IR 05000327/2006001

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan - Sequoyah Nuclear Plant (NRC Inspection Report 05000327/2006001, 05000328/2006001)
ML060610560
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/02/2006
From: Widmann M
Reactor Projects Region 2 Branch 6
To:
Shared Package
ML060610530 List:
References
IR-06-001
Download: ML060610560 (2)


Text

Sequoyah Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:55:43 Report 22

EB3-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 04/17/2006 04/21/2006

7111108P IP Inservice Inspection Activities - PWR

PSB1-RP

- RP PUBLIC PREINSP VISIT/ ISFSI Baseline Inspections 05/15/2006 05/17/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas

PSB1-RP

- RP PUBLIC BASELINE Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/05/2006 06/09/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 06/05/2006 06/09/2006 1, 2 71151 IP Performance Indicator Verification

ISFSI-O

- 60855.1 - OPERATION OF AN ISFSI Other Routine 07/03/2006 07/07/2006

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants

EB3-MR

- MR EFFECTIVENESS Baseline Inspections 08/14/2006 08/18/2006 1, 2 7111112B IP Maintenance Effectiveness

PS2-EP

- EP EXERCISE Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/28/2006 09/01/2006 1, 2 71151 IP Performance Indicator Verification

OL RQ

- REQUAL INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111111B IP Licensed Operator Requalification Program

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111117B IP Permanent Plant Modifications

EB3-ISI

- U2-INSERVICE INSPECTION Baseline Inspections 12/04/2006 12/08/2006

7111108P IP Inservice Inspection Activities - PWR

EB3TI150

- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 12/04/2006 12/08/2006

2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-

EB3SGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 12/11/2006 12/15/2006

7111108P IP Inservice Inspection Activities - PWR

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Baseline Inspections 12/17/2006 12/22/2006

71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity

OL PREP

- INITIAL EXAM PREP Not Applicable 03/19/2007 03/23/2007

V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES

EB3-HS

- HEAT SINK Baseline Inspections 03/26/2007 03/30/2007 1, 2 7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.

Enclosure

Sequoyah Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:55:43 Report 22

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 04/09/2007 04/13/2007

V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 04/23/2007 04/27/2007

V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/18/2007 06/22/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111121 IP Component Design Bases Inspection

PS2-EP

- EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/21/2007 05/25/2007 1, 2 71151 IP Performance Indicator Verification

RPB6-PIR

- BIENNIAL PI&R INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/04/2007 06/08/2007 1, 2 71152B IP Identification and Resolution of Problems

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/04/2007 09/06/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.