April 15, 1999
.
Mr. Charles H. Cruse
Vice President - Nuclear Energy
Baltimore Gas and Electric Company (BGE)
Calvert Cliffs Nuclear Power Plant.
1650 Calvert Cliffs Parkway
Lusby, MD 20657 - 4702
SUBJECT:
NRC REGION 1 INTEGRATED INSPECTION REPORT NOS. 50-317/99-01
AND 50-318/99-01
Dear Mr. Cruse:
This report transmits the findings of the safety inspection conducted by NRC inspectors at the
Calvert Cliffs Nuclear Power Plant from January 31, to March 20,1999. The enclosed report
presents the results of that inspection. At the conclusion of the inspection, these findings were
discussed with Mr. Katz and others of your staff.
,
Overall, the NRC has concluded that your facility was operated in a safe manner. Our inspectors
observed that your planning and preparation for the Unit 2 refueling and maintenance outage
were effective. The shutdown activities, including going to the reduced inventory condition for
steam generator nozzle dam installation, were completed successfully.
Within the area of plant support, we found that you continued to implement effective Radiological
Environmental Monitoring and Meteorological Monitoring Programs. Your maintenance and
calibration of the meteorologicalinstrumentation was effective. Your environmentallaboratory
effectively analyzed samples and conducted quality assurance and quality control activities to
verify program performance.
Based on the results of this inspection, the NRC determined that one violation of NRC
requirements occurred. The violation is being treated as a non-cited violation (NCV), consistent
with Appendix C of the Enforcement Policy. This NCV is described in the subject inspection
f
report. If you contest the violation or severity level of the NCV, you should provide a response
/[/
within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with
copies to the Regional Administrator, Region I and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001.
9904220177 990415
ADOCK 05000317
-
G
0FFICIAL RECORD COPY
IE:01
l
T
.
Charles H. Cruse
2
.
We appreciate your cooperation. In accordance with 10 CFR 2.790 of the NRC " Rules of
Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document
Room (PDR).
I
Sincerely,
Original Signed by:
l
1
l
l
l
G. Scott Barber, Acting Chief
Projects Branch 1
i
Division of Reactor Projects
Docket / License Nos.: 50-317/DPR-53
50-318/DPR-69
!
Enclosure: NRC Region 1 Integrated Inspection Report Nos. 50-317/99-01and 50-318/99-01
cc w/enct:
B. Montgomery, Director, Nuclear Regulatory Matters (CCNPP)
l
R. McLean, Administrator, Nuclear Evaluations
l
J. Walter, Engineering Division, Public Service Commission of Maryland
l
K. Burger, Esquire, Maryland People's Counsel
l
R. Ochs, Maryland Safe Energy Coalition
State of Maryland (2)
l
l
l
l
__
.
'
Charles H. Cruse
3
Distribution w/ encl:
H. Miller, RA/J. Wiggins, DRA (1)
Nuclear Safety Information Center (NSIC)
PUBLIC
NRC Resident inspector
'
Region i Docket Room (with concurrences)
S. Barber, DRP
W. Cook, DRP
R. Junod, DRP
Distribution w/ encl: (VIA E-MAIL)
M. Tschiltz, RI EDO Coordinator
S. Stewart - Calvert Cliffs
S. Bajwa, NRR
A. Dromerick, NRR
M. Campion, Rl
inspection Program Branch, NRR (IPAS)
R. Correia, NRR
DOCDESK
i
DOCUMENT NAME: G:\\ BRANCH 1\\CC990101.WPD
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
l
OFFICE
Rl/DRP
_
lE Rl/DRP
lE
NAME
SStewart%ha155
SBarbe6/5_.
DATE
04/)999
04/l5/99
OFFICIAL RECORD COPY
!