OPERATING DATA REPORT DOCKET NOri 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //I
2. Reporting Period: I/I/90 through I/31/90 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Xr-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 178,633.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188i473i132 0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MW@ 0.0 0.0 60,524,382,0
19. Unit Service Factor 0.0 0.0 62.8
20. Unit Availability Factor 0.0 0.0 62.8
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.5
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.6
23. Unit Forced Outage Rate 100.0 100.0 24.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e rted on anvar 22 1 8

  • '6.

Unit is Test Status (Prior to Commercial Operation): Forecast Achieved r

INITIALCRlTICALITY INlTIALELECTRIC1TY COMMERCIAL OPERATION