ML17056B312
Jump to navigation
Jump to search
| ML17056B312 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/31/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200126 | |
| Download: ML17056B312 (2) | |
Text
OPERATING STATUS OPERATING DATAREPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name:
Nine Mile Point Unit //1
- 2. Reporting Period: 7/1/89 through 7/31/89
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anuar 22 1
744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each):
88.
5,087.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 174,216.2 115,2349 1,204.2 112,1172 20.4 188,473,132.0 62,473,070.0 60,524,382.0 64.4 64.4 57.0 56.0 21.6
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCR1TICALITY INITIALELECTRICITY COMMERCIALOPERATION 91022 CK 05000220 00126:910207 PDR ADOCb.
R