OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS
- 1. Unit Name: Nine Mlle Point Unit 8'1
- 2. Reporting Period: 3/1/91 through 3/31/91 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 642
- 5. Design Electrical Rating (Net MWe): 625
- 6. Maximum Dependable Capacity (Gross MWe): 635
- 7. Maximum Dependable Capacity (Net MWe): 615
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 188,809.2
- 12. Number of Hours Reactor Was Critical 221.8 1,045.0 119,645.1
- 13. Reactor Reserve Shutdown Hours 0.0 0,0 1,204.2
- 14. Hours Generator On-Line 204.9 18012.4 116,174.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Energy Generated (MWH) 312,160.0 1,685,974.0 194,228,652.0
- 17. Gross Electrical Energy Generated (MWH) 104,148.0 577,592.0 64,380,509.0
- 18. Net Electrical Energy Generated (MWH) 1001733.0 559,660.0 62,365,500.0
- 19. Unit Service Factor 27.5 46,9 61.5
- 20. Unit Availability Factor 27.5 46.9 61.5
- 21. Unit Capacity Factor (Using MDC Net) 22.0 42.1 54.1
- 22. Unit Capacity Factor (Using DER Net) 21.7 41.5 53.3
- 23. Unit Forced Outage Rate 0.0 17.2 25,8
- 24. Shutdowns Scheduled Over Next 6 Months lType, Date and Duration of Each):
Mny 13-16, 1991, the unit will be taken offline to perform n 'Ibrbine Torsional Test.
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INlTIALELECTRICITY COMMERCIAL OPERATION
..9XP41'
- Pgp AOPCy9 9>04p9 pgppp2 PDP
l OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 MONTH March 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 0 2 18 0 3 19 0 4 20 0 5 21 0 6 22 0 7 23 36.6 8 24 107.1 9 25 416.1 10 26 598.5 11 27 609.1 12 28 609.5 13 29 604.4 14 30 607.5 15 31 608.4 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
Ep UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 UNIT NAME: NMPgl DATE: 4/13/91 REPORT MONTH - March 1991 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 Method of 4 Corrective Date Type'uration (Hours)
Shutting Reason'own Reactor Licensee Event Reports System Code'ause Code'omponent Action to Prevent Recurrence No.
910212 S 539.1 Scheduled midcycle outage for surveillance testing.
F: Forced Reason: Method: Exhibit G - Instructions Exhibit I-Same Source S: Scheduled A-Equipmcnt Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Liccnscc C-Rcfu cling 3-Automatic Scram Event Rcport (LER) File (NUREG-0161)
D-Regulatory Restriction 4-Other (Explain) orator Training de License Exam F-Administrative G-Opemtional Error (Explain)
H-Other (Explain)
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT ¹1 NARRATIVE OF OPERATING EXPERIENCE The Station operated during the month of March 1991 with a Unit Availability Factor of 27.5%
and a Net Design Electrical Capacity Factor of 21.7%. There were no challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due mainly to a scheduled midcycle outage for surveillance testing. Other reductions in capacity factor were due to weekly control rod exercising and the inability to obtain 100% CTP due to turbine steam flow limitation. Upon completion of the outage, the unit was synchronized to the grid on 3-23-91 at 1106.
CLASS I WORK - MECHANICALMAINTENANCE- March 1991 See attached printout.
CLASS I WORK - INSTRUMENTS AND CONTROLS - March 1991 See attached printout.
CLASS I WORK - ELECTRICAL MAINTENANCE- March 1991 See attached printout.
t
~ W
NINE" NILE POINT UNIT ONE Hechanical Haintenance - COHPLETED SAFETY RELATED ItRs FOR HARCH 04-02-91 PAGE 1 MR Number EPN Number TITLE Description Corrective Action W185732 33-01R RIICU INBOARD IV VALVE IV 33-01R FAILED LLRT TEST REWORK REPLACED PARTS AS NOTED IN 33-01R VALVE TO REDUCE LEAK RATE TO WITHIN PROCEDURE N1-HHP-033-225 ALSO ACEPTABLE LIHITS LOCATION REACTOR- CLEANED SEATING SURFACES BUILDING PC ELEVATION 263 FEET 6 INCHES NEXT TO PENETRATION X-154 - REFERENCE DRAItING C26852-C SHEET 2 INDEX 3-N2.1-S14
'II192374 33-03 CLEANUP ISOLATION REPAIR VALVE DUE TO FAILED LLRT GREATER REPLACED ISOLATION CHECK VALVE WITH CHECK VALVE THAN 42.5 SCFH OR REPLACE WITH NEW NEll FROH STORES CLEANED GASKETS CENTER SECTION AREA AND RFPLACED GASKETS T IGtlTENED BOLTING SNUG TIGHT
'W185646 38-13 HOTOR OPERATED VALVE VALVE 38-13 LEAKS FROM PACKING AREA REPACKED VALVE 10 RINGS PUT IN 38-13 VALVE MAS LAST REPACKED ON 890819 WR 180280 LOCATION ORYWELL 25o AZ 330 DEGREES W188614 44-18-35 HCU 18-35 SCRAH SCRAH OUTLET VALVE 127 FOR HCU 18-35 IS REPLACED LEAKING DIAPHRAGH WITH NEW OUTLET VALVE LEAKING BY LOCATION REACTOR BUILDING ONF.
?37 M188616 44-38-35 HCU 38-35 SCRAH SCRAH OUTLET VALVE 127 FOR tlCU 38-35 IS REPLACED LFAKING D I APHRAGH WITH NEW OUTLET VALVE 127 LEAKING BY " LOCATION REACTOR BUILDING 0tlE 237 M188478 66-15 ERV 123 VACUUH VACUUH BREAKER DOES NOT CLOSE PROPERLY DISASSEHBLE CLEANED AND REASSEHBLED BREAKER FLAPPER DOES NOT SEAT AND DOES NOT SNAP BACK CLOSED IN A POSITIVE FASHION LOCAT IOtl DRY'MELL EAST ELEVATION 259 M188471 66-15 ERV 123 VACUUH VACUUH BREAKER DOES NOT StlAP BACK PLFASE REPLACED SPRING IN VACUUH BREAKER BREAKER REPAIR OR REPLACE ALSO REPLACED SCREWS IN COVER AND COATED THEH WITH LOCTITE
'M192422 70-86 RBCLC STRAINER OPEN RBCLC STRAINER 70-86 INSPECT CLEAN OPFN STRAINER COVERS AND INSPECT DRYWELL COOLERS AND REPAIR AS REQUIRED FOR BLOCKAGE REPLACED COVERS ALL BOLTS SNUG TIGHT W188419 70-91 70-91 BASKET HANDLE Otl BASKET STRAINER FROZFN UNABLE DISASSFHBLED DOMN TO VALVE PLUG STRAINER ON RBCLC TO SHIFT STRAINERS REACTOR BUILDING 261 CLEANED ANO REASSEHBLED VALVE SUPPLY TO RRPS AUXILIARY CLEAN UP PUHP ROON PLUG TURNS FREELY W188415 70-93 RBCLC SUPPLY TO RRP CHECK VALVE 70-93 FAILED TO SEAT AttD DISASSEHBLED VALVE CLEANED COOLERS CHECK VALVE TEST SATISFACTORY DURING N1-ST-R18 INSTALLED NEIt GASKETS - REASSEHBLED 70-93 SECTION 8.1 - REPAIR VALVE - LOCATED REACTOR BUILDING 261 AUXILIARY CLEANIIP PUHP ROOH M188466 70-95 RBCLC TO DRY WELL VALVE IS STUCK SHUT AS INDICATED BY VENTED AIR FROH DOWNSTREAti SIDE OF COOLERS CHECK VALVE SYSTEH PARAHETERS LOCATION 237 REACTOR CHECK VALVE 70-95 BUILDING SCAFOLDING ALREADY IN PLACE IF ANY PARTS ARE TO BE REPLACED CONTACT JIH FORDERKONZ FOR TRAVELER EVALUATION It185062 70-95 RBCLC TO DRYWELL 70-95 NEEDS TO BE REPAIRED LOCATED IN CLEANED SEAT AND DISC AND INSTALLED COOLERS CHECK VALVE OVERHEAD AGAINST DRY'MELL WALL BY HCUS Otl NEW GASKETS ELEVATION 237 DEFICIENCY TAG 13305 M183418 72-76 11 EHERGENCY SERVICE VALVF STEH IS BENT PLEASE REPLACE REPLACFD STEH PACKING AND BODY H20 TEST VALVE LOCATED SCREEN HOUSE OFF DISCHARGE OF 11 GASKET EHERGENCY SERVICE IIATER PUHP W185754 80-23 80-24 INDICATOR GAUGES ON GAUGES ARE INSTALLED tlOT ON DRAMINGS REHOVED INDICATOR GAUGES AND INLET AND DISCHARGE REHOVE GAUGES AtlD VALVE AND NIPPLES INSTALLED PIPE PLUGS OF PUHPS RESTORE PER DRAMING
NINE HILE POINT UNIT ONE Mechanical Haintenance COHPLETED SAFETY RELATED WRs FOR MAftCH 04-02-91 PAGE 2 WR ttumber EPN Nunber TITLE Description Corrective Action W187794 94-01 INSTRUMENT AIR THE HI Gll PRESSURE PISTON ROD PACK I tlG IS REPI ACED PACKING ALL NEW VALVES COHPRESSOR 11 LEAKING DEFICIENCY TAG 24182 IS ON IAC INSTALLED 11 IN THE VICINITY OF THE HIGH PRESSURE PISION - PLEASE REPAIR AS NECESSARY W185633 94-05 AFTER COOLER APPARENT LEAK FROH AFTERCOOLER PLUGGED TIIREE TUBES LEAKING INVESTIGATE AND REPAIR AS NECESSARY W188011 96-12 CHECK VALVE 96-12 ON REPLACf CHECK VALVE 96-12 PER REPLACED CHECK VALVE DIESEL GENERATOR AIR DISPOSITION OF NCR 1-91"0043 TURBINE COMPRESSOR 102 BUILDING 261 DIESEL GENERATOR ROOM NUMBER 2
'lt188425 96-12 CHECK VALVE 96-12 Ott DIESEL GEttERATOR 102 AIR COHPRESSOR REPLACED VALVE AND INSTALLFD WITH DIESEL GENERATOR AIR 102-2 DISCHARGE CHFCK VALVE LEAKING BACK PROPER THREAD SEALANT COMPRESSOR 102-2 AND PRESSURIZING COHPRESSOR HEAD CAUSING UNLOADER VALVE TO LEAK - TURBINE BUILDING 261 DIESEL ROOM W185 631 96-110 DIESEL GENERATOR 102 DIESEL GENERATOR 102 2 STARTING AIR REPLACE WITH NEW HANDLE 2 STARTING AIR COMPRESSOR DISCHARGE VALVE NEEDS A NEW-COHPRESSOR DISCHARGE HAND WHEEL DEFICIENCY TAG 13335 HUNG ON VALVE AIR COMPRFSSOR
'W192369 201.2"23 CONTAINME'NT OXYGEN LLRT RESULTS HIGH 11.68 SCFH DISASSEMBLE VALVE CLEANED INTERNALS SAHPI.ING ISOLATION DISASSEMBLE AND CLEAN VALVE INTERtlALS LAPPING SEATING SURFACE'ND REPLACF.
VALVE AND ADJACENT PIPING - SEE RAY MOREY VALVF. STEH ASSEHBLY EXTENSION 2437 .NORTH INSTRUHENT ROOM 237 W192368 201.2-27 CONTAINHENT OXYGEN LLRT RESULTS IIIGH 10.89 SCFH DISASSEHBLED VALVE CLEANED SAHPL ING ISOLATION DISASSEMBLE AND CLEAN VALVE ItlTERNALS INTERNALS AND LAPPED SEATING VALVE AND ADJACENT PIPING SEf RAY HOREY SURFACES EXTENSION 2437 - NORTH ItlSTRUMENT ROOM 237 W192 370 201.2-29 CONTAINHENT OXYGEN LLRT RESULTS tllGH 9 23 SCFH DISASSEMBLED VALVE CLEANED SAHPL ING ISOLATION DISASSFHBLE AND CLEAN VALVE INTERNALS INTERNALS AND LAPPING SEATING VALVE AND ADJACENT PIPING - SEE RAY HOREY SURF ACf S TOGETHf R ALSO BLEW OUT EXTENSION 2437 NORTH INSTRUMENT ROOM VALVE BODY AND LINES 237 W188485 301-18-15 CRD 18-15 CRD 18-15 FLANGE BETWEEN ACCUMULATOR AND TIGHTENFD FLANGE PER S-HI-5 3-001 FOOT VALVE IS LEAKING PLEASE INVESTIGATE AND REPAIR THE LEAK REACTOR BUILDING 237 HCU AISLE DFFICIEttCY TAG 14544 W192424 301-126 SCRAM INLET VALVE VALVE IS NOT COHPLETELY SEATING CAUSING REPLACED POSSIBLE LEAKING DIAPHRAGH FOR HCU 02-35 VALVE TO LEAK BY - LOCATED IN REACTOR WITH NEW ONE BUILDING 237 WEST SIDE OF ACCUHULATORS lt 185 62 7 DG-102 COOL I DG 102 LEFT BANK DG 102 LEFT COOLING WATER PUHP IS INSTALLED NEW SEAL KIT AND GASKETS NG WATER PUH COOLING WATER PUHP LEAKING PLEASE REPAIR OR REPLACE PUHP OR P SEALS W185628 DG-102 COOL I DG 102 RIGHT BANK COOLING WATER PUMP IS LEAKING PLEASE INSTALLED NEW SEAL KIT AND GASKETS NG WATER PUH COOLING WATER PUMP REPAIR OR REPLACE THE PUMP OR SEALS P
NINE HILE POINT UNIT ONE 04-02-91 Instrument Controls - COHPLETED SAFETY RELATED WRs FOR HARCH PAGE 3 WR Number EPN Number TITLE Description Corrective Action M188480 01-03 OUTSIDE HSIV 01-03 OUTSIDE HSIV MILL NOT HOVE MHEN TESTED ADJUSTED AIR RELIEF VALVE - THIS UNDER N1-ST-Q26 - VALVE WILL STROKE MILL POSSIBLY REQUIRE CHANGING UNDER NORHAL CONDITIONS BUT 'WHEN PLACED AGAIN AFTER VALVE HEATS UP IN TEST AND GIVEN A CLOSE SIGNAL VALVE MILL NOT HOVE - TROUBLESHOOT
'M185823 01- I B10 J HS I V AREA INSULATION ON WIRES FROH SWITCH IB10J IS REPLACED TFHPERATURE SWITCH TEHPERA IURE 5'Ml TCH CRACKED REPLACE 5'WITCH FOUND DURING Nl-ISP-001-R010 - LOCATION TURBINE BUILDING 261 HSIV ROOH W192 234 01-RN06C HAIN STEAH RAD TOP COVER WILL NOT LATCH ON DRAMER G LATCH DOES NOT EFFECT OPERABILITY HONITOR 112 PANEL NO CORRECTIVE ACTION REQUIRED M192253 32-IA08 BLK D/P RECORDER HAS HIGH HYSTERESIS UNABLE TO REPLACED AHPLIFIFR CORE IA08 - RECORDER BLACK PEN ADJUST TO WITHIN TOLERANCE DEFICIENCY TAG 26452 ON RECORDER F PANEL M192 238 33-01R CLEANUP DISCHARGE VALVE 33-01R FAILED LLRT - STROKE FLUSH PERFORMED TROUBLE SHOOTING ISOLATION VALVE AS NECESSARY Nl-ISP-033-R501 PERFORHED SATISFACTORY AFTER REPAIR BY HA INTENANCE W 188667 36-05C LO LO LO 36-05C MITH CORE DP AT 14 PSID AS READ AT F RAISED Hl GROSS FAIL SETPOINT TO PANEL CHART RECORDER LO LO LO 36-05C HAD 7.19VDC MITHIN TOLERANCE BUT A GROSS FAILURE INDICATION ON RPS ATS KEEPING AS FOUND OPERATING VOLTAGE CABINET C ON REACTOR BUILDING 281 PLEASE OF 7 024 VDC BELOil GROSS TRIP VALUE RECALIBRATE AS NECESSARY WAS ABLE TO THEN RESET GROSS FAIL LED AT RPS CABINET C W187 716 36-1014 NARROW RANGE GEHAC CIIART RECORDER LOCATED IN CONTROL ROOH PERFORHED HAINTENANCE ON TURBINE CHART RECORDER FOR ON F PANEL IS SHOWING ABOUT A 2 INCH CONTROLS FRONT STANDARD DURING VESSEL LEVEL SWING IN VESSEL LEVEL - PLEASE OUTAGE 910200 THROUGH 910300 - DAS INVESTIGATE CAUSE OF THE LEVEL'WING RECORDING SYSTEH CONNECTED TO FEEDMATER CONTROLS TO AID TROUBLESHOOT - REHOVED WHEN COHPLETE M187965 42-1L-04 LIQUID POISON TRANSHITTER HAD STATIC PRESSURE OF 1000 COULD NOT DUPLICATE PROBLEH DISCHARGE PRESSURE PSI APPLIED INDICATOR P I-1L04A READ 1L-04 350 PSI AFTER 45 HINUTES - TROUBLESlioOT M152251 44-44.2-35A LIQUID LEVEL - REFERENCE PROBLEH REPORT 2010 REFERENCE REINSTALLED ITEN 10 CIRCUIT BOARD 44 2-36A CONTROLLER SCRAH FCI DRA'MING 706266 SHEET 1 AND 2 ACCESS AND REHOVED POINT AT WHICH THE DUHP VOLUHE NUHBER 008962169 AND 008962170 ENCLOSER WAS BINDING - DOOR CLOSES INVESTIGATE IF BOARD ASSFHBLY ITEN 10 PROPERLY AT THIS TINE AND SOCKET ASSEHBLY ITEH 6 ARE FULLY CONNECTED ALSO CHECK TO VERIFY THAT SPACERS ITEH 17 ARE PROPERLY INSTALLED PROVIDE CORRECTIVE ACTION TO PROPERLY CONNECT ITEHS 6 AND 10 AND TO PROPERLY INSTALL ITEH 17 M188329 44.2-35A SCRAH DUHP VOLUHE FAILED SW - PLEASE INVFSTIGATE AND REHOVED HODULE DURING LEVEL SCRAH SM REPAIR OR CALIBRATE CAUSING HALF SCRAH TROUBLESHOOTING - REINSTALLED ON CHANNEL 11 RPS - REACTOR BUILDING 237 DURING CONTACT CHECK FUNCTIONED PROPERLY - PERFORHED ISP-044-H005 M1 87692 70-236 RBCLC COOLER IN H2 PLEASE REPLACE RUSTED TUBING AND CLEAN REPLACED FITTINGS AND TUBING PER 02 CABINETS 11 AND COOLER IN CABINET 12 ADJUST FLOWS TO BE S-HI-5 3-001 AND DCR N1-91-001LG034 12 2-5 GPH AS INDICATED ON FI 70-232 CH 11 ALSO CLEANED CHECK VALVE AND 70-237 CH 12 - TURBINE BUILDING 291 P AND ID 26939
t NINE HILE POINT UNIT ONE 04-02-91 Instrument Controls - COHPLETED SAFETY RELATED MRs FOR HARCH PAGE 4 MR Number EPN Number TITLE Description Corrective Action It192294 92-12 APRH 12 DO'MNSCALE INDI CATING LIGHT FAILED. TO NO PROBLEH APPARENT DURING HOST RESET WHILE PERFORHING AS LEFTS IN RECENT PERFORHAWCE OF PROCEDURE N1-ISP-Q-092-322 TROUBLESHOOT N1-I SP-W-092-332 WEEKLY APRH 12 LOCATION CONTROL ROOH G PANEL INSTRUHENT CHANNEL TEST - DOWNSCALE LIGHT DID RESET AS REQUIRED SEE STEP 8.3.11 It192261 92-IRH 15 IRH 15 IRH 15 SIGNAL CABLE IS TWISIED UNDER REPLACED CABLE CoiVNECTOR UNDER VESSEL VESSEL - UNTWISTED CABLE AND TESTED SATISFACTORY - SEE ALSO WR 187708
'W185756 92-IRH18 IRH DETECTOR 18 UtlTMIST CABLES - CABLES SEEH TO BE DISCONNECTED CABLE - REROUTED AND TWISTED AND BINDING 'MHILE DRIVING IN AND RECONNECTED OUT W185 775 92-RH01F IRH 16 AS LEFT POWER IS 20 PERCENT WITH HODE CLEANED CONNECTOR AT DRYMELL SMITCH IN REFUEL AFTER Nl-ISP-092-V205 PENETRATIOW PER IHP-X-092-230 PLEASE TROUBLEStlOOT W192272 92-RH02H IRH 18 DETECTOR DETECTOR MILL NOT GIVE FULL Itt PRFORHED N1-IPH-092-R200 INDICATIOW - FAILED DURING PERFORHANCE To ADJUST PROCEDURE LIHIT SWITCHES tcc OF Nl- ISP-092-M210 - PLEASE TROUBLESlloOT Il187780 92-RI05C APRH/ IRH RECORDER 15 RECORDER DOES WOT FOLLOW Po'WElt LEVEL PEN NONE COULD NOT DUPLICATE PROBLFH STRAIGHT LINES CLEAN REPAIR SLIDE MIRE So PEtl MILL FULLOM POMER LEVEL M192271 92-RI050 IRH 17 RECORDER IRH 17 RECORDER OUT OF SPECIFICATION ADJUSTED VOLTAGE OUTPUT HODULF 210 RED PEN READS HIGH DURING PERFOHANCE OF ADJUSTED ZERO AND SPAN ON Nl- I SP-092-W210 PLF ASE TROUBLESHOOT E RECORDER RI051 CONSOLE CotlTRUL RUOH
'It187176 94-14 INSTRUMENT AIR COHP 12 IAC DISCHARGE AIR TEHP SWITCH IS No CORRECTIVE ACTION HEEDED 12 DISCHARGE AIR READING HIGH WHILE TEST PROBE READING IS CALIBRATIOW WAS OKAY TEHPERATURE SItTICH 200 DEGREE FAHENHE IT THIS SMI'TCH CAtt TRIP THE COHPRFSSOR LOCATEO TB 261 PLEASE RECALIBRATE
'It192260 113-NA I tlSTRUHENT AIR UPPER ISLOATION VALVE ON AIR HEADER IS ACQUIRED A NEM VALVE HANDLF. FROH HEADER WD22 HISSItlG HANDLE ItHI TEY VALVE REACTOR STORES AND INSTALLED BUILDItlG 261 EAST HALLMAY W187827 201 2-450 H2 02 CHANNEL 12 CHART RECORDER RECORDER IS READING LOM IN 4 PERCENT 17 PERCENT RANGES PLEASE CALIBRATE AND PERFORHED CALIBRATION PER VENDOR HANUAL TI GHTFNED LOOSE FITTING
'i c
SIGNAL FROW ACU IS Loll FEEDING THE ADJUSTED CELL PRESSURE RECORDER - LOCATION L PAWFL W188365 201.2-SSW-2 N2 VALVE SSN-2 OFF tl2 VALVE SSN-2 LOCATEO IN THE HSI V ROOH INSTALLED NEM TUBING TO THE VALVE OF N2 PENETRATION ON THE REACTOR SIDE OF'ALVE 01-04 NEEDS AND LEAK TESTED FOR 01-04 To BE REPAIRED
~c W192407 201.2-X-2A 2 PENETRATION X-2A RECONNECT N2 TUBING TO PENETRATION X-2A RECONNECTEO TUBING AS REQUIRED AND
~
01 2-X-28 X-28 AND X-28 VALVES 55-N-2 X-28 AND 55-N-2 LEAK TESTED X-2A - HARKUP 1-91-50101 W188492 201 9-37 N2 TANK 11 PCV CONTROLI.ER FAILS To HAItlTAItl PROPER TANK CALIBRATFD THE SET POINT KNOB ON CONTROLLER PRESSURE VALVE MILL OPERATE 'MHEN 'OVER THE CONTROLLER PER THE VENDOR RIDDEN DEFICIENCY TAG 14551 LOCATION N2 HANUAL AND ADJUSTED IT To HAINTAIN TAtlK 11 OUTSIDE REACTOR BUILDING MEST PRESSURE AT 80 PSI SIDE TROUBLESHOOT
'M192277 202-66 202-66 FLOW SMITCH ~BOVE FLOW SMITCH MILl. NOT ADJUST TO REPLACED AND CALIBRATED NE'M SMITCH FOR RBEV 10KM HEATER SPECIFICATIONS - IT IS LOCATED IN A HIGH VIBRATION AREA - DWYER 1635 289 TURBINE BUILDING NEAR RBEV FILTER TRAINS
NItlE HILE POINT UNIT ONE 04-02-91 Instrument Controls - COHPLETED SAFETY RELATED MRs FOR HARCH PAGE 5 WR Number EPN Number TITLE Description Corrective Action W192 293 210-CHILLER CONTROL ROOM CHILLER OIL DRAMN FROti COtlTROL ROOM COMPRESSOR DRAINED OUT OIL AND PUT IN tlF'M OIL 12 COHPRESSOR 121 121 APPEARS TO BE CONTAHINATED PLEASE CtlANGE AS NECESSARY - TURBINE BUILDING ELEVATION 300 W188476 301-CV-126 126 VALVE ON CONTROL TIIE 126 VALVF. ON CRD UNIT 02-35 IS PERFORHED STEPS 1 THROUGH 11 ROD DRIVE UNIT 02-35 LEAKIWG BY - DEFICIENCY TAG 14536 IS S-HI-5 3-001 ALSO PERFORHED PHT HUNG ON THE SCRAM ItlLET VALVE REACTOR Nl-IPH"044-Vn08 BUILDING 237 M188610 CONT-01-03 HSI V TEST CIRCUITRY HSIVS 01-03 AND 01-04 WOULD NOT STROKE RECALIBRATED PER APPL I CABLF.
Itl TEST PLEASE INVESTIGATE AND REAP IR AS SECTIONS OF PROCEDURE NECESSARY TROUBLFSHOOT DEFICIENCY TAG Nl-ISP "001-R006 14577 ll179469 NEU-12-25A LPRH 12-25A LPRM 12-25A SHOWS EXCESSIVE LEAKAGE REPLACED SHA DETECTOR CONNECTOR AND CURREIIT WHILE DOING IV CURVE LEAKAGE SMA TO LEHO ADAPTER DOUBLES AS VOLTAGE DOUBLES TROUBLESHOOT CLEAN CONNECTORS W186148 NEU-36-41C LPRH 36-41C Lf'RH 36-41C FAILED DOWIISCALE EVEN 'MITH TDR'0 CABLE FROM CONTROL ROOH AND FULL GAIN ON FLUX AHP PLEASE PERFORM TDR FOUND IT TO BE GOOD DETECTOR 'MILL AND REPAIR AS NECESSARY - REPLACES 'MR BE REPLACED NEXT OUTAGE BY REACTOR 186122 TROUBLESHOOT ENGINEER I NG W187821 NEU-IRH18 IRH 18 WIDE RANGE WHILE PERFORHING PROCEDURE NO WORK REQUIRED - PROCEDURE TECH HONITOR FRONT PANEL Wl-ISP-092-V205 STEP 7 6.12 TABLE 2 THE REVIE'M SATISFACTORY AND PROCEDURE HETER HSV HETER READ OUT OF TOLERANCE HIGH FOR MASTER TO BE TCN'D A RAtlGE 5'MITCH OF 9 AND A TEST ATTEtlUATOR OF 8 - TROUBLESHOOT
'M185773 NEU-RH01G IRM 17 MONITOR DURING PERFORMANCE OF Nl-ISP-092-V205 CALIBRATED THE MEAN SQUARE ANALOG ATTACHHENT 3 STEP 7 6 12 HSV HETER WAS HODULE Z 13 AS PER Nl-ISP-092-V205 OUT OF TOLERANCE AT RANGE S'MITCH 10 VS ATTACHHENT 3 SECTION 7 9 TEST ATTENUATOR RANGE 9 POSITION M185774 NEU-RHnlH IRH 18 HONI TOR DURING PERFORMANCE OF Nl-ISP-092-V205 THIS IS A DUPLICATE WORK ORDER ATTACHHENT 4 STEP 7.6.12 HSV METER WAS 'MORK TO BE PERFORMED ON WR 187821 OUT OF TOLERAtlCE AT RANGF. SWITCH 9 VS ISSUED 910101 TEST ATTENUATOR RANGE 8 POSITION W187826 NEU-RI 020 APRH 15 DURING PERFORMANCE OF Nl- I SP-'M-092-335 RECALIBRATED SCRAH TRIP SETPOINT STEP 8 5.4 SCRAM TRIP POINT WAS PER APRH QUARTERLY Nl-ISP-Q-092-325 DISCOVERED TO BE LOM 117 PERCENT COWSERVAT I VE DIRECT IOtl - TROUBLESHOOTING OIILY W188335 RPS-NA ADS CONFIRHATORY DURING PERFORHANCE OF Nl-ISP-R-201-477 PLANT CHAtlGE REQUEST FORM TO BE LOGIC CHANNEL NUHBER AITACtlHENT NUHBER 4 ADS CONFIRHATORY SUBHITTED FOR TEST POINTS TO ALLOW 12 CIRCUIT LIGHT ON F PANEL FAILED TO ILLUHINATE AN EASIER HEANS OF JUHPERING OUT TROUBLE C19859C SHEET 18A TROUBLESHOOT THE RELAYS REQUIRED BY THE PROCEDURE - 1 PLANT CHANGE REQUEST ALREADY IN PART OF BUSINESS PLAN FOR MAINTEtlANCF. 1991
NILE POINT UNIT 04-02-91 Electrical HaintenanceNINE- ONE COHPLETEO SAFETY RELATED MRs FOR HARCH PAGE 6 WR Number EPN Nunber TITLE Description Corrective Action W188345 33-01 33-01 INSIDE CV IV LIHITORQUE ON 33-01 NEEDS TO BE ADJUSTED VERIFIED VALVE CLOSED PROPERLY TO CLOSE PROPERLY FAILEO LLRT VALVE SHUT TORQUE 5'WITCH MORK ING AS DESIGNED FURTHER MANUALLY WITH PROPER THRUST EXERTED DURING VALVE CLOSURE PER N1-EPH-GEN-V125
'M19200 5 37-02 REACTOR VENT VALVE HOLDED CASE BREAKER FAILED THE DLRO TEST REPLACED HOLDED CASE CIRCUIT 12 02 WIIILE PERFORHI NG Nl-EPH-GEN-4Y182 BREAKER M184182 37-06 RX VENT VALVE GREASE IN flAIN GEAR CASE CHARCOAL BLACK REPLACED GEARED LIHIT S'MITCHES ORYMELL FLOODED IN COLOR - RUNNING BY SEALS INTO LIHIT REGREASED MITH HOBIL 28 REGREASED 37-06 SMITCH COHPARTHENT COVER - CHECK GREASE OPERATER WITH EXXON EP-0 IN L IH I TSM I TCH GEAR CASE FOR SOLIDIFICATION REPLACE BOTH GREASES AS NECESSARY - VERIFY AND ADJUST TORQUE SMITCH SEfTINGS ACCORDINGLY
'M181 524 38" 01 38-01 VALVE STEH 38-01 HISSING VALVE STEH PROTECTOR NEED REPLACED STEH PROTECTOR PROTECTOR 5 IN X 15 IN STEH COVER AND CAP CONDUIT
'M188408 39-13 EHERGENCY CONDENSER DURING PERFORHANCE OF Nl-ISP-036-R1106 ADJUSTED ACTUATOR PLATE STEAH SUPPLY DRAIN VALVE 39-13 INDICATED HID TRAVEL C BOTH IV 121 POSITIONS LIGHTS I LLUHINATED UPON INITIATING A CLOSE SIGNAL INSTEAD OF FULL CLOSURE LIGHTS ON K PANEL IN CONTROL ROOH NSR FOR LIHIT 5'MITCH ADJUSTHENT W188468 81-23 81-24 MOTOR HEATER FOR HOTOR HEATERS LOCATED ON CORE SPRAY RECONNECTED CSTDS 111 112 HEATER CORE SPRAY TOPPING TOPPING PUHPS 111 AND 112 ON REACTOR 237 CIRCUIT TO CONFORH TO DRAWING E24 PUHPS 111 AND 112 SOUTHWEST FAIL TO OPFRATE AS NFEDED F39731C PER S"HI-5.3"001 CLEARED BHU W185680 HG-161 BATTERY CHARGER HG DC HACHINE HAKING NOISE REPLACED FUSES AND TIGHTENED FUSE SET 161 TROUBLESHOOTING FOUND FUSES PHYSICALLY HOLDERS BURNED ALSO HOLDERS LOOSE TIGHTEN flOLDERS ROTATE FUSES AS NEEDED REFERENCE DCR Nl-91-001LG004 SDC SC1-0005-91 W192025 PMRB-167 167 FEEDER BREAKER POWER BOARD 168 167 FEEDER BREAKFR P3 REPLACED OVER CURRENT TRIP DEVICE FROH POWER BOARD 168 FAILED LONG TIHE TIHING TEST REPLACE EC1 PHASE 3 009 TRIP DEVICE PH 3 DEFICIENCY TAG 21164