ML17056B307

From kanterella
Revision as of 00:01, 19 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
ML17056B307
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1989
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200118
Download: ML17056B307 (2)


Text

OPERATINGSTATUSOPERATINGDATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETEDBY:K.A.DahlbergTELEPHONE:(315)349-24431.UnitName:NineMilePointUnit¹12.ReportingPeriod:12/1/89through12/31/893.LicensedThermalPower(MWt):18504.NameplateRating(GrossMWe):6405.DesignElectricalRating(NetMWe):6206.MaximumDependableCapacity(GrossMWe):6307.MaximumDependableCapacity(NetMWe):6108.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted,IfAny(NetMWe):10.ReasonsForRestrictions,IfAny:ThisMonthYr-to-DateCumulative11.HoursinReportingPeriod12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGeneratorOn-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated(MWH)17.GrossElectricalEnergyGenerated(MWH)18.NetElectricalEnergyGenerated~19.UnitServiceFactor20.UnitAvailabilityFactor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.ShutdownsScheduledOverNext6Months(I'ype,DateandRefueloutaestartedonanua221988.744.00.00.00.00.00.00.00.00.00.00.00.0100.0DurationofEach):8,760.00.0,0.00.00.00.00.00.00.00.00.00.0100.0177,889.2115,234.31,204.2112,117420A188,473,132.062,473,070.060,524,382.063.063.055.854.923,625.IfShutDownAtEndofReportPeriod,EstimatedDateofStartup:March7199026.UnitisTestStatus(PriortoCommercialOperation):ForecastAchievedINITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATION9102200118910207PDRADOCK05000220RPDR 4O4,a