Forwards Insp Repts 50-327/98-10 & 50-328/98-10 on 981011- 1121.No Violations Noted
ML20198A810
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/07/1998
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20198A815 List:
References
50-327-98-10, 50-328-98-10, NOED-98-2-002, NOED-98-2-2, NUDOCS 9812170139
Download: ML20198A810 (5)


See also: IR 05000327/1998010

Text

'

4

l

i

December 7, 1998

NOED No. 98-2-002

Tennessee Valley Authority

ATTN: Mr. J. A. Scalice

Chief Nuclear Officer and

Executive Vice President

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-327/98-10

AND 50-328/98-10

Dear Mr. Scalice:

This refers to the inspection conducted on October 11 - November 21,1998, at the Sequoyah

facility. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities at the Sequoyah facility was generally

characterized by safety-conscious operations, sound engineering and maintenance practices,

and careful radiological work controls. Good operations performance was demonstrated during

power ascension following Unit 1 Cycle 9 refueling outage and two reactor trips with

subsequent restarts. Maintenance activities were performed correctly with the exception of an

improperly reassembled diaphragm valve which resulted in an unplanned dilution event. An

example of good engineering support was noted with the sound and conservative evaluation of

boron residue on the exterior of the Unit 1 pressurizer.

Within the scope of the inspection, violations or deviations were not identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by Harold O. Christensen)

9812170139 981207

DR

ADOCK 0500

7

Harold O. Christensen, Chief

Reactor Projects Branch 6

/

Division of Reactor Projects

/

Docket Nos. 50-327,50-328

License Nos. DPR-77, DPR-79

g101

..

-

-- _ _... -

._-.- -.- .- -

-

.

.

l

TVA

2

Enclosure: NRC Inspection Report

i

!

cc w/ encl:

Senior.Vice President

Nuclear Operations

<

Tennessee Valley Authority

6A Lookout Place

!

1101 Market Street

Chattanooga, TN 37402-2801

(

Jack A. Bailey, Vice President

' Engineering and Technical Services

Tennessee Valley Authority

l

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Masoud Bajestani

,

Site Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

i

l

Soddy-Daisy, TN 37379

General Counsel

Tennessee Valley Authority

ET 10H

400 West Summit Hill Drive

Knoxville, TN 37902

Raul R. Baron, General Manager

Nuclear Assurance

Tennessee Valley Authority

SM Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Mark J. Burzynski, Manager

Nuclear Licensing

Tennessee Valley Authority

4X Blue Ridge

1101 Market Street

Chattanooga, TN 37402-2801

!

l

cc w/enci continued: See page 3

l

l

.

_

.

.

. . .

. . -

_ - - - -

.

.. -

- _ -

_ - _ . . .

.

.'

,

l

TVA'

3

I

cc w/ encl: Continued

Pedro Salas, Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

,

J. T. Herron, Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.' O. Box 2000

Soddy Daisy, TN 37379

Michael H. Mobley, Director

Division of Radiological Health

TN Dept. of Environment and

Conservation

3rd Floor, LNC Annex

401 Church Street

Nashville, TN 37243-1532

County Executive

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Distribution w/ encl:

L. R. Plisco, Ril

R. W. Hernan, NRR

F. Hebdon, NRR

W. C. Bearden, Ril

C. F. Smith, Ril

E. D. Testa, Ril

D. H. Thompson, Ril

L. S. Mellen, Ril

PUBLIC-

Distribution w/enci continued: See page 4

_

_

_ ,

___

__

.

.

_ _ _ _ _ _ _ . . _ _ _ _ _ . _ ._ __

_

_._ _ _ . . . _ . . _ _ _ . .__.._ _

-

..

l

TVA

4

)

'

l

Distribution w/ encl: Continued.

!

'

- NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

I

Spring City, TN 37381

NRC Resident inspector

j

Sequoyri. Nuclear Plant

{

,-

L

U. S. Nuclear Regulatory Commission

'

!

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

1

i

1

l

  • See previous concurrence - attached

vrrivE

RiQRP

Ril:DRP

Ril:DRP

p

l

SIGNATURE

yg-

,

,

,

NAME

P Taylor alt

D Starkey

R Telson

l

DATE

12/ J /98

12/ /98

12/ /98

12/ /98

12/ /98

12/ /98

12/ /98

COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

!'

OFFICIAL RECORD COPY

DOCUMENT NAME: G:\\SQ\\ REPORTS \\9810.RPT

I

_~

29*d,T 101

TVA

4

Distribution w/ encl: Continued

NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

/

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daley, TN 37379

ureme

nuamr

an.DRP

RHjwcr

?Lg g,pggg

M TURE

j

.

i

MAurs

P Tp an

o stattwy

'M Telson

DATE

is /ps

ta g m_

13g ten

12/ 19s

tw isir

1r iss

13 tus

c w rf

Yt.5

NO

YE5

@

YE5

Ng

YES

NO

YES

NO

YEB

NO

YE5

NO

OFFM2AL RECORD COPY

DOCUMENT NAME: C2FFICtaWFWINiWPDOC8\\S$10.RPT

20*d

STSP29sPOPT

01

3]IddO IN30lS3d HUAOfl03S WOdd

WU2P:IT 8661-PO-21