OPERATING STATUS OPERATING DATAREPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period:
10/1/90 through 10/31/90
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
645
- 5. Design Electrical Rating (Net MWe):
625
- 6. Maximum Dependable Capacity (Gross MWe):
635
- 7. Maximum Dependable Capacity (Net MWe):
615
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe): 75% power through 10/23/90
- 10. Reasons For Restrictions, IfAny: Power Ascension Testing, Phase 2 completed (limited to 75%) and operating within Phase 3 This Month Yr-to-Date Cumulative ll. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months 7,296.0 2,0482 0.0 1,751.4 0.0 1,800,551.0 551,367.0 527,065.0 24,0 24.0 11.8 11.6 75.6 745.0 745.0 0.0 745.0 0.0 1,066,936.0 358,065.0 347,048.0 100.0 100.0 75.7 74.5 0.0 (I'ype, Date and Duration ofEach):
185,185.2 117,282.5 1,204.2 113,868.6 20.4 190,273,683.0 63,024,437.0 61,051,447.0 61.5 61.5 54.1 53.2 26.0
- 25. IfShut Down At End ofReport Period, Estimated Date of Startup:
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION