Forwards Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010 & NOV Re Failure to Perform Adequate Testing to Ensure That Low Voltage Circuit Breakers Would Perform Satisfactorily in Svc
ML20195G533
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/09/1998
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20195G537 List:
References
50-327-98-09, 50-327-98-9, 50-328-98-09, 50-328-98-9, NUDOCS 9811230021
Download: ML20195G533 (5)


See also: IR 05000327/1998009

Text

- _ - _ . - _ - _ _ - _ _ _ _ _ - _ _ _ _

. _ - _

._

..

.

-

1

tovenber 9,1998

Tennessee Valley Authority

ATTN: Mr. J. A. Scalice

. Chief Nuclear Officer and

Executive Vice President

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2f.:01

SUBJECT:

NRC INSPECTION Ri' PORT NO. 50-327/98-09 AND 50-328/98-09 AND

NOTICE OF VIOLATIGN

Dear Mr. Scalice:

This refers to the inspection conducted on August 30,1993 through October 10,1998 at the

Sequoyah Nuclear Plant facility. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities at the Sequoyah facility was generally

characterized by good operations and maintenance. Engineering support was considered to be

acceptable and plant support was considered to be good in the area of radiological control.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. The violation is cited in the enclosed Notice of Violation (NOV) and the

circumstances surrounding it are described in detail in the subject inspection report. The

violation involved failures to perform adequate testing to ensure that low voltage circuit breakers

would perform satisfactorily in service.

The NRC has concluded that information regarding the reason for the violation, and the

'

corrective actions taken and planned to correct the violation and prevent recurrence and the

date when full compliance will be achieved is already adequately addressed on the docket in

this report. Therefore, you are not required to respond to this letter unless the description

therein does not accurately reflect your corrective actions or your position. In that case, or if

you choose to provide additional information, you should follow the instructions specified in the

enclosed Notice.

1

I

I

I

98112 M 1 981109

l

$DR

ADOCK 05000327

PDR

.

-

. . . , . . . . .

.

..

. .

.

..f

,

. - ~ . -

..

.

..-

- . .

. . .

.

- . - . . - . - - .

_ . -

.

o

.

TVA

2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

(Original signed by Harold O. Christensen)

Harold O. Christensen, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos. 50-327,50-328

License Nos. DPR-77, DPR-79

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encis:

Senior Vice President

Nuclear Operations

Tennessee Valley Authority

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Jack A. Bailey, Vice President

Engineering and Technical Services

Tennessee Valley Authority

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402 2801

,

Masoud Bajestani

Site Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

General Counsel

- Tennessee Valley Authority

ET 10H

400 West Summit Hill Drive

Knoxville, TN 37902

cc w/encls continued: See page 3

--

-

,

>

TVA

3

cc w/encis: Continued

Raul R. Baron, General Manager

Nuclear Assurance

Tennessee Valley Authority

4J Blue Ridge

1101 Market Street

Chattanooga, TN 37402-2801

Mark J. Burzynski, Manager

Nuclear Licensing

Tennessee Valley Authority

4J Blue Ridge

4

1101 Market Street

Chattanooga, TN 37402-2801

Pedro Salas, Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

J. T. Herron, Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy Daisy, TN 37379

Michael H. Mobley, Director

Division of Radiological Health

3rd Floor, L and C Annex

401 Church Street

Nashville, TN 37243-1532

County Executive

Hamilton County Courthouse

Chattanooga, TN 37402

Distribution w/encis:

!

L. R. Plisco, Ril

!

R. W. Hernan, NRR

F. Hebdon, NRR

W. C. Bearden, Rll

C. F. Smith, Rll

E. D. Testa, Ril

Distribution w/encls continued : See page 4

.-

-

-

.

.

. .

.

.

-

.

.

. . -

.

-

J

i

TVA

4

j

l

Distribution w/encis: Continued

D. H. Thompson, Ril

L. S. Mellen, Ril

PUBLIC

NRC Resident inspector, Operations

i

' U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

Spring City, TN 37381 -

NRC Resident inspector

Sequoyah Nuclear Plant '

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

  • See previous concu Tence - attached

OFFICE

Ril;DRP

Ril:DRP

Ril:DRP

Ril:DRP

R)l@RP

lin:DRS

All:pp

SIGNATURE

(y g

17 g

(fp p

pg g

7g/gg

=

"

4

NAME

P Taylor att

M Shanno6

R Starkey

R Telson

R Carrigh

E Girard

JBlake

6ETI

11/ 4 /98

tily/98

til /98

11/ /98

11/4,/98

11/ f, /98

y/gi, /98

COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

/TES)

NO

//YES / NO

OFFICE

Ril:DR9h(_

"

SIGNATURE

Qg

,<

NAME

D Joney y

DATE

A V /98

11/ /98

11/ /98

11/ /98

til /98

11/ /98

11/ /98

M?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

i

OM RECORD COPY

DOCUMENT NAME: G:\\SQ\\ REPORTS \\ SEQ 9809.RPT

._

_ _ _ . . _ . - _ . _ _ . . - . _ _ _ . _ . _ - _ . . . _ . _ . . . _ -

. _.

_ - . _ _ _ _ . . _ _ _ . _ . _ _ .

.,

'

-20*d wiol

.

.

,

,.

i:

1-

1TVA

5

Distribution w/encis: Continued

D. H. Thompson, Ril

,

L

L. S. Mellen, Ril

'

PUBLIC

4

'

NRC Resident inspector, Operations

'

U. S. Nuclear Regulatory Commission

i

'1260 Nuclear Plant Road

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

i

2600 Igou Ferry Road

Soddy-Daisy,TN 37379

l

l

I

i

!

j

i

i

j

l

i

UPrn,c

Iqst;usu-

RII; g

rm.unr

RM.g

Ril:DRP

RH:usw

"'!:'

=

,

n _ mx

o n <gwrfgr

WWIE .

P Taylor art

M p anon

R Stanley

l R Totton

R C-..g,

E G;...J

J BInhe

unTE .

111 155

/11/ 15 5

111 7 158

111 ')#35

11'

  1. 88

III

l

II# *

I

muussumIWW

NAME

D Jones

j

unym .

111 pg5

1 11

15 5

11I 138

111 13 5

11'

  1. 38

11#

  1. 8'

I'#

  1. "

w 1s

vu

NO

Yrs

NO

Tes

NO

Tea

NO

N

W

M

N

N

N

~

,

E

'

20*d ~

SISPE95tr0PI

Ol'

33Id30 IN30IS3d HUA0nO3S WO&l

WdOS:TO 866T-60-IT

-.

.