ML17056B316
Jump to navigation
Jump to search
| ML17056B316 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/31/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200133 | |
| Download: ML17056B316 (2) | |
Text
'tx OPERATING S ATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- l. Unit Name:
Nine Mile Point Unit //1
- 2. Reporting Period: 3/1/89 through 3/31/89
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
'23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months R fuel u a e tarted on anua 22 1
744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
88.
2,160.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 171,2892 115)2342 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.5 65.5 57.9 57.0 20.0
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INlTIALCRlTICAL1TY IN1TIALELECTRIC1TY COMMERCIALOPERATION 9l.02O7 PDR ADOCK PDR Q22QQ l~3 Q5QQO220 R
P, VR 4
~l