ML17325A486

From kanterella
Revision as of 09:25, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ro:On 871124,fire Suppression Water Sys Inoperable.Caused by Planned Isolation of Portion of East Leg of Outside Fire Protection Ring Header to Facilitate Installation of Fire Protection Isolation Valve.Backup Fire Protection Available
ML17325A486
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/24/1987
From: SMITH W G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DAVIS A B
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8712020351
Download: ML17325A486 (5)


Text

ACCESSION NBRFACIL:50-31550-316AUTH.NAt'tESMITHS'.Q.RECIP.NAMEDAVIS'.B.REQULATURY INFORMATION DISTRIBUTION SYSTEM(RIDS)8712020351 DOC.DATE:87/11/24NOTARIZED:

NODOCKET0DonaldC.CookNuclearPoeerPlant'nitiiIndiana~~!05000315DonaldC.CookNuclearPoeerPlantiUnit2iIndiana505000316AUTHORAFFILIATIONIndianaMichiganPoeerCo.(formerlgIndiana~~MichiganEleRECIPIENTAFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

RQ:on871124fir'esuppression eatersosinoperable.

Causedbgplannedisolation of.portionofeastlegofoutsidefireprotectionringheader.Backupfireprotectionavailable fromnearbyfirehydrants'~plantfiretruck.DISTRIBUTION CODE:IE22DCOPIESRECEIVED:

LTRtENCL0SIZE:TITLE:50.73LicenseeEventReport(LER)iIncidentRptietc.NOTES:RECIPIENT IDCODE/MANE PD3-3LAWIGQINGTQNi DCOPIESLTTRENCL11RECIPIENT IDCODE/MANE PD3-3PDCQPIESLTTRENCLINTERNAL:

ACRSNiCHFLSON AEOD/DOAAEOD/DBP/ROAD ARN/DCTS/DAB NRR/DEBT/ADS NRR/DEBT/ELB NRR/DEBT/NEB NRR/DES"/PSB NRR/DEST/SGB-NRR/DLPG/GAB NRR/DREP/RAB S/SB02RESTELFQRDiJRGN3FILE01EXTERNAL:

EG8cGGROH)MLPDRNSICHARRIS'ACRSNOELLERAEQD/DSP/NAS

  • EOD/DSP/TPAB DEDRONRR/DEBT/CEB NRR/DEST/

ICSBNRR/DEST/NTB NRR/DEBT/RSB NRR/DLPG/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR/PtRAS/ILRBRESDEPYGIRES/DE/EI8HSTLQB13YWARDNRCPDRNSICMAYST'TOTALNUNBEROFCOP1ESREQUIRED:

LTTR45ENCL

IndianaMichiganPowerCompanyCookNuciearPlantP.O.Box458Bridgman.

Ml491066164655901November24,1987INDIANAMICHIGAhfPOWERDonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74U.S.NuclearRegulatory Commission

Document, ControlDeskWashington, D.C.20555Attn:A.B.Davis

DearMr.Davis:

ThisistoconfirmaverbalreportmadetoMr.BruceBurgess-ofyourstaffat1140hoursonNovember24,1987.AtthattimeMr.BurgesswasinformedthattheFireSuppression WaterSystemwasnotoperableasrequiredbyTechnical Specification 3.7.9.1.b duetotheplannedisolation ofaportionoftheeastlegoftheoutsidefireprotection ringheader.Thisisolation wasrequiredtofacilitate installation offireprotection isolation valveforthenewcontractors accesscontrolbuildingthatisbeingconstructed fortheSteamGenerator Replacement Project.Theinstallation oftheisolation valveisexpectedtobecompleted withintwodaysandtheFireProtection SystemreturnedtoservicebyNovember26,1987.ThedelugesystemforthePreferred ReserveSourcePowerTransformer (TR-201-AB) wasremovedfromserviceduetotheisolation ofthissectionofFireProtection piping.Twofirehydrantswithintheprotected areawerealsoremovedfromservice.Backupfireprotection isavailable fromnearbyfirehydrantsandtheplantfiretruck.Thisletterwillfulfilltherequirements ofTechnical Specification 3.7.9.1actionb.2bwhichrequiresafollowupreportnolaterthanthefirst.workingday8712020351 87ii24PDRADOCK05000315SPDR following theeventandTechnical Specification 3.7.9.1actionb.2cthatrequiresafollowupreportwithinfourteendays.Respectfully, W.G.Smith,Jr.PlantManager:afhcc:J.E.DolanA.B.Davis,RegionIIIM.P.AlexichR.F.KroegerH.B.BruggerR.W.Jurgensen NRCResidentInspector D.L.Wigginton, NRCR.C.CallenG.Charnoff, Esq.D.HahnINPOPNSRCA.A.BlindDottieSherman,ANILibraryP.A.Barrett/B.

P.Lauzau 1Ci