ML20211K309

From kanterella
Jump to navigation Jump to search
Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025
ML20211K309
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/27/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 9909070188
Download: ML20211K309 (3)


Text

  • .

l l

. August 27, 1999 l l Mr. Charles H. Cruse l Vice President - Nuclear Energy l Baltimore Gas and Electric Company l

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 - 4702

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - CALVERT CLIFFS j

! l

Dear Mr. Cruse:

In a telephone conversation on August 26,1999, Mr. L. Briggs, Examiner / inspector, and Mr. Bill Bernie, Supervisor, Requalification Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Calvert Cliffs Nuclear Power Plant. The

, inspection is planned for the week of October 25,1999, which coincides with your regularly I

l scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for l this inspection, please furnish the exam week schedule and the written examinations and operating tests scheduled for the week of the inspection to the NRC by October 4,1999.

Mr. Bemie has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. ,

This letter contains information collections that are subject to the Paperwork Reduction Act of 0 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000. j The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any ,

, aspect of this collection of information, including suggestions for reducing the burden, to the

. Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet electronic mail atBJSi@NRC. GOV: and to the h

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503. ,

6-The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

.~

' 9909070188 990027 PDR ADOCK 050003 7 V

I. ,

f.

l Mr. Charles H. Cruse Thank you for your cooperation in this matter. If you have any questions regarding this 3 inspection, please contact L. Briggs at (610) 337-5366.

Sincerely, l ORIGINAL SIGtED BY:

l Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety Docket No. 50-317,50-318 cc:

l B. Montgomery, Director, Nuclear Regulatory Matters (CCNPP) '

R. McLean, Administrator, Nuclear Evaluations i J. Walter, Engineering Division, Public Service Commission of Maryland K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition l

. State of Maryland (2)

N. Winters, Training Supervisor l

~

l Mr. Charles H. Cruse l Distribution:

H. Miller, RA/J. Wiggins, DRA (1)

D. Screnci, PAO l Nuclear Safety Information Center (NSIC)

PUBLIC 1 NRC Resident inspector l Region i Docket Room (with concurrences) l M. Evans, DRP l W. Cook, DRP R. Junod, DRP W. Lanning, DRS -

B. Holian, DRS L. Briggs, DRS OL Facility File (V. Curley, DRS)

NCoN!e,DRS Distribution w/ encl: (VIA E-MAIL)

M. Tschiltz, RI EDO Coordinator S. Stewart - Calvert Cliffs E. Adensam, NRR A. Dromerick, NRR Inspection Program Branch, NRR (IPAS)

DOCDESK l

DOCUMENT NAME: G:\HPEPB\ BRIGGS \CC60DAYRPILEB.WPD Tn recolve a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure T = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS 3 . l Rl/DRS , j l l .

NAME LBriggs/J# RContp(//d DATE 08/27/99 08/)]99- 08/ /99 08/ /99 08/ /99

'~

OFFICIAL RECORD COPY I

1

  • j I

L j