Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20062G679 | 21 November 1990 | Forwards SE Determining That Load Profile Used During Surveillance Test Procedures Meets Requirement of Tech Spec 4.8.2.3.2.e,per Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80 | |
IR 05000317/1990028 | 14 November 1990 | Discusses 901102 Enforcement Conference Re Insp Repts 50-317/90-28 & 50-318/90-28 Covering Security Event | Contraband |
ML20216K154 | 13 November 1990 | Forwards Safety Insp Repts 50-317/90-31 & 50-318/90-31 on 901029-1102.No Violations Noted | |
ML20217A013 | 9 November 1990 | Forwards Insp Repts 50-317/90-25 & 50-318/90-25 on 900916-1020.One Noncited Violation Noted | |
ML20058E982 | 1 November 1990 | Forwards List of Unimplemented Generic Safety Issues at Plant,Per Util 900627 Response to Generic Ltr 90-04 | |
ML20058A700 | 19 October 1990 | Forwards Safeguards Insp Repts 50-317/90-28 & 50-318/90-28 on 901010 & 11.Violation Noted | |
ML20058A684 | 17 October 1990 | Forwards Insp Repts 50-317/90-23 & 50-318/90-23 on 900812- 0915.No Violations Noted | |
ML20062B204 | 12 October 1990 | Advises of Acceptance of 900924 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28, Item 2.2,Part 2 Vendor Interface for Safety-Related Components | |
ML20059N942 | 12 October 1990 | Advises of Resolution of Auxiliary Feedwater Issue,Per .Issue Concerns Ability of AFW Sys to Provide Flow to Steam Generators Following Pipe Break | |
IR 05000317/1990008 | 11 October 1990 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08 | |
ML20059N578 | 9 October 1990 | Advises That Util 900510 Submittal of Revised Section of Inservice Insp Program Plan Addressed Provisions of Safety Evaluation | |
ML20062B836 | 9 October 1990 | Forwards Special Team Insp Rept 50-317/90-24 on 900904-07 Re 900830 Reactor Vessel Water Level Anomaly | Reactor Vessel Water Level Temporary Modification |
ML20059N223 | 1 October 1990 | Forwards Safety Evaluation Accepting Proposed Actions Re Potential Design Deficiency,Per LER 89-023 | |
ML20059N118 | 28 September 1990 | Forwards Safety Insp Repts 50-317/90-22 & 50-318/90-21 on 900827-31.No Violations Noted.Post Maint Testing Program Assessed to Be Comprehensive,Well Implemented & Met Objectives of Performance Improvement Program | |
ML20059M775 | 27 September 1990 | Advises That NRC Approved Request for Relief from ASME Code Section XI Re Reactor Coolant Charging Pumps in | |
ML20059K704 | 7 September 1990 | Ack Receipt of Util 900515 Response to Violations Noted in Insp Repts 50-317/90-01 & 50-318/90-01.Agrees That Thrust of Notice of Violation Not Accurate But That Actual Violation Was Failure to Comply w/10CFR50,App B,Criterion Xvi | Non-Destructive Examination Condition Adverse to Quality |
ML20059E337 | 27 August 1990 | Forwards Insp Repts 50-317/90-17 & 50-318/90-15 on 900710-13.No Violations Noted.Util Requested to Provide Complete Corrective Actions Being Considered to Prevent Recurrence of Welding Deficiencies within 30 Days | |
ML20059E192 | 24 August 1990 | Forwards Insp Repts 50-317/90-18 & 50-318/90-17 on 900716-20.No Violations Noted | |
ML20059E298 | 23 August 1990 | Advises That 890313,1103 & 900228 Revs 9,10 & 11 to Plant Contingency Plan,Consistent w/10CFR50.54 & Acceptable.Revs Withheld (Ref 10CFR73.21) | |
ML20058N364 | 9 August 1990 | Forwards Notice of Withdrawal of 900801 Applications for Amend to License DPR-69 Re Shift of Min Pressurization Temp Between 530 & 20 Psia on Heatup & Cooldown Curves | |
ML20058P133 | 8 August 1990 | Forwards Radiation Safety Insp Repts 50-317/90-14 & 50-318/90-12 on 900625-29.No Violations Noted | |
ML20058N048 | 6 August 1990 | Discusses Licensee Engineering Initiatives.Other Power Reactor Licenses in Region 1 Should Provide for Sharing of Info & Experiences Involving Engineering Initiatives & Solutions of Problems Common to All | |
ML20056A408 | 24 July 1990 | Forwards Insp Repts 50-317/90-12 & 50-318/90-11 on 900604-08.No Violations Noted | |
ML20055G595 | 18 July 1990 | Corrected Cover Ltr Forwarding Insp Repts 50-317/90-10 & 50-318/90-10 | |
ML20055G593 | 18 July 1990 | Forwards Corrected Cover Ltr for Insp Repts 50-317/90-10 & 50-318/90-10,revising Insp Rept Numbers | |
ML20055H121 | 18 July 1990 | Advises That Encl Review of Cen 387-P, C-E Owners Group Pressurizer Surge Line Flow Stratification Evaluation, Inadequate.Insufficient Bases Provided to Conclude That Power Surge Line Meets Code Limits for 40-yr Plant Life | |
ML20055F956 | 17 July 1990 | Advises That Actions Re NRC Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Adequate,Per Insp Repts 50-317/90-08 & 50-318/90-08 | |
ML20055F924 | 17 July 1990 | Informs That All Activities Re Reactor Vessel Level Monitoring Sys & Core Exit Thermocouples Completed Except for Tech Specs Based on Review of 870501 & 880427 Submittals | |
ML20055G133 | 12 July 1990 | Forwards Insp Repts 50-317/90-13 & 50-318/90-13 on 900603-30.No Violations Observed | |
ML20055F542 | 10 July 1990 | Advises That Requalification Program Evaluation Scheduled for Wk of 901022.Facility Requested to Furnish Approved Items Listed in Encl 1, Ref Matl Requirements in Order for Examiners to Adequately Prepare for Visit | Job Performance Measure |
ML20055E531 | 6 July 1990 | Forwards Request for Addl Info Re Facility Control Assembly Action Program,Per 900607 Control Element Assembly Failure at Maine Yankee.Confirmation of NRC Understanding That Util Intends to Implement C-E Plan Also Requested | |
ML20055E908 | 2 July 1990 | Forwards Exam Repts 50-317/90-07OL & 50-318/90-07OL on 900507-10 | |
ML20055J318 | 29 June 1990 | Forwards Insp Repts 50-317/90-10 & 50-318/90-10 on 900604-08.No Violations Noted | |
ML20055D073 | 27 June 1990 | Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 901029.Ref Matls,Listed on Encl,Should Be Provided by 900829 | Job Performance Measure |
IR 05000317/1990004 | 14 June 1990 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/90-04 & 50-318/90-04.Also Ack Schedular Slippage from 900601 to 0701 for Resolution of Unresolved Items | |
ML20059M835 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20248E916 | 12 October 1989 | Advises That Licensing Activities Associated W/Nrc Bulletin 88-004,considered Complete | |
ML20248D359 | 25 September 1989 | Forwards Amend 10 to Indemnity Agreement B-70,reflecting Changes to 10CFR140,effective 890701 | |
IR 05000317/1989019 | 22 September 1989 | Forwards Safety Insp Repts 50-317/89-19 & 50-318/89-20 on 890807-11.No Violations Noted | |
ML20247Q278 | 21 September 1989 | Forwards Safety Insp Repts 50-317/89-21 & 50-318/89-21 on 890818 & Notices of Violation & Deviation | |
ML20247P670 | 20 September 1989 | Forwards Request for Addl Info Re Util 890525 Response to Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment. Info Requested within 35 Days of Ltr Date | |
ML20247P661 | 18 September 1989 | Requests Addl Info Re Generic Ltr 88-05, Boric Acid Corrossion of Carbon Steel Reactor Pressure Boundary.... NRC Should Be Notified of Full Implementation of Program within 30 Days Following Implementation | Boric Acid |
ML20247Q237 | 15 September 1989 | Requests Addl Info Re Util 890502 Response to Generic Ltr 89-08 Re Implementation of long-term Erosion/Corrosion Monitoring Program to Ensure Structural Integrity of All & Two Phase high-energy Carbon Steel Sys at Plant | |
ML20247G284 | 13 September 1989 | Approves 890207 Request to Withhold CEN-382(B)-P, Verification of Acceptability of 1-PIN Burnup Limit of 60 Mwd/Kg for Calvert Cliffs,Units 1 & 2 from Public Disclosure (Ref 10CFR2.790) | |
ML20247E831 | 9 September 1989 | Requests Util Furnish Ref Matl in Encl List, Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exam, by 891004.Written Exam Scheduled for 891204 & Operating Exams Scheduled for 891205-08 | Shutdown Margin Job Performance Measure |
ML20246Q178 | 5 September 1989 | Discusses Conclusions of Investigation 1-89-003 Re QC Inspector Harassment & Intimidation by Craft Personnel. Insufficient Evidence Found to Conclude Incidents Constitute Violation of 10CFR50.7.Response Requested within 30 Days | |
ML20246K125 | 31 August 1989 | Ack Receipt of & Payment of Civil Penalty in Amount of $75,000,proposed by NRC in | |
ML20246L330 | 28 August 1989 | Forwards Insp Repts 50-317/89-14 & 50-318/89-14 on 890516-0703 & Notice of Violation.Mgt of Surveillance Programs Has Been Source of Continuing Concern to NRC | |
IR 05000317/1989012 | 24 August 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12 |