ML17325B430

From kanterella
Revision as of 08:16, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Special Rept:On 900129,0202,08 & 15,four Fire Suppression Components Inoperable Longer than Allowed by Tech Spec 3.7.10.Fire Door 391 Declared Inoperable Due to Door Being Removed for Replacement.Fire Watch Maintained
ML17325B430
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/08/1990
From: BLIND A A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DAVIS A B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003220062
Download: ML17325B430 (4)


Text

ACCELERATED DLUBUTION DEMOTIONSYSTEMREGULATORY INFORMATXON DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9003220062 DOC.DATE:

90/03/08NOTARIZED:

NODOCKETFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,Indiana&0500031550-316Donald.C.

CookNuclearPowerPlant,-Unit2,Indiana&05000316AUTH.NAMEAUTHORAFFILIATION BLIND,A.A.

IndianaMichiganPowerCo.(formerly Indiana&MichiganEleRECIP.NAME RECXPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

Specialrept:on900129,0202,08

&15,firesuppression components inoperable longerthanallowedbyTS3.7.10.DISTRIBUTXON CODE:IE22DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:RECIPIENT IDCODE/NAME PD3-1LAGIITTER,J.

INTERNAL:

ACNWAEOD/DSP/TPAB DEDRONRR/DET/EMEB9H3 NRR/DLPQ/LHFB11 NRR/DOEA/OEAB11 NRR/DST/SELB 8DNR8D1RFWLRGN3FILE01COPIESLTTRECL11RECIPIENT IDCODE/NAME PD3-1PDAEOD/DOAAEOD/ROAB/DSP NRR/DET/ECMB 9HNRR/DET/ESGB 8DNRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7ENRR/DST/SRXB 8ERES/DSIR/EIB COPIESLTTRECL1EXTERNAL:

EG&GWILLIAMS,S LPDRNSICMAYS,GNUDOCSFULLTXT4111LSTLOBBYWARDNRCPDRNSICMURPHY,G.A 111111NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASIHCONTACTTHE.DOCUMENI'ONTROL DESK,ROOMPl-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:

LTTR35ENCL35 IndianaMichiganPowerCompanyCookNuclearPlantP.O.Box458Bridgman, Ml491066164655901March8,1990INDIANANICHIGANPOWMDonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74UnitedStatesNuclearRegulatory Commission DocumentControlOneWhiteFlintNorth11555Rockville PikeRockville, Maryland20852Attn:A.B.Davis

DearMr.Davis:

Thisspecialreportisbeingsubmitted inaccordance withTechnical Specification 3.7.10actiona,toinformyouthatthefollowing fourfiresuppression components havebeeninoperable longerthanallowedbyTechnical Specification 3.7.10actiona.lj)mU(ci(QA:-OLRcGGau~~gwGGQGI-IiNK('sGKopo.k0)Firedetection intheUnitTwoCDEmergency DieselGenerator Roomwasdeclaredinoperable onJanuary29,1990duetoafailedcircuitboardintheA.C.inverterwhichsuppliesthedetection circuit.Replacement partsfortheinverterarenolongeravailable.

Aplantmodification hasbeeninitiated toreplacetheoldinverterwithanavailable equivalent circuit.Itisanticipated thattheplantmodification willbe'ompleted andthedetection restoredtooperability byApril24,1990.Afirewatch,asrequiredbyTechnical Specification 3.7.10actiona,willbemaintained whilethefiredetection isinoperable.

FireDoor391wasdeclaredinoperable onFebruary2,1990duetothedoorbeingremovedforreplacement.

Itwasrestoredtooperability onFebruary15,1990.Afirewatch,asrequiredbyTechnical Specification 3.7.10actiona,wasmaintained whilethedoorwasinoperable.

FireDampers1-HV-AC-FD-l, 1-HV-AC-FD-2, 1-HV-AC-FD-3, 2-HV-AC-FD-1, 2-HV-AC-FD-2, and2-HV-AC-FD-3, locatedintheUnitOneandUnitTwoP-250ComputerRoomsweredeclaredinoperable onFebruary8,1990whentheyfailedtoautomatically closeduring0 U.S.NucleagulatoryCommission March8,199Page2of2surveillance testing.Anengineering evaluation isbeingperformed todetermine thereasonforthefailuresand,theproperrepairsorreplacements, ifnecessary.

Wewillinformyouviaafollowupreportwhentheengineering evaluation iscompleteandthedampershavebeenrestoredtooperability.

Afirewatch,asrequiredbyTechnical Specification 3.7.10actiona,isbeingmaintained whilethedampersareinoperable.

FireDamper1-HV-AQT-W2, locatedintheUnitOneReactorCableTunnelQuadrant2wasdeclaredinoperable onFebruary15,1990whenitfailedtofullycloseduringasurveillance test.Repairactivities onthedamperhavebeentemporarily suspended duetotheinaccessability ofthedamperoperating mechanism.

Aplantmodification hasbeeninitiated toinstallaserviceportontheventilation ductworkassociated withthedampertoallowrepairactivities tocontinue.

Wewillinformyouthroughafollow-up reportwhentheplantmodification iscompleteandthedamperhasbeendeclaredoperable.

Thedamperwillbemaintained inaclosedpositionuntilrepairactivities havebeencompleted.

Sincerely, A.A.BlindPlantManagerAAB:clwAttachment CC:D.H.Williams, Jr.A.B.Davis,RegionIIIM.P.AlexichP.A.BarrettJ.E.BorggrenR.F.KroegerNRCResidentInspector J.G.Giitter,NRCR.C.CallenG.Charnoff, Esq.DottieSherman,ANILibraryD.HahnINPOS.J.Brewer/B.P.

Lauzau