OPERATING STATUS OPERATING DATAREPORT DOCKET.NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg, TELEPHONE:
(315) 349-2443
- l. Unit Name: Nine MBe Point Unit //1
- 2. Reporting Period:
8/1/89 through 8/31/89
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MW@
- 18. Net Electrical Fnergy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel utn e.
rt d on nnuar 22 1
744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each):
8.
5,831.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 174,9602 115,2349 1,2042 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 64.1 64.1 56.7 55.8 22.0
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL"ELECTRICITY COMMERCIALOPERATION 9 1 02200 12 05000220 4 91020V-FD~
AQQCK FDR R
i1