05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)

From kanterella
Jump to navigation Jump to search
Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)
ML20206Q353
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/11/1999
From: Bajestani M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206Q360 List:
References
NUDOCS 9905190108
Download: ML20206Q353 (2)


LER-2099-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)
Event date:
Report date:
3272099001R00 - NRC Website

text

--

Tennessee Valley Authority, Post Offee Box 2000, Soddy Daisy, Tervessee 37379-2000 Masoud Bajestani Site Vce President Sequoyah Nuclear Plant May 11, 1999 U.S. Nuclear Regulatory Commission 10 CFR 50.73 ATTN: Document Control Desk washington, D.C.'20555 Gentlemen:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 1-- DOCKET No. 50-327 - FACILITY OPERATING-LICENSES DPR-77 LICENSEE EVENT REPORT (LER) 50-327/1999001 The enclosed report provides details concerning a condition that resulted in the granting of enforcement discretion. The condition dealt with the failure of a centrifugal charging pump. This condition is being reported, in accordance with 10 CFR 50.73 (a) (2) (1) (B), as an operation or condition prohibited by the plant's technical specifications and 10 CFR 50.73 (a) (2) (iv) , as an event that resulted in a manual actuation of an engineered safety feature.

Sincerely, W y Masoud a'estani , S V

Enclosure -

cc: See page 2 g51901og990511 g ADOCF 05000327 -

PDR 1

  • L ' il l 'a me vmm

- _ . _ Y

p

'U.S. Nuclear Regulatory Commission Page 2 May 11, 1999 Enclosure cc (Enclosure):

INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. R. W. Hernan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear _ Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37384-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II.

Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30323-3415 l

f i

l i

I' >

!