Sequoyah Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:55:43 Report 22
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 04/17/2006 04/21/2006
7111108P IP Inservice Inspection Activities - PWR
PSB1-RP
- RP PUBLIC PREINSP VISIT/ ISFSI Baseline Inspections 05/15/2006 05/17/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas
PSB1-RP
- RP PUBLIC BASELINE Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 06/05/2006 06/09/2006 1, 2 71151 IP Performance Indicator Verification
ISFSI-O
- 60855.1 - OPERATION OF AN ISFSI Other Routine 07/03/2006 07/07/2006
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 08/14/2006 08/18/2006 1, 2 7111112B IP Maintenance Effectiveness
PS2-EP
- EP EXERCISE Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/28/2006 09/01/2006 1, 2 71151 IP Performance Indicator Verification
- REQUAL INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111111B IP Licensed Operator Requalification Program
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111117B IP Permanent Plant Modifications
EB3-ISI
- U2-INSERVICE INSPECTION Baseline Inspections 12/04/2006 12/08/2006
7111108P IP Inservice Inspection Activities - PWR
EB3TI150
- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 12/04/2006 12/08/2006
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 12/11/2006 12/15/2006
7111108P IP Inservice Inspection Activities - PWR
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 12/17/2006 12/22/2006
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
OL PREP
- INITIAL EXAM PREP Not Applicable 03/19/2007 03/23/2007
V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES
EB3-HS
- HEAT SINK Baseline Inspections 03/26/2007 03/30/2007 1, 2 7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
Enclosure
Sequoyah Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:55:43 Report 22
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 04/09/2007 04/13/2007
V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 04/23/2007 04/27/2007
V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/18/2007 06/22/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111121 IP Component Design Bases Inspection
PS2-EP
- EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/21/2007 05/25/2007 1, 2 71151 IP Performance Indicator Verification
RPB6-PIR
- BIENNIAL PI&R INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/04/2007 06/08/2007 1, 2 71152B IP Identification and Resolution of Problems
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/04/2007 09/06/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.