Annual Assessment Letter EOC 2006 - Calvert Cliffs Station (IR 05000317-07-001 and 05000318-07-001)
ML070610618
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/02/2007
From: David Lew
Division Reactor Projects I
To: Spina J
Constellation Generation Group
McDermott, B J, RGN-I/DRP/610-337-5233
References
IR-07-001
Download: ML070610618 (5)


Text

UNITED STATES rch 2, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2007001 AND 05000318 /2007001)

Dear Mr. Spina:

On February 12, 2007, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (PIs)

for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 performance for the third and fourth quarters of 2006 was within the Regulatory Response column of the NRCs Action Matrix, based on one finding of low to moderate safety significance (White) identified in September 2006. The White finding involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency diesel generator. The supplemental inspection for this finding was completed in January 2007 and based on the positive results, this finding will be removed from consideration in the performance assessment process after the second quarter of 2007. All PIs for Unit 1 indicate performance at a level requiring no additional NRC oversight (Green). Unit 2 performance for the most recent quarter, as well as for the first three quarters of 2006, was within the Licensee Response Column of the NRC's Action Matrix, based on all Green inspection findings and all PIs. Therefore, we plan to conduct reactor oversight process (ROP)

baseline inspections at Units 1 and 2. We also plan to conduct additional ROP inspections based on your planned Unit 2 reactor vessel head replacement and containment sump modification.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Enclosure: Calvert Cliffs Inspection / Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Energy Coalition R. Hickok, NRC Technical Training Center State of Maryland (2)

Page 1 of 2 Calvert Cliffs 03/02/2007 08:27:49 Inspection / Activity Plan Report 22 01/01/2007 - 06/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71007 - U2 RX HEAD REPLACEMENT 2 2 IP 71007 Reactor Vessel Head Replacement Inspection 01/08/2007 04/13/2007 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 01/09/2007 01/12/2007 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 04/01/2007 04/13/2007 Other Routine ISFSI - ISFSI CONSTRUCTION INSPECTION 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/08/2007 01/12/2007 Other Routine SUP - SUP EDG 1 1 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 01/22/2007 01/26/2007 Supplemental Program 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/29/2007 02/02/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 01/29/2007 02/02/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/29/2007 02/02/2007 Baseline Inspections MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 01/29/2007 02/02/2007 Baseline Inspections 71007 - U2 RX HEAD REPLACEMENT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 02/05/2007 03/28/2007 Other Routine 71121 - OCC RAD PROT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 03/05/2007 03/09/2007 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/05/2007 03/09/2007 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/12/2007 03/16/2007 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS 2 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 03/26/2007 04/04/2007 Safety Issues MODS - MODS & 50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 04/16/2007 04/20/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 04/16/2007 04/20/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/23/2007 04/27/2007 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1, 2 IP 7111105T Fire Protection [Triennial] 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 06/25/2007 06/29/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/13/2007 08/17/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 03/02/2007 08:27:49 Inspection / Activity Plan Report 22 01/01/2007 - 06/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112102 ALARA Planning and Controls 08/13/2007 08/17/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/13/2007 08/17/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/13/2007 08/17/2007 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 09/10/2007 09/14/2007 Baseline Inspections 7111111B - L.O. REQUAL. PROG. + P/F REVIEW 4 1, 2 IP 7111111B Licensed Operator Requalification Program 11/26/2007 11/30/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/01/2007 10/05/2007 Baseline Inspections 7111401 - EP EXERCISE & PI VERIFICATION 4 1, 2 IP 7111401 Exercise Evaluation 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 10/29/2007 11/02/2007 Baseline Inspections 5/16 EXM - OPERATOR LICENSING INITIAL EXAMS 4 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 04/21/2008 04/25/2008 Not Applicable 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 05/19/2008 05/23/2008 Not Applicable 7111107B - HEAT SINK INSP 1 1, 2 IP 7111107B Heat Sink Performance 02/04/2008 02/08/2008 Baseline Inspections 7111108P - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 02/22/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 02/25/2008 02/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/25/2008 02/29/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATION INSPECTION 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 03/10/2008 03/14/2008 Safety Issues 7111121 - CDBI 7 1, 2 IP 7111121 Component Design Bases Inspection 06/02/2008 06/06/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/23/2008 06/27/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Enclosure: Calvert Cliffs Inspection / Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Energy Coalition R. Hickok, NRC Technical Training Center State of Maryland (2)

Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO M. Kowal, NRR D. Pickett, PM, NRR M. David, PM, NRR (Backup)

B. McDermott, DRP B. Fuller, DRP S. Kennedy, DRP, SRI C. Newgent - Resident OA Region I Docket Room (with concurrences)

RidsNrrDirsIpab@nrc.gov Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: S:\ROP-7 EOC Review\2006 ROP-7 Annual Assessment Letters\PDF Merged files\Annual Assessment Letter Calvert Cliffs.wpd SUNSI Review Complete: BJM (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME BFuller BMcDermott DLew DATE 3/01/07 3/01/07 3/01/07 OFFICIAL RECORD COPY