ML17056B303

From kanterella
Revision as of 23:08, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B303
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/30/1990
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200112
Download: ML17056B303 (2)


Text

OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DnhlbergTELEPHONE:

(315)349-24431.UnitName:NineMilePointUnit//12.Reporting Period:4/1/90through4/30/903.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChanges[Occur inCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(¹tMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MY'8.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(I'ype,DateRefueloutaestartedonanua221988.719.00.00.00.00.00.00.00.00.00.00.00.0100.0andDurationofEach):2,879.00.00.00.00.00.00.00.00.00.00.00.0100.0180,768.2 115,234.3 1,2042112,117.2 20.4188,473,132.0 62,473,070.0 60,524,382.0 62.062.054.954.025.125.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:Ma23199026.UnitisTestStatus(PriortoCommercial Operation):

ForecastAchievedINITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION 9i02200ii2 910207PDRAGOCK05000220RPDR J'