Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) 1999-09-07
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G7711990-11-20020 November 1990 Forwards Computer Printout of Generic & Plant Specific Info Contained in NRC Sims for Facility.Requests That Sims Printout Be Updated W/Actual or Projected Completion Dates for MPA Items within 90 Days of Receipt of Ltr ML20062F5491990-11-16016 November 1990 Forwards Insp Repts 50-327/90-34 & 50-328/90-34 on 901006- 1105 & Notice of Violation ML20217A5461990-11-14014 November 1990 Ack Receipt of 901026 Response to Violations Noted in Insp Repts 50-327/90-28 & 50-328/90-28.Implementation of Corrective Actions Will Be Examined During Future Insp IR 05000327/19900221990-11-13013 November 1990 Ack Receipt of Addl Response to Violations Noted in Insp Repts 50-327/90-22 & 50-328/90-22.Corrective Actions Will Be Examined During Future Insps ML20217A6051990-11-0909 November 1990 Forwards Augmented Insp Team Repts 50-327/90-36 & 50-328/90-36 on 901011-19.NRC Concludes That Multiple Failures of Main Steam Check Valves on 901008 Resulted from Inadequate Recognition & Correction of Deficiencies ML20062F1831990-11-0808 November 1990 Advises That 901015 Rev 25 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20058E1111990-11-0202 November 1990 Grants 901023 Request for Extension of 60-day Reporting Requirement for Cycle 5 Radial Peaking Factor Limit Rept ML20058F1141990-11-0101 November 1990 Forwards Insp Repts 50-327/90-32 & 50-328/90-32 on 900906- 1005 & Notice of Violation IR 05000327/19900181990-10-31031 October 1990 Ack Receipt of Addressing Open Unresolved Items in Insp Repts 50-327/90-18 & 50-328/90-18 ML20058A8441990-10-11011 October 1990 Forwards Insp Repts 50-327/90-29 & 50-328/90-29 on 900827-31 & Notice of Violation ML20062A0611990-10-0909 October 1990 Expresses Appreciation to Util for Prompt and Extensive Support Extended to NRC Following Fire at Inspector Home ML20059N5811990-10-0202 October 1990 Forwards Insp Repts 50-327/90-31 & 50-328/90-31 on 900910-14.No Violations or Deviations Noted ML20059N0711990-10-0202 October 1990 Requests Util to Provide within 45 Days of Receipt of Ltr Listing of All Commitments Made to Justify Restart of Plant IR 05000327/19900231990-09-19019 September 1990 Confirms 900924 Mgt Meeting in Atlanta,Ga to Discuss ALARA Program & Weaknesses Noted in Insp Repts 50-327/90-23 & 50-328/90-23 ML20059F9071990-09-10010 September 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $75,000,per NRC ML20059H3741990-08-31031 August 1990 Forwards Insp Repts 50-327/90-26 & 50-328/90-26 on 900706-0805.Noncited Violations Noted ML20059H0311990-08-30030 August 1990 Forwards Insp Repts 50-327/90-23 & 50-328/90-23 on 900625-29 & 0730.Weaknesses Noted.Util Encouraged to Provide Increased Mgt Attention to Radiological Controls to Assure That Significant Decline in ALARA Program Does Not Occur ML20059H3531990-08-29029 August 1990 Forwards Insp Repts 50-327/90-27 & 50-328/90-27 on 900730-0803.No Violations or Deviations Noted ML20056B4991990-08-21021 August 1990 Forwards Evaluation of Westinghouse Owners Group Bounding Analysis,Per Util Response to Bulletin 88-011, Pressurizer Surge Line Thermal Stratification ML20058P8111990-08-0303 August 1990 Forwards Insp Repts 50-327/90-21 & 50-328/90-21 on 900709-13.No Violations or Deviations Noted ML20056A4751990-07-26026 July 1990 Forwards Insp Repts 50-327/90-22 & 50-328/90-22 on 900606- 0705 & Notice of Violation.Nrc Decided Not to Hold Enforcement Conference or Propose Civil Penalty Because Significant Changes in Plant Mgt Occurred ML20055H9261990-07-25025 July 1990 Advises That 900119 Response to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations, Acceptable ML20055H8851990-07-25025 July 1990 Considers 900425 Request for Approval to Eliminate Site Local Recovery Ctrs Withdrawn.Review Terminated IR 05000327/19900091990-07-20020 July 1990 Discusses SALP Repts 50-327/90-09 & 50-328/90-09 & Forwards Summary of 900530 SALP Meeting.Improvements Noted.Encourages Pursuance & Monitoring of Effectiveness of Corrective Actions ML20055G5651990-07-20020 July 1990 Forwards Order Imposing Civil Penalty in Amount of $75,000, Per 900412 Notice of Violation.Violation Regards RHR Pump Deadheading.Requests Listed Info within 30 Days of Ltr Date ML20055F9181990-07-19019 July 1990 Discusses Corrective Actions for Feedwater Control Problems During Unit 2,Cycle 3 Restart.Nrc Concludes That Feedwater Control Study Addresses Problems of feedwater-related Trips That Occurred in 1988 & 1989 ML20055G3381990-07-18018 July 1990 Advises of Closure of Review of Generic Ltr 83-28,Item 2.2.2 Re Vendor Interface for safety-related Components ML20055F7971990-07-16016 July 1990 Advises That 900126 Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment, Acceptable.Documentation Re Implementation of Generic Ltr & Results of Programs Should Be Retained in Plant Records ML20055D8231990-07-0303 July 1990 Advises That Util 890223,0512 & 900204 Responses to Generic Ltr 88-14 Re Instrument Air Sys Acceptable ML20055D2611990-06-29029 June 1990 Requests Addl Info Re Alternative Testing of Reactor Vessel Head & Internals Lifting Rigs ML20055H3901990-06-29029 June 1990 Forwards Insp Repts 50-327/90-20 & 50-328/90-20 on 900506-0606.No Violations or Deviations Noted IR 05000327/19900141990-06-25025 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/90-14 & 50-328/90-14 ML20059M8551990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248E2291989-09-28028 September 1989 Requests Addl Info Re Implementation of Suppl 3 of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS, within 30 Days of Ltr Receipt IR 05000327/19890111989-09-26026 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/89-11 & 50-328/89-11 ML20248C1121989-09-22022 September 1989 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $87,500 from Insp on 890506-0605 ML20248C7361989-09-21021 September 1989 Discusses Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 891211.Encl Ref Matl Requested by 891011 in Order to Meet Schedule ML20247K3121989-09-14014 September 1989 Forwards Safety Evaluation Accepting ATWS Mitigation Sys for Plant.Atws Requirements Under Review to Determine to What Extent Tech Specs Appropriate ML20247N8421989-09-14014 September 1989 Forwards Amend 9 to Indemnity Agreement B-82,reflecting Rev to 10CFR140,increasing Primary Layer of Nuclear Energy Liability Insurance ML20247E6811989-09-0707 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/89-17 & 50-328/89-17 ML20247A9981989-08-31031 August 1989 Forwards Insp Repts 50-327/89-14 & 50-328/89-14 on 890424-28 & Notice of Violation.Insp Determined That Plant Personnel Failed to Follow Established Procedures for Assuring Proper Voltage on Shutdown Boards ML20246L0061989-08-29029 August 1989 Advises That Util 890612 Response to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs, Acceptable ML20246P6741989-08-29029 August 1989 Forwards Insp Repts 50-327/89-20 & 50-328/89-20 on 890717-20.No Violations or Deviations Noted ML20246M5791989-08-25025 August 1989 Forwards Insp Repts 50-327/89-19 & 50-328/89-19 on 890706-0805 & Notice of Violation ML20245K2111989-08-17017 August 1989 Confirms 890809 Withdrawal of Application for Permission to Dispose of Low Activity Radwaste in Sanitary Landfill,Per 10CFR20.302 ML20245K4311989-08-10010 August 1989 Forwards Insp Repts 50-327/89-18 & 50-328/89-18 on 890606-0705 & Notice of Violation ML20245K8741989-08-10010 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/89-15 & 50-328/89-15 ML20245L3001989-08-0808 August 1989 Forwards Insp Repts 50-327/89-11 & 50-328/89-11 on 890626-30 & Notice of Violation 1990-09-19
[Table view]Some use of "" in your query was not closed by a matching "". Category:OUTGOING CORRESPONDENCE
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
See also: IR 05000327/1990020
Text
,
, ,
. ..
.
.
.
( ' w y,..,,e4;f
4
R S 9118g)
w
}
1
g
s ' ' Docket-Nos. 50-327 and 50-328- t
.. .
- w,
- License-Nos.'.DPR-77 and DPR-79
O Mr. Oliver D.fKingsley, Jr-.
n -Senior.Vice President, Nuclear-Power 1
. Tennessee Valley Authority '
6N;38A Lookout Place .
~
1101 Market Stuare. 1
1 Chattanooga, W 37402-2801 q
[ [DearMr.-Kingsl?y:-
1
SUBJECT: NRC liSPECTION REPORT NOS. 50-327/90-20 AND 50-328/90-20
,
This refers to the Nuclear Regulatory Commission (NRC) routine monthly
inspection conducted by P. Harmon-from May.6,J1990 through June 6',-1990, iThe
,.
-inspection included a review of activities authorized for your Sequoyah
K facility. At the conclusion. of the inspection, the' findings were discussed. ,
with those members of your staff-identified in the enclosed inspection report.
~
l
w
Areas examined during the inspection are identified in the report. Within
these areas, the inspection: consisted of selective examinations of procedures
and representative records, interviews with personnel, and' observation. of-
activitiesL.in progress. ,
'
O hWithin' the ~ scope of the inspection,- violations or deviations were not-
- identified.
.
i.
!; In accordance with Section 2.790(a) of the-NRC's " Rules of Practice," Part 2L
L ' Title 10, Code of = Federal Regulations, a copy of this ~ 1etter and its enclosure '
l' will be placed in the NRC's Public' Document Room.
-Should you have any questions concerning this letter, please contact us.
L ' Sincerely,
m a
l
OrtWnalSignsd By - y
ElWCEA.WitSON ;
Bruce A. Wilson, Chief
, TVA Projects
Enclosure:
. NRC Inspection Report
L, cc w/ encl: (See page 2)
- '
l:
'
1: "e 9007260137 900629
PDR ADOCK 05000327 ea
Q PDC 8%%
v. f
R7; .
^
- i:
t.
-
,7
= - - JUN e0900
. .
.- ,-
..
<*
.,
Tennessee Valley Authority- 2
'
cc w/ encl:
- M. Runyon, Chairman Dr. Henry Myers, Science Advisor .
Committee on Interior and' . Tennessee Valley Authority "
,
Insular Affairs ET 12A 7A ,
,
U. S. House of Representatives ,
400 West Sununit Hill ~ Drive ,
Washington, D. C. 20515 Knoxville, TN 37902
C. A. Vondra, Plant Manager C. H. Dean, Jr.,- Director '
' Sequoyah. Nuclear Plant Tennessee Valley Authority
. Tennessee Valley Authority ET 12A 11A >
P. 0. Box 2000 400 West Summit Hill Drive
Soddy-Daisy, TN '37379 Knoxville, TN 37902
- E. G. Wallace, Manager J. B. Waters, Director
r; Nuclear Licensing and Tennessee Valley Authority
Regulatory Affairs ET 12A 9A
Tennessee Valley Authority 400 West Summit Hill Drive
SN 157B Lookout Place Knoxville, TN 37902
Chattanooga, TN .37402-2801-
W. F. Willis
M. Burzynski Chief Operating Officer-
Site Licensing Manager ET 128 16B
Sequoyah Nuclear Plant 400 West Summit Hill Drive
P. O. Box 2000 Knoxville, TN 37902
Soddy-Daisy, TN 37379
D. Nunn, Vice President
TVA Representative . Nuclear Engineering
'Rockville Office Tennessee Valley Authority ;
11921 Rockville Pike 400 West Summit Hill Drive
Suite 402 WT 12A 12A
Rockville, MD 20852 Knoxville, TN 37902'
General Counsel Dr.-M. O. Medford
'
Tennessee Valley Authority Vice President and Nuclear !
400 West Summit Hill Drive Technical' Director
ET 118 33H Tennessee Valley Authority
Knoxville, TN 37902 6N 38A Lookout Place
Chattanooga, TN 37402-2801
Michael H. Mobley, Director
Division of Radiological' Health County Judge
T.E.R.R.A. Building Hamilton County Courthouse
150 -9th Avenue North Chattanooga, TN 37402
Nashville, TN 37247-3201
State of Tennessee ,
bec w/ encl: (See page 3)
l-
1
i
i
- -, : -
.i. * >
,
.,
J
M 89iWOL l
.
,'
.
.. .
.
. .
n u.;: Tennessee Valley Authority.
-
3 l- l
-- p
7h
.
bec - w/ enc 1': -- ;
'
S, D. Ebneter, RIIc
' G._C. Lainas, NRR
'
- S._C. Black, NRR t
F. J. Hebdon, NRR
.
'
...
L.~J. Watson,' TVAP/RII
-
,
!'
J.-B. Brady, TVAP/RII ,
i
J. N. Donohew, NRR' -
<
>
NRC Document-Control Desk
'
'
NRC Resident' Inspector '
U.S. Nuclear Regulatory Comission~ ;
'
2600'Igou_ Ferry _
Soddy-Daisy, :TN ,.37379 ,
4
-
,
T
.i
i
i
1
.
,
TV 1 TVAP/RII-
' JBrady:vy9
-
L son 4
06/2?/90 06 g/90
,
t