Monthly Operating Rept for Apr 1997 for Nine Mile Point Nuclear Station,Unit 1
ML18037A136
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/30/1997
From: Coleman D
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220314
Download: ML18037A136 (8)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: 5/06/97 PREPARED BY: D. E. Coleman TELEPHONE:

(315) 349-2558

1. Unit Name:

Nine Mile Point Unit //1

2. Reporting Period: April 1997
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

642

5. Design Electrical Rating (Net MWe):

613

6. Maximum Dependable Capacity (Gross MWe):

584

7. Maximum Dependable Capacity (Net MWe):

565

8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months 2879.0 1452.9 0

1445.2 0

2,613,580.0 893,362.0 868,938.0 50.2 50.2 53.4 49.2 2.8 719.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 (Type, Date and Duration of Each):

242,136.2 163729.9 1)204.2 159,801.4 20.4 271,820)360.0 90,471,818.0 87,730,492.0 66.0 66.0 60.0 58.5 22.2

25. Ifshutdown At End of Report Period, Estimated Date of Startup:

May 6, 1997 97052203 j4 7705i2 PDR ADGCK 05000220 R

PDR

I

DOCKET NO.:

50-220 DATE: 5/06/97 PREPARED BY: D. E. Coleman TELEPHONE:

(315) 349-2558 MONTH April 1997 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net)

DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

1

~

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - April 1997 DOCKET NO: 50-220 UNIT NAME: t%VIPf1 DATE:

5/06/97 PREPARED BY: D. E. CoIeman

~

TELEPHONE:

(315) 349-2558 No.

Date Duration (Hours)

Method of Shutting Reason'own Reactor Licensee Event Report //

System Component Code'ode'ause

& Corrective Action to Prevent Recurrence 970303 719.0 C/A The unit was shutdown for a scheduled 354ay refuel outage and has been extended for work on the core shroud.

F: Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG4)161) 5 Exhibit ISame Source

~.

~,

~

~

~

V't 4k

~

NIAGARAMOHAWKPOWER CORPORATION NINE MILEPOINT NUCLEAR STATION UNIT¹1 NARRATIVEOF OPERATING EXPERIENCE The station operated during the month of April 1997 with a Unit AvailabilityFactor of 0.0%

and a Net Design Electrical Capacity Factor of 0.0%.

There were no challenges to the Electromatic Relief Valves.

Reductions in Capacity Factor were due to a scheduled 35 day refuel outage.

The outage was extended to perform inspections and modify tie rods for the core shroud.

The outage is still ongoing.

P