OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: 7/1/89 through 7/31/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 5,087.0 174,216.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,2349
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,1172
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 64.4
20. Unit Availability Factor 0.0 0.0 64.4
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 57.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 56.0
23. Unit Forced Outage Rate 100.0 100.0 21.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e started on anuar 22 1 88.

26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCR1TICALITY INITIALELECTRICITY COMMERCIAL OPERATION 91022 00126:910207 ADOCb.CK 05000220 PDR R