AUG 2 71930
-
Docket No. 50-317
50-318
Baltimore Gas and Electric Company
(
ATTN: Mr. George C. Creel
'
.
Vice Fresident
Nuclear Energy.
Calvert Cliffs Nuclear Power Plant
MD Rts 2 & 4, P.O. Box 1535
Lusby, Maryland 20657
Gentlemen:
Subject:
Inspection Report Nos. 50-317/90-17 and 50-318/90-15
This -letter refers to the special inspection conducted by Messrs. H. J. Kaplan
i
and A. Loh.neier of this office on July 10 to' July 13, 1990 at the Calvert Cliffs
Nuclear Power Plant Units 1 and 2 in Lusby,: Maryland. The inspectors discussed
the findings of the' inspection with Mr. C. H. Cruse of your-. staff at the
{
,,
conclusion of the inspection.
<
Areas examined during this inspection are described in the NRC-inspection report
.which is enclosed with this. letter. Within these areas, the inspection consisted
of selective examinations of proce.dures and representative records, interviews
I
with-personnel, and observations by the inspectors.
The welding deficiencies discussed in this report vere self-identified and
appropriate corrective action was immediately taken to resolve them.
Even though
.;
your timely action precludes the'need for any enforcement actions at this time,
these deficiencies indicate the need for an indepth review:of those aspects of
your welding program associated with the identified deficiencies. You are
requested to provide to the NRC within 30' days of receipt of this letter the-
-
,
complete c rrective actions currently being considered to prevent recurrence
{
y
of the welding deficiencies discussed in the attached report. -In> view of the
uncertainties regarding the clogging problem in the salt water cooling system,
you are requested to transmit your strategy to prevent the clogging problem by
.
the same date.
'
'
'
s
Within the scope of this inspection, no violations'were observed.
]
-
1,l
s.
OFFICIAL RECORD COPY
IR CALVERT HK -'0001.0.0
i
08/03/90
9009100147 900827
M;
g(
DR
ADOCK 050 37 l
g
,
-
a
-
~
.-
.;..
,
' 't
'
'
AUG 2 71990
Baltimo'ce-Gas & Electric Co.
2-
4
-Your cooperation with us in this matter is appreciated..
Sincerely,
DrisLui Signed By
Jacque P. Durr
l
Jacque P. Durr, Chief.
1
Engineering Branch
..
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report Nos.-50-317/90-17-and 50-318/90-15-
cc w/ enc 1:
R. McLean, Administrator, Nuclear Evaluations
J. Walter, Engineering Division, Public Service. Commission =of Maryland
G. Adams, Licensing (CCNPP)
K. Burger, Esquire, Maryland People's-Counsel
-
P. Birnie, Marylano Safe Energy Coalition
Public Document Room-(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
,
i
NRC Resident Inspector
StateofMaryland(2)
-i
bec w/ encl:
!
Region I Docket Room (with concurrences)
i
Management Assistant, DRMA (w/o enc 1)
R. Bellamy, DRSS
,
J. Linville, DRP
b
C. Cowgill, DRP
D. Vito, DRP
B. Summers, DRP
M. Conner, SALP Reports Only
-)
M. Callahan, OCA
D. Mcdonald,-NRR
K. Abraham, PA0 (25) SALP Report and (2) All Inspection Reports
J. Caldwell, EDO
!
RI:DRS
RI:DRS
RT:DRS
- RI:DRS
Kaplan
.Lohmeier
Terao
Durr
A).rs
4. L- '
8/ y /90
8/r[/90
8/7/90
8// 6/90
>
1
0FFICIAL RECORD COPY
IR CALVERT HK - 0001.1.0
08/07/90