Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08
ML20058A463
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/11/1990
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 9010260207
Download: ML20058A463 (2)


Text

.

.

W

'

-

OCT111990

-

.

,

Docket Nos. 50-317 50-318 Baltimore Gas and Electric Company ATTN: Mr. George C. Creel Vice President - Nuclear Energy Calvert Cliffs Nuclear Power Plant MD Rts ; and 4 Post Office Box 1535 Lusby, Maryland 20657 Gentlemen:

Subject:

NRC Region I Combined Inspection Report Nos. 50-317/90-08 and 50-318/90-08 This refers to your letter dated July 3,1990, in response to our letter dated June 4, 1990.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

,

ORIGINAL SIGNED By.

CURTlS J. COWCILL '

Curtis J. Cowgill, Acting Chief Reactor Projects Branch No. 1 Division of Reactor Projects cc:

R. McLean, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland G. Adams, Licensing (CCNPP)

K. Burger, Esquire, Maryland People's Counsel P. Birnie, Maryland Safe Energy Coalition Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2)

l D f' l f e/

OFFICIAL RECORD COPY SUMMERS 698 10/4/90 - 0001.0.0

'Ok 9010260207 901011 10/04/90 PDR ADOCK 050003J7

PDC l

/f

.

.

.

Baltimore Gas and Electric Company

.

g.g bec:

Region I Docket Room (with concurrences)

R. Bellary, DRS$

J. Linville, DRP C. Cowgill, DRP C. Lyon, DRP D. Vito..DRP B. Summers, DRP M. Callahan, OCA D. Mcdonald, NRR R. Capra, NRR J. Caldwell, EDO f.

RI: DRPH RI:DRP b RSummers/mjd CCowgill 10/[0/90'

10fo/90 0FFICIAL RECORD COPY. SUMMERS 698'10/4/90

.0002.0.01 10/04/90

,

l

'

+

.l

__

_

_ --

.

.

o

a

BALTIMORE OAS ANO

,

ELECTRIC

,

CHARLES CENTER e P.O. BOX 1475 e BALTIMORE. MARYLAND 21203 1475

otomot C CattL Vatt Pat tectw, w ci..t...,

oo.n.a...ss July 3,1990 U.S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk SUBJECT:

Calvert Cliffs Nuclear Power Plant

.

Unit Nos.1 & 2: Docket Nos. 50-317 & 50 318 l

NRC Region I Resident Inspection Report Nos. 50 317/90 08 and 50 318N08 REFERENCE:

(a)

Letter from J. C. Limille (NRC) to G. C. Creel (BG&E), dated June 4,1990, same subject Gentlemen:

Attachment (1)is our response to the Notice of Violation contained within the subject Inspection Report.

Should you have any further questions regaiding this matter, we will be pleased to discuss them with you.

Very truly yours,

.

/

'

GCC/JV/bjd Attachment ec:

D. A. Brune. Esquire J. E. Silberg, Esquire

.

R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC L E. Nicholson, NRC R. I. McLean, DNR

,()

_

U" (30Y

i

,

l'

__

,

.

,

,,

.

I A1TACliMENT (1)

-

,

REPLY TO NOTICE OF YlOLATION

.

-

NRC INSPECTION REPORT 50 317/90-08 AND 50 31W90-08 i

STATEMENT OF VIOLATION Calvert Cliffs Technical Specification 6.8.1 states that written procedures shall be established, maintained, and implemented covering the applicable procedures recommended in Appendix *A* of Regulatory Guide 1.33, Revision 2, February 1978. Appendix "A* of Regulatory Guide 1.33. Rev. 2, 1978, requires administrative procedures for equipment control (e.g., locking and tagging).

Administrative procedure Calvert Cliffs Instruction (CCI).309B requires that the operation of any locked valve be annotated and approved in the '1.ocked Valve Deviation Log".

+

Contrary to the above, on April 20,1990, three valves were unlocked and repositioned in the Waste Gas Decay system without adequate documentation and verification which resulted in an unplanned release of the #13 Waste Gas Decay Tank.

IIACKGROUND

An unplanned release of #13 WGDT occurred during the recent startup of Unit One. The event was reviewed by our Startup Review Board which consisted of all site Managers. Evidence of insufficient attention to detail and informality of communications was revealed. This has received management attention and additional emphasis through communications and monitoring will be presided.

A Human Performance Evaluation System review was performed and identified the lack of clarity regarding the intent of CCI.309B, " Locked Valves," as contributing to the event. The following specific problems were noted in CCI 3098:

CCI 309B states that, "Whenever any locked valve is taken out of ".s locked position, such deviation shall be logged in the Locked Valve Deviation Log " However, CCI 3098 does not specify that the valve be logged before it is taken out of its locked position. In this event, the log was completed after the valve was taken out of its locked position.

CCI 309B requires that the Control Room Supervisor (CRS) approve a locked valve deviation before the valve is placed in the out of normal position, but does not specify how the approval must be given. A space is provided in the log for his initials approving the deviation, but since the log is not required before the valve manipulatinn, ti., procedure implies that he can give his approval by other methods. In this case, C'AS permission was given to manipulate the valves prior to their being logged by directing the WGDT release to be performed.

The event and all corrective actions are discussed in LER $0 317S016.

col (RECTIVE STEPS TilAT llAVE BEEN TAKEN The intent of CCI 309B regarding control of locked valves was formally communicated in writing to the operating shifts. A valve deviation sheet will be completed prior to operating locked valves and the Control Room Supenisor will document his approval of those operations by initialing the sheet.

CORRECTIVE STEPS TilAT WILL BE TAKEN TO AVOID FURTIIER VIOLATIONS A revision to CCI.309 to clarify the required documentation and verification of the operation of locked valves has been recommended foi approval by the Plant Operations and Safety Review Committee and is expected to be implemented by July 31,1990-1

{

e

.

.

.,

,

,

A'ITACilMENT (1)

.

,,.,

REPLY TO NOTICE OF VIO1ATION

.

NRC INSPECTION REPORT 40 317/90 08 AND $0 31N_003 DATE WilEN FtfLL COMPLIANCE WILL HE ACIIIEVig}

Full compliance was achieved with the formal wTitten communication of the intent of CCI 3098 to the operating shifts on April 24,1990.

.

!