5 NiagarahMohawk' December 11, 1998 NMP91480 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 RE:
Nine Mile Point Nucle' r Station Unit #1 a
Docket No. 50-220 DPR-63
Subject:
Operating Statistics and Shutdowns - November 1998 Gentlemen:
Submitted herewith is the Operating Data Report, Unit Shutdowns and Power Reductions, and a Narrative of Operating Experience for November 1998 for the Nine Mile Point Nuclear Station Unit #1. Submittal of this information complies with Section 6.9.1.c of the Unit #1 Technical Specifications.
Very truly yours, Robert G. Smith Plant Manager - NMP1
/lh Enclosures pc:
H.J. Miller, Regional Administrator, Region 1 I
G. Hunegs, Senior Resident inspector 9812230293 981130 PDR ADOCK 05000220 R
~ -
l
.t 1
l l
OPERATING DATA REPORT DOCKET NO.: 50-220 l
DATE: 12/03/98 PREPARED BY: R.S. Close l
TELEPlIONE: (315) 349-1282 OPERATING STATUS
- 1. Unit Name: Nine Mile Point Unit #1
- 2. Reporting Period: November 1998 Notes
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross Mwe):
642
- 5. Design Electrical Rating (Net Mwe):
613
- 6. Maximum Dependable Capacity (Gross Mwe):
584
.7. Maximum Dependable Capacity (Net Mwe):
565
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
j
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any-This Month Yr-to-Date Cumulative ll, llours in Reporting Period 720.0 8016.0 256,033.2
- 12. Number ofIlours Reactor Was Critical 720.0 7365.2 174,367.6
- 13. Reactor Reserve Shutdown llours 0
0 1,204.2
- 14. Ilours Generator On-Line 720.0 7341.3 170,320.1
- 15. Unit Reserve Shutdown Hours 0
0 20.4 l
- 16. Gross Thermal Energy Generated (MWII) 1,321,457.0 13,456,891.0 290,931,637.0
- 17. Gross Electrical Energy Generated (MWil) 449,645.0 4,509,427.0 96,862,320.0
- 18. Net Electrical Energy Generated (MWil) 437,917.0 4,389,026.0 93,949,154.0
- 19. Unit Service Factor 100.0 91.6 66.5
- 20. Unit Availability Factor 100.0 91.6 66.5
- 21. Unit Capacity Factor (Using MDC Net) 107.6
%.9 61.0
- 22. Unit Capacity Factor (Using DER Net) 99.2 89.3 59.3 23.' Unit Forced Outage Rate 0.0 8.4 22.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
The next refueling outage is currently scheduled to begin 4/12/99; duration is 43 days.
- 25. If shutdown At End of Report Period, Estimated Date of Startup i
l
, ~
.... ~....
.. ~. -..
OPERATINO DATA REPORT NINE MILE POINT UNIT 1 l
l DOCKET NO.: 50 220 DATE:12/03/98 l
PREPARED BY: R. S. Close TELEP110NE: (315) 349-1282 l
MONTil November 199N l
l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(Mwe-Net)
(Mwe-Net)
)
1-605 17 612 2
607 18 611
~ 3 607 19 611 4
608 20 612 5
608 21 613 6
607 22 612
)
7 608 23 612 8
609 24 614 9
609 25 613 10 609 26 613 11 611 27 614 12 612 28 613 13 611 29 614 14 587 30 614 4
15 563 16 610 l
INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l i
I l
d f
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 NINE MILE POINT UNIT 1.
UNIT NAME: NMP#1-DATE-12/03/98 REPORT MONTH-November 1998 PREPARED BY: R. S. Close TELEPHONE: (315) 349-1282 i
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to Date Type' (Hours)
Reason Down Report #
Code' Code' Prevent Recurrence 8
h' Reactor' No entries this month.
i L
[
i i
1 2
3 4
5 F: Forced Reason:
Method:
Exhibit G -Instructions Exhibit 1-Same Source S: Scheduled A-Equipment Failum (Explain) 1-Manual for Preparation o' Data i
B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee i
C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161)
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Exam t
F-Administrative i
G-Operational Error (Explain)
H-Other (Explain) l I
i l
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The plant operated during the month of November 1998 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 99.2%. There were no challenges to the Electromatic Relief Valves or Safety Valves. Reductions in Capacity Factor were due to a control rod sequence exchange combined with control rod testing (stroke timing).