ML17059B554
Jump to navigation
Jump to search
| ML17059B554 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/31/1997 |
| From: | Coleman D NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17059B552 | List: |
| References | |
| NUDOCS 9705220320 | |
| Download: ML17059B554 (2) | |
Text
OPERATING STATUS Rev.
1 OPERATING DATA REPORT DOCKET NO.:
50-220 DATE: 4/03/97 PREPARED BY: D. E. Coleman TELEPHONE:
(315) 349-2558
- 1. Unit Name:
Nine Mile Point Unit //1
- 2. Reporting Period: March 1997
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
642
- 5. Design Electrical Rating (Net MWe):
613
- 6. Maximum Dependable Capacity (Gross MWe):
584
- 7. Maximum Dependable Capacity (Net MWe):
565
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date (35 Day Refuel Outage scheduled for March 3, 1997) 2160.0 1452.9 0
1445.2 0
2,613,580.0 893,362.0 868,938.0 66.9 66.9 71.2 65.6 2.8 744.0 71.0 0
71.0 0
116) 233.0 39,393.0 38,226.0 9.5 9.5 9.1 8.4 0.0 and Duration of Each):
241) 417.2 163729.9 1,204.2 159,801.4 20.4 271 820 360 0 I
90,471,818.0 87,730,492.0 66.2 66.2 60.2 58.7 22.2
- 25. Ifshutdown At End of Report Period, Estimated Date of Startup:
April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R
i (y
L
~
I
'tg
~
I s()
erg I 41 h