Monthly Operating Rept for Nov 1998 for Nine Mile Point,Unit 1.With
ML20198D936
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/30/1998
From: Close R, Rich Smith
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NMP91480, NUDOCS 9812230293
Download: ML20198D936 (5)


Text

__

5 NiagarahMohawk' December 11, 1998 NMP91480 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 RE:

Nine Mile Point Nucle' r Station Unit #1 a

Docket No. 50-220 DPR-63

Subject:

Operating Statistics and Shutdowns - November 1998 Gentlemen:

Submitted herewith is the Operating Data Report, Unit Shutdowns and Power Reductions, and a Narrative of Operating Experience for November 1998 for the Nine Mile Point Nuclear Station Unit #1. Submittal of this information complies with Section 6.9.1.c of the Unit #1 Technical Specifications.

Very truly yours, Robert G. Smith Plant Manager - NMP1

/lh Enclosures pc:

H.J. Miller, Regional Administrator, Region 1 I

G. Hunegs, Senior Resident inspector 9812230293 981130 PDR ADOCK 05000220 R

PDR

~ -

l

.t 1

l l

OPERATING DATA REPORT DOCKET NO.: 50-220 l

DATE: 12/03/98 PREPARED BY: R.S. Close l

TELEPlIONE: (315) 349-1282 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit #1
2. Reporting Period: November 1998 Notes
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross Mwe):

642

5. Design Electrical Rating (Net Mwe):

613

6. Maximum Dependable Capacity (Gross Mwe):

584

.7. Maximum Dependable Capacity (Net Mwe):

565

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

j

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any-This Month Yr-to-Date Cumulative ll, llours in Reporting Period 720.0 8016.0 256,033.2
12. Number ofIlours Reactor Was Critical 720.0 7365.2 174,367.6
13. Reactor Reserve Shutdown llours 0

0 1,204.2

14. Ilours Generator On-Line 720.0 7341.3 170,320.1
15. Unit Reserve Shutdown Hours 0

0 20.4 l

16. Gross Thermal Energy Generated (MWII) 1,321,457.0 13,456,891.0 290,931,637.0
17. Gross Electrical Energy Generated (MWil) 449,645.0 4,509,427.0 96,862,320.0
18. Net Electrical Energy Generated (MWil) 437,917.0 4,389,026.0 93,949,154.0
19. Unit Service Factor 100.0 91.6 66.5
20. Unit Availability Factor 100.0 91.6 66.5
21. Unit Capacity Factor (Using MDC Net) 107.6

%.9 61.0

22. Unit Capacity Factor (Using DER Net) 99.2 89.3 59.3 23.' Unit Forced Outage Rate 0.0 8.4 22.3

- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

The next refueling outage is currently scheduled to begin 4/12/99; duration is 43 days.

25. If shutdown At End of Report Period, Estimated Date of Startup i

l

, ~

.... ~....

.. ~. -..

OPERATINO DATA REPORT NINE MILE POINT UNIT 1 l

l DOCKET NO.: 50 220 DATE:12/03/98 l

PREPARED BY: R. S. Close TELEP110NE: (315) 349-1282 l

MONTil November 199N l

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(Mwe-Net)

(Mwe-Net)

)

1-605 17 612 2

607 18 611

~ 3 607 19 611 4

608 20 612 5

608 21 613 6

607 22 612

)

7 608 23 612 8

609 24 614 9

609 25 613 10 609 26 613 11 611 27 614 12 612 28 613 13 611 29 614 14 587 30 614 4

15 563 16 610 l

INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l i

I l

d f

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 NINE MILE POINT UNIT 1.

UNIT NAME: NMP#1-DATE-12/03/98 REPORT MONTH-November 1998 PREPARED BY: R. S. Close TELEPHONE: (315) 349-1282 i

Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to Date Type' (Hours)

Reason Down Report #

Code' Code' Prevent Recurrence 8

h' Reactor' No entries this month.

i L

[

i i

1 2

3 4

5 F: Forced Reason:

Method:

Exhibit G -Instructions Exhibit 1-Same Source S: Scheduled A-Equipment Failum (Explain) 1-Manual for Preparation o' Data i

B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee i

C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Exam t

F-Administrative i

G-Operational Error (Explain)

H-Other (Explain) l I

i l

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The plant operated during the month of November 1998 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 99.2%. There were no challenges to the Electromatic Relief Valves or Safety Valves. Reductions in Capacity Factor were due to a control rod sequence exchange combined with control rod testing (stroke timing).

_ - _ _ _ _ _.