Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation
ML20217A945
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/27/1999
From: Fredrickson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20217A948 List:
References
50-327-99-05, 50-328-99-05, NUDOCS 9910120123
Download: ML20217A945 (5)


See also: IR 05000327/1999005

Text

~

..-

3

,

September '27, 1999

.

Tennessee Valley Authority

ATTN: Mr. J. A.- Scalice.

Chief Nuclear Officer and

Executive Vice President '

6A Look'out Place

1101 Market Street

Chattanooga, TN 37402-2801-

SUBJECT: NRC INTEGRATED INSPECTION REPORT NO. 50-327/99-05 AND

50-328/99-05

Dear Mr. 'Scalice:

On August 28,' 1999, the NRC completed an inspection at your Sequoyah 1 & 2 reactor facilities.

The enclosed report presents the results of this inspection. The results of the inspection were

discussed on September 7,1999, with Mr. M. Bajestani and other members of your staff.

'The inspection was an examination of activities conducted under your license as they relate to

safety and compliance with the Commission's rules and regulations and with the conditions of

your license.- Within these areas the inspection. consisted of a selective examination of

procedures and representative records, observations of activities, and interviews with personnel.

Specifically, the inspection covered periodic resident inspections and a scheduled engineering

1

inspection.-

The NRC identified one issue of low safety significance that has been entered into your

' corrective action program. The issue is discussed in the summary of findings and in the body of

the attached inspection repost. The issue was determined to involve a violation of NRC

requirements, but because of its low safety significance the violation is not cited. If you contest

_

this non-cited violation, you should provide a response within 30 days of the date of this

inspection report, with the basis for your deniel, to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington DC 20555-0001; with copies to the Regional

I

. Administrator, Region ll; the Director, Office of Enforcement, United States Nuclear Regulatory

Commission, Washington, DC 20555-0001; and the NRC Resident inspector at the Sequcyah

facility. l

k

991o12o123 99o927

PDR ADOCK 05o00327

G. PDR g.

q ..

l

!.... . . . .. . . . . .

.

, , . . .. .

.

..

,

i

  • i

g

TVA 2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and any response you choose to make will be placed in the NRC Public Document

Room.

Sincerely,

(Original signed by Paul E. Fredrickson)

Paul E. Fredrickson, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Enclosure: NRC Inspection Report

cc w/ encl:

Karl W. Singer, Senior Vice President

Nuclear Operations

Tennessee Valley Authority

Electronic Mail Distribution

Jack A. Bailey, Vice President

Engineering and Technical Services

Tennessee Valley Authority  ;

Electronic Mail Distribution i

Masoud Bajestani

Site Vice President

Sequoyah Nuclear Plant

Electronic Mail Distribution ,

General Counsel

Tennessee Valley Authority

Electronic Mail Distribution

N. C. Kazanas, General Manager

Nuclear Assurance

Tennessee Valley Authority

Electronic Mail Distribution

cc w/enci continued: See page 3

_

-

.

TVA 3

cc w/ encl: Continued

Mark J. Burzynski, Manager

Nuclear Licensing

Tennessee Valley Authority

Electronic Mail Distribution-

- Pedro Salas, Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

D. L. Koehl, Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

Debra Shults, Manager

Technical Services

Division of Radiological Health

Electronic Mail Distiibution

County Executive

Hamilton County Courthouse

Chatta;eooga, TN 37402-2801

I

!

!

l

,

-,

,

TVA 4

Distribution w/ encl:

. R. W. Heman, NRR

H. N. Berkow, NRR

'

PUBLIC

I

l

3

i

!

l

e

  • See revious cor3c9rJence . Attached

UttlU : MIWPO' f Mil:UKF MII:UKF MII:UKF Nd / -

SIGNATURE [/ (/

" " "

/ARiry/jy /.

NAME- PFsylor alt MShannon DStarkey RTelson 3Bf5kV3 ' u ,

DATE V9/ V /99 - 9/ /99 9/ /99 9/ /99 Ed 7/99 l

YES NO YES NO YES NO

~

COPY? - 'nVES NO fMES) NO

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SQ\ REPORTS \99050BP'wpd

09-20-1999 11:56AM. FROM SEQUOYM RESIDENT OFFICE TO 14045624515 P.02

.. .

i

TVA 4

pjftribution w/ encl:

R. W. Heman, NRR

H. N. Berkow, NRR

PUBLIC

OFFICE / Ril:DRP Ril_:DRP Rll:DRP _ [lil:DEP Rll:DRS

-SlGNATI)RE {& Frie. WJ tGGV.97///A

NAME / PTaylor alt MShannon DStarkey RTelson JBlake

DATE / 9/ /99 9/2f/99 9/r//99 9/27/93 9/ /99

nopYf? YFR NO YFR (NCD Y P R M JT1 YFR 610) YPR NO

~

OFFig'IAL RECORD COPY DOCUMENT NAME:

C:\W DOWS \ Profiles \rdt\ Desktop \99050RP.wpd

I

1

l

TOTP.L P.02

- - _ .