IR 05000317/1990004

From kanterella
Revision as of 21:46, 13 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/90-04 & 50-318/90-04.Also Ack Schedular Slippage from 900601 to 0701 for Resolution of Unresolved Items
ML20055C745
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/14/1990
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 9006250026
Download: ML20055C745 (2)


Text

{{#Wiki_filter:_, _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - - - - - - - - _ - - - - - - - - -

         - - - - -
  *
., - . . ,
-
   .,
           (
.

JUN 141990 i Docket No. 50-317  : 50-318 I

           ;

Baltimore Gas and Electric Company

,   ATTN: Mr. George C. Creel
-

Vice President Nuclear Energy Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P.O. Box 1535-Lusby, Maryland 20657 Gentlemen:

           .

Subject: Inspection Nos. 50-317/90-04 and 50-318/90-04 This refers to your letter dated May 25, 199 Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a-future inspection of your licensed program. We acknowledge your schedular slippage from j June 1, 1990 to July 1, 1990, for resolution of unresolved item 50-317/90-04-C2 ' and 50-318/90-04-0 =Your cooperation with us is appreciate

Sincerely, i Ori2inal Signed By- i Ronald R. Bellamy i i Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and Safeguards cc: T. Magette, Administrator, Nuclear Evaluations J. Walte;', Engineering Division, Public Service Commission of Maryland G. Adams, Licensing (CCNPP) K. Burger, Esquire, Maryland People's Counsel P. Birnie, Maryland Safe Energy Coalition Public Document Room (PDR) local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector \ State of Maryland (2) \ OFFICIAL RECORD COPY RL BG&E 90-04/04 - 0001. gs ) km 5

     {DR ADOCK 03000317    3 }

PD i

r?v c ---- - -

      !
,
 *
.. i.,.

t ' Baltimore Gas and 2

 -
 . Electric Company JUN;4 ggg - ,
,

bec: Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o~ enc 1) J. Linville, DRP ' C. Cowgill, DRP D. Limroth, DRP K. Lathrop, DRP . M. Callahan, 0CA-

 ~

i D. Mcdonald, NRR J. Caldwell, NRR t

      >

F

      >

I

      <
      '

RI:0RSS RI:DS RIIDRSS La Bellamy Con {{)n/mk 06/h/90 06/ -/90 06/%/90 0FFICIAL REC 01D COPY RL BG&E 90-04/04 - 0002. /06/90

      !

i

_

 -

3...

 ,- t
  .

.

. .
  ,
   . .

g B ALTIMORE -

 *    GAS AND ELECTRIC I

CHARLES CENTER * P.O. BOX 1475 e BALTIMORE, MARYLAND 21203 1475

         )

Gromot C. CitttL VICC Pats 10tNf wea.. r~t.., aoo........ May 25,1990

  - U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION: Document Control Desk SUBJECT:  Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50 317 & 50 318 NRC Inspection Report Nos. 50-317/90-04 and 50-318S0-04: Unresolved item 50-317/90-04 02 and 50/318-90-04-02 Gentlemen:
         !

Consistent with the agreement noted in the subject report, this letter is to tell you of our progress to l date regarding unresolved item 90-04 02/02

't June 1,1990 target date discusse and to identify schedular slippage past the q L The subject report teveals that the emergency classification and emergency action level scheme for Calvert Cliffs Nuclear Power Plant is consistent with the intent of NUREG 0654, Appendix 1, and with the requirements of 10 CFR~50. However, differences between this scheme and NUREG 0654 were noted as needing modification. Additionally, several suggestions of areas for improvement were also nee "
 -

Baltimore Gas and Electric Company has actively pursued resolution of the noted concerns. Our actions have -included preparation of revised EAL's, review and approval through the Plant Operations and Safety Review Committee, operator training conducted over a 5 week training cycl and briefing of the 3 Plume Zone County Commissions. We have also twice conferred with members of your staff to clarify matters of concer 'y In the course of these activities, we have carefully evaluated the expected impact of the revisions as ' t they would have applied to previously experienced operating conditions. In this review, we

&  determined that our initial proposed policy might have resulted in the consequence of declaring some
"

Unusual Events below the : justifiable threshold. We are conducting a more detailed review to

         >

evaluate and retine our proposed revision. In light of this additional review. we have extended our

 -

expected completion date to July 1,1990. We feel we can implement a single change to resolve all outstanding issues by that date rather than implement a partial resolution now with a second, later revision. Should our plans require further modification, we will keep you informe tI

    {  MU (O V t
     # 9    N

_ _ _ _ _ _ _

     ..  .. . -

m .. .

, .
,..1 - .' ..
  . .

Document Control Desk May.25,1990 --

. - Pa'ge 2 -
       ,
       ;

Should you have any further questions regarding this matter, we will be pleased to discuss them with yo Very truly yours, < m

      /

GCC/LSL/bjd cc: D. A. Brune, Esquire . J. E. Silberg, Esquire :t R. A. Capra, NRC - D. G. Mcdonald, Jr., NRC T, T. Martin, NRC - L E. Nicholson, NRC R. I. McLean, DNR W. J. Lazarus, NRC ' M. R. Knapp, NRC R. R. Bellamy, Dr., NRC C. J. Conklin, NRC i l l l }}