Revised Monthly Operating Rept for Feb 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B305
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200115
Download: ML17056B305 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Poiat Uait //1
2. Reporting Period: 2/1/90 through 2/28/90 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasoas For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 672.0 1,416.0 179,305.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 11$ ,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated 0.0 0.0 188,473,132.0 (MY'7.

Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0

18. Net Electrical Eaergy Generated (MVGQ 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 62.5
20. Uait Availability Factor 0.0 0.0 62,5
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.3
22. Unit Capacity Factor (Using DER Net)

'.0 0.0 54.4

23. Unit Forced Outage Rate 100.0 100.0 24.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e started on anuar 22 1 88.

tlg

26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved IN1TIALCRITICALITY INITIALELECTRIC1TY COMMERCIAL OPERATION 9102200115 910207 PDR ADOCK 05000220 PDR R