ML17056B304
Jump to navigation
Jump to search
| ML17056B304 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/31/1990 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200113 | |
| Download: ML17056B304 (2) | |
Text
OPERATING STATUS OPERATING DATAREPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mile Point Unit 8'1
- 2. Reporting Period:
3/1/90 through 3/31/90
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel uta e
arted on anuar 22 1
744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 lType, Date and Duration ofEach):
8 2,160.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 0.0 100.0 180,049.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 62.3 62.3 55.1 54.2 24.7
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved IN1TIALCR1TICALITX INITIALELECTRICITY COMMERCIALOPERATION 9102200113 910207 PDR ADOCK 05000220 R
~y A
4