ML20210T506
| ML20210T506 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/16/1999 |
| From: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20210T509 | List: |
| References | |
| NUDOCS 9908190103 | |
| Download: ML20210T506 (1) | |
Text
- /
~. =
Charles H. Cruse Calvert Cliffs Nuclear Power Plant Vice President 1650 Calvert Cliffs Parkway Nuclear Energy Lusby, Maryland 20657 410 495-4455 A Memberof the Constellation Energy Group U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Contrcl Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant i
Unit No. 2; Docket No. 50-318 Cycle 13, Core Operating Limits Report, Revision 0 Pursuant to Calvert Cliffs Nuclear Power Plant Technical Specification 5.6.5, the attached Revision 0 to the Unit 2, Cycle 13, Core Operating Limits Report is provided for your records.
Please replace the Unit 2 Core Operating Limits Report in its entirety, with the attached Revision 0.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours,
/
gp ?
4W CilC/EMT/bjd
Attachment:
As stated cc:
R. S. Fleishman, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector,NRC S. S. Bajwa, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC 1
l 9908190103 990816 l
PDR ADOCK 05000318 P
pm
/
l