Forwards Insp Repts 50-317/90-17 & 50-318/90-15 on 900710-13.No Violations Noted.Util Requested to Provide Complete Corrective Actions Being Considered to Prevent Recurrence of Welding Deficiencies within 30 Days
ML20059E337
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/27/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20059E338 List:
References
NUDOCS 9009100147
Download: ML20059E337 (2)


See also: IR 05000317/1990017

Text

__ _ . .. ..

.7 o

-

,

j.

  • ..

!

AUG 2 71930

-

Docket No. 50-317

50-318

Baltimore Gas and Electric Company

(

ATTN: Mr. George C. Creel

'

.

Vice Fresident

Nuclear Energy.

Calvert Cliffs Nuclear Power Plant

MD Rts 2 & 4, P.O. Box 1535

Lusby, Maryland 20657

Gentlemen:

Subject:

Inspection Report Nos. 50-317/90-17 and 50-318/90-15

This -letter refers to the special inspection conducted by Messrs. H. J. Kaplan

i

and A. Loh.neier of this office on July 10 to' July 13, 1990 at the Calvert Cliffs

Nuclear Power Plant Units 1 and 2 in Lusby,: Maryland. The inspectors discussed

the findings of the' inspection with Mr. C. H. Cruse of your-. staff at the

{

,,

conclusion of the inspection.

<

Areas examined during this inspection are described in the NRC-inspection report

.which is enclosed with this. letter. Within these areas, the inspection consisted

of selective examinations of proce.dures and representative records, interviews

I

with-personnel, and observations by the inspectors.

The welding deficiencies discussed in this report vere self-identified and

appropriate corrective action was immediately taken to resolve them.

Even though

.;

your timely action precludes the'need for any enforcement actions at this time,

these deficiencies indicate the need for an indepth review:of those aspects of

your welding program associated with the identified deficiencies. You are

requested to provide to the NRC within 30' days of receipt of this letter the-

-

,

complete c rrective actions currently being considered to prevent recurrence

{

y

of the welding deficiencies discussed in the attached report. -In> view of the

uncertainties regarding the clogging problem in the salt water cooling system,

you are requested to transmit your strategy to prevent the clogging problem by

.

the same date.

'

'

'

s

Within the scope of this inspection, no violations'were observed.

]

-

1,l

s.

OFFICIAL RECORD COPY

IR CALVERT HK -'0001.0.0

i

08/03/90

9009100147 900827

M;

g(

DR

ADOCK 050 37 l

g

,

-

a

-

~

.-

.;..

,

' 't

'

'

AUG 2 71990

Baltimo'ce-Gas & Electric Co.

2-

4

-Your cooperation with us in this matter is appreciated..

Sincerely,

DrisLui Signed By

Jacque P. Durr

l

Jacque P. Durr, Chief.

1

Engineering Branch

..

Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report Nos.-50-317/90-17-and 50-318/90-15-

cc w/ enc 1:

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service. Commission =of Maryland

G. Adams, Licensing (CCNPP)

K. Burger, Esquire, Maryland People's-Counsel

-

P. Birnie, Marylano Safe Energy Coalition

Public Document Room-(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

i

NRC Resident Inspector

StateofMaryland(2)

-i

bec w/ encl:

!

Region I Docket Room (with concurrences)

i

Management Assistant, DRMA (w/o enc 1)

R. Bellamy, DRSS

,

J. Linville, DRP

b

C. Cowgill, DRP

D. Vito, DRP

B. Summers, DRP

M. Conner, SALP Reports Only

-)

M. Callahan, OCA

D. Mcdonald,-NRR

K. Abraham, PA0 (25) SALP Report and (2) All Inspection Reports

J. Caldwell, EDO

!

RI:DRS

RI:DRS

RT:DRS

RI:DRS

Kaplan

.Lohmeier

Terao

Durr

A).rs

4. L- '

8/ y /90

8/r[/90

8/7/90

8// 6/90

>

1

0FFICIAL RECORD COPY

IR CALVERT HK - 0001.1.0

08/07/90

i

l

l

u