly Operating Rept for Sept 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B298
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/30/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200090
Download: ML17056B298 (2)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlherg TELEPHONE:

(315) 349-2443

1. Unit Name:

Niae Mile Point Unit //'I

2. Reporting Period: 9/I/90 through 9/30/90
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

645

5. Design Electrical Rating (Net MWe):

625

6. Maximum Dependable Capacity (Gross MWe):

635

7. Maximum Dependable Capacity (Net MWe):

615

8. IfChanges Occur ia Capacity Ratiags (items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe): 25% power through 9-13-90 and 75% power for the remainder of the month.
10. Reasons For Restrictions, IfAny: Power Ascension Testing, Phase I completed (limited to 25%) and operating within Phase 2 (limited to 75%).

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.0
12. Number ofHours Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 663.5
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 541,882.0
17. Gross Electrical Energy Generated (MY'56,384.0
18. Net Electrical Energy Generated (MWH) 147,848,0
19. Unit Service Factor 92.2
20. Unit AvailabilityFactor 92.2
21. Unit Capacity Factor (Usiag MDC Net) 33.4
22. Unit Capacity Factor (Using DER Net) 32.9
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration ofEach):

6,551.0 1,303.2 0.0 1,006.4 0.0 733,615.0 193) 302.0 180,017.0 15.4 15.4 4.5 4,4 84.4 184,440.2 116,537.5 1,204.2 113,123.6 20.4 189,206,747.0 62,666,372.0 60,704,399.0 61.3 61.3 54.0 53.1 26.1

25. IfShut Down At End ofReport Period, Estimated Date ofStartup:
26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIAL'LECTRIC1TY COMMERCIALOPERATION 9i02200090 910207 PDR ADOCK OS000220 PDR