IR 05000327/1986042

From kanterella
Revision as of 16:28, 17 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Based on Listed Addl Discussions & info,870406 Response Denying Violation Noted in Insp Repts 50-327/86-42 & 50-328/86-42 Valid.Example 2 of Subj Violation Withdrawn. Util Statement Re Solenoid Qualification Data Clarified
ML20236B007
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/22/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8707280301
Download: ML20236B007 (2)


Text

_ _ _ _ _ _ _ _ _ _

i-s'

'

j .

)

~

V JUL 2 2 U37 Tennessee Valley Authority MTTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout P' ace 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJEC INSPECTION REDORT NOS. 50-327/86-42 AND 50-328/86-42 l

We have completed our evaluation of your April 6, 1987 response tc our February 26, 1987 letter concerning Violation 50-327,328/86-42-01 (Example 2). It has been. concluded that your reason for cenial is valid based on the following additional discussions and information:

1) The information presented in your April 6, 1987 respons ) Information obtained during the NRC inspection in April 1987 (87-22).

3) Discussions with ASCO concerning the subject valv ) Discussions with Franklin Research Center concerning ASCO solenoid valve Accordingly, we are withdrawing Example 2 of the subject violatio We do, however, wish to clarify a statement made on page 2 of the enclosure to your April 6,1987 response. In paragraph 2 of Item 1, TVA makes the statement that the ASCO NP8316 solenoid qualification maintenance data sheets (QMDSs)

and to 'que values for the valve bonnet-body screws were reviewed as part of the NRC EQ maintenance inspection conducted Deceiaber 8-12, 1987. This is incorrect, in that the NRC inspectors did not look at any ASCO qualification binders, QMDds, or valve bonnet-body screw torque values duri.ng the inspectio The only solenoid valve data reviewed during the inspection were for non-ASCO valve While this has no bearing on the above conclusion, it siauld be clarified for the recor We appreciate your cooperation in this matte

Sincerely, OfflGINAL SIGNED By q GARY G. ZECH Gary G. Zech, Assistant Director, Inspection Programs D' vision of TVA Projects Office of Special Projects cc: (See page 2)

"

8707POO301 870722 PDR ADOCK 05000327 G PDR ND

' ML_

_ _ _

.

'

JUL 2 21987

!

,

Tennessee Valley Authority 2 i

cc: LH. L. Abercrombie, Site Director Sequoyah Nuclear Plant IK A. Kirkebo, Director,

' Nuclear Engineering 14. L. Gridley, Director Nuclear Safety and Licensing d4 R. Harding, Site Licensing Manager bec: Of G. Keppler, OSP i 1&. D. Ebneter, OSP LR A. Iwolinski, OSP LB. D. Liaw, OSP L& D. Richardson, OSP 01A t.Sc R. Connelly,/RII K. P..Barr, 0$P (NRC Resident Inspector NRC Document Control Desk State of Tennessee

)

RII 5" R 20S I /bSP ad .sah

>

ucLFMc oy h

'arr 7Q//87 7//7/8'7 7/(lb7

,

- _ _ - . _ _ _ _ _ _ _ _ _ _ .