OPERATING STATUS OPERATING DATAREPORT DOCKET NOri 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mile Point Unit //I
- 2. Reporting Period: I/I/90 through I/31/90
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Xr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MW@
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e
rted on anvar 22 1
744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
8 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 178,633.2 115,234.3 1,204.2 112,117.2 20.4 188i473i132 0 62,473,070.0 60,524,382,0 62.8 62.8 55.5 54.6 24.0
- '6.
Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved r
INITIALCRlTICALITY INlTIALELECTRIC1TY COMMERCIALOPERATION
'9102200117'10207'DR PDR ADOCK 05000220
V
'C