ML20247R114
| ML20247R114 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/30/1998 |
| From: | Coleman D, Rich Smith NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NMP91470, NUDOCS 9805290077 | |
| Download: ML20247R114 (5) | |
Text
r 3
l NIAGARA MOHAWK GENERATlON BUSINESS GROUP kdP91'4 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 RE:
Nine Mile Point Nu:: lear Station Unit #1 Docket No. 50-220 I
Subject:
Operating Statistics and Shutdowns - April 1998 Gentlemen:
Submitted herewith is the Operating Data Report, Unit Shutdowns and Power Reductions, and a Narrative of Operating Experience for April 1998 for the Nine Mile Point Nuclear Station Unit #1.
l Very truly yours, Robert G. Smith Plant Manager - NMP1 l
/lh Enclosures pc:
H.J. Miller, Regional Administrator, Region 1 B.S. Norris, Senior Resident Inspector
}\\.
V l
I
,m. 2,*g gogh.o
,e a
e R
V
9 OPERATING DATA REPORT DOCKLT NO.: 50-220 DATE: 5/06/98 PREPARED BY: D. E. Coleman TEL.EPilONE: (315) 349-2558 OPERATING STATUS i
- 1. Unit Name: Nine Mile Point Unit #1
- 2. Reporting Period: April 1998 Notes
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross Mwe):
642
- 5. Design Electrical Rating (Net Mwe):
613
- 6. Maximum Dependable Capacity (Gross Mwe):
584
- 7. Maximum Dependable Capacity (Net Mwe):
565 S. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power f.evel To Which Restricted, if Any (Net MWe):
- 10. Reavms For Restrictions,If Any:
This Month Yr-to-Date Cumulative
- 11. Ilours in Reporting Period 719.0 2879.0 250,8 %.2
- 12. Number of Ilours Reactor Was Critical 688.3 2828.3 169,830.7
- 13. Reactor Reserve Shutdown llours 0
0 1,204.2
- 14. Ilours Geaerator On-Line 662.2 2822.2 165,801.0
- 15. Unit Reserve Shutdown llours 0
0 20.4
- 16. Gross Thermal Energy Generated (MWil) 1,212,877.0 5,168,487.0 282,643,233.0
- 17. Gross Electrical Energy Generated (MWil) 413,335.0 1,773,176.0 94,126,069.0
- 18. Net Electrical Enetgy Generated (MWil) 402,787.0 1,727,331.0 91,287.459.0
- 19. Unit Service Factor 92.1 98.0 66.1
- 20. Unit Availability Factor 92.1 98.0 66.1 21.' Unit Capacity Factor (Using MDC Net) 99.2 106.2 60.4
- 22. Unit Capacity Factor (Uning DER Net) 91.4 97.9 58.8
- 23. Unit Forced Outage Rate 7.9 2.0 22.5 L
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If shutdown At End of Report Period, Estimated Date of Startup: May 22,1998
_ _ _ _ _ ________________________ _ _ a
l OPERATING DATA REPORT DOCKET NO.: 50-220 DATE:5/06/98 :
PREPARED BY: D. E. Coleman TELEPilONE: (315) 349-2558 MONTli April 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)
(Mwe-Net) 1 617 17 610 2
616 18 610 3
616 19 613 4
613 20 613 5
616 21 614 6
615 22 614 7
615 23 612 8
616 24 613 9
616 25 613 10 611 26 614 11 616 27 612 12 616 28 230 13 615 29 0
L 14 615 30 0
15 614 31 16 610 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l.
1.
TAA 3
c END D(
r f
u K T o
o CI YE ty S
ON BN i
e h
DU DO b
EH r
m a
a e
AE inm.
S RP p
o I
e e
e it PL b
E E v
c ot i
s t
n y
h R T itc e
eS x
r u
E P
e or dn rr t u o
5 on c eit Co e c a nl i R nt i
t
&ct en eAn se s
e V
m u
v y
a e
o
)
c r
1 C
P r n 6
f de 1
eg 0
r v e o
m m G
eE E
R r
m s
U a oo N
w R
e(
e d l slie no sa urt ont nF S
e n ae DiR c)
N h o it TC cf L
O uor E oL r
I t
nf t
T n
s
(
o t
C e
Inisr U
o 'd n e t t o aep r
e po Ga h D
8 e
mC p
R E
9 eS o
it R
9 br t
C iPryn 1
e h
R i
xr nv t
E l
m *e EfoEE rp W
A e
4 t d so O
yC H
S P
T D
N m
N O
e mra )n A
M et t
6 ci snr 0
aSla S
T neo c
p r
evp 8
c N
R icEe 9
Si xE W
O L
R l
t l
a u u m (r aa O
P d
D E
onnoe t h T
R
'r h aa ut o
eMMAO t
U ogc M1 234 f
t H
d na 3
ie S
ott h uR 1
T h n I
te N
M Swo m
U D
ax
'n E
e o
)
)
s A
n s
n n
i a
ia e
e l
R lp ic x
nL Et o
( s i
E n) e e c&
t
(
ig r
ios rT rt n r
8 lu t
r si a u ia ieEi 6
o en r o 5
uH Fe Rav D(
c ri l t
n n yT a t
r e agor r o melniatos t
nt
'e i t p
F npt el ana r ur ir nu y
o iuif geme T
s q a e e pd aEMRROA O e
RABCDEFGH 8
2 e
t 24 a
0 D
89 g
3 d
leu d d e e c h roc FS FS 1
l
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of April 1998 with a Unit Availability Factor of 92.1%
and a Net Design Electrical Capacity Factor of 91.4%. There were no challenges to the Electromatic Relief Valves. Reductions in Capacity Factor were due to a forced outage which started on April 28,1998 @ 1509. The unit was removed frorn service due to inoperability of Control Room Emergency Ventilation System. On April 4,1998, #13 Reactor Recirculation Pump was returned to service following preventive maintenance that
- commenced in March. On April 6,1998, #11 Reactor Recirculation Pump was removed from service due to a failed Tach Generator and was returned to service on April 10,1998.
Other reductions in capacity factor were due to two aborted shutdowns. On April 16,1998, the unit commenced a controlled shutdown due to an identified breach in secondary containment. The shutdown was terminated when the Containment Spray Vent valves were shut. On Apiil 17,1998, the unit commenced a controlled shutdown due to a failed surveillance of Reactor Building Ventilation System Isolation valves. The shutdown was terminated when engineering provided analysis to restore operability. Both events resulted in minimalloss of generation.
(
_ _ _ _ _ _ _ _