OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 5/06/97 PREPARED BY: D. E. Coleman TELEPHONE:
(315) 349-2558
- 1. Unit Name:
Nine Mile Point Unit //1
- 2. Reporting Period: April 1997
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
642
- 5. Design Electrical Rating (Net MWe):
613
- 6. Maximum Dependable Capacity (Gross MWe):
584
- 7. Maximum Dependable Capacity (Net MWe):
565
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months 2879.0 1452.9 0
1445.2 0
2,613,580.0 893,362.0 868,938.0 50.2 50.2 53.4 49.2 2.8 719.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 (Type, Date and Duration of Each):
242,136.2 163729.9 1)204.2 159,801.4 20.4 271,820)360.0 90,471,818.0 87,730,492.0 66.0 66.0 60.0 58.5 22.2
- 25. Ifshutdown At End of Report Period, Estimated Date of Startup:
May 6, 1997 97052203 j4 7705i2 PDR ADGCK 05000220 R
I
DOCKET NO.:
50-220 DATE: 5/06/97 PREPARED BY: D. E. Coleman TELEPHONE:
(315) 349-2558 MONTH April 1997 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net)
DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
1
~
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - April 1997 DOCKET NO: 50-220 UNIT NAME: t%VIPf1 DATE:
5/06/97 PREPARED BY: D. E. CoIeman
~
TELEPHONE:
(315) 349-2558 No.
Date Duration (Hours)
Method of Shutting Reason'own Reactor Licensee Event Report //
System Component Code'ode'ause
& Corrective Action to Prevent Recurrence 970303 719.0 C/A The unit was shutdown for a scheduled 354ay refuel outage and has been extended for work on the core shroud.
F: Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG4)161) 5 Exhibit ISame Source
~.
~,
~
~
~
V't 4k
~
NIAGARAMOHAWKPOWER CORPORATION NINE MILEPOINT NUCLEAR STATION UNIT¹1 NARRATIVEOF OPERATING EXPERIENCE The station operated during the month of April 1997 with a Unit AvailabilityFactor of 0.0%
and a Net Design Electrical Capacity Factor of 0.0%.
There were no challenges to the Electromatic Relief Valves.
Reductions in Capacity Factor were due to a scheduled 35 day refuel outage.
The outage was extended to perform inspections and modify tie rods for the core shroud.
The outage is still ongoing.
P