Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations
ML20209E407
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/30/1999
From: Fredrickson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20209E411 List:
References
50-327-99-03, 50-327-99-3, 50-328-99-03, 50-328-99-3, EA-99-162, NOED-99-001, NOED-99-1, NUDOCS 9907150028
Download: ML20209E407 (7)


See also: IR 05000327/1999003

Text

.

.

June 30, 1999

NOED 99-001

EA 99-162

. Tennessee Valley Authority

ATTN: Mr. J. A. Scalice

Chief Nuclear Officer and

Executive Vice President

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-327/99-03 AND

50-328/99-03

Dear Mr. Scalice:

This refers to the inspection conducted on March 28,1999 inrough May 31,1999, at the

- Sequoyah Nuclear Plant facility. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities at the Sequoyah facility was generally

characterized by good operations, maintenance.and plant support. Engineering support was

considered to be acceptable. However a maintenance cleanliness issue involving the Unit 2

turbine driven auxiliary feedwater pump was identified as was an issue involving damaged ice

condenser baskets. In addition, the following engineering issues were identified: failure to

implement maintenance rule requirements for electrical systems concerning breaker failures;

'. failure to perform an environmental assessment involving the auxiliary feedwater system pumps

and performing auxiliary feedwater system pump lube on temperature design verification test

using an oil temperature indicator that had not been calibrated.

Based on the results of this inspection, the NRC has determined that five violations of NRC

{

requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),

l

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violations or the severity level of these NCVs, you

[l

.

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrator, Region 11, and the

,

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

9907150028 990630

<

PDR

ADOCK 05000327

G

PDR

.d O/

,

.

TVA

2

in accordance with 10 CFR 2.790 of the NRC's "Ru!es of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

(Original signed by Paul E. Fredrickson)

Paul E. Fredrickson, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Enclosure NRC Inspection Report

cc w/ encl:

Senior Vice President

Nuclear Operations

Tennessee Valley Authority

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Jack A. Bailey, Vice President

Engineering and Technical Services

Tennessee Valley Authority

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Masoud Bajestani

Site Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

General Counsel

- Tennessee Valley Authority

ET 10H

400 West Summit Hill Drive

Knoxville, TN 37902

c w/enci continued: See page 3

!

!

I

t

__

.

.

TVA

3

cc w/ encl: Continued '

N. C. Kazanas, General Manager

Nuclear Assurance

. Tennessee Valley Authority

SM Lookout Place

1101 Market Street -

Chattanooga, TN 37402-2801

Mark J. Burzynski, Manager

Nuclear Licensing

Tennessee Valley Authority

i

4X Blue Ridge

1101 Market Street:

Chattanooga, TN 37402-2801

l

Pedro Salas, Manager

Licensing and industry Affairs

l

Sequoyah Nuclear Plant

'

Tennessee Valley Authority.

P. O. Box 2000

Soddy-Daisy, TN 37379

D. L. Koehl, Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy Daisy, TN 37379

j

Michael H. Mobley, Director

Division of Radiological Health

TN Dept. of Environment and

Conservation

,

3rd Floor, LNC Annex

401 Church Street

Nashville, TN 37243-1532

County Executive

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Distribution w/ encl:

L. R. Plisco, Rll

J. Lieberman:OE -

B. Summers, OE:OA file (2 letterhead copies)

R. W. Hernan., NRR

Distribution w/enci continued: See page 4

.

.

TVA

4

Distribution w/encj: Continued

H. N. Berkow, NRR

W. C. Bearden, Ril

C. F. Smith, Rll

D. W. Jones, Ril

D. H. Thompson, Ril

L. S. Mellen, Ril

E. D. Testa, Ril

PUBLIC

NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission

!

,

1260 Nuclear Plant Road

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

1

J

l

  • See previous concurrence - attached

l

DFFICE

RII:DRP

Ril:DRP

Ril:DRP

Ril:DRP

Ril;DRP

Ril;DR5

Ril:DR5

SIGNATURE

"

"

"

"

NAME

P Taylor att

M Shannon

R 5tarkey

R Telson

W Kleinsorge

D Jones

W Bearden

DATE

6/ /99

6/ 199

6/ /99

6/ /99

6/ /99

6/ /99

6/ /99

COPY 7

YE5

NO

YES

NO

YES

NO

YES

NO

YE5

NO

YES

NO

YES

NO

5IGNATURE

Lu

{ g f)jj

NAME

C Casto

A Boland

K Landis

F

DATE

6/4/99

6/ /99

6//h'/99

6/ /99

6/ /99

6/ /99

6/ /99

COPY 7

YE5

NO

YE5

NO

YES

NO

YE5

NO

YE5

NO

YE5

NO

YE5

NO

OFFlotAL RECORD COPY

DOCUMENT NAME: G:LSQ\\ REPORTS \\9903.wpd

06-30-1999 09:22Ft1

FROt1 SEGUDYR>l RESIDENT OFFICE

TO

14045624515

P.01

.

.

WA

4

'

Distribution m/end: Continued

H. N. Berkow, NRR

W. C. Beerden, R!l

C. F. $msth, RII

D. W. Jones, Ril

D. H. Thompson, Ril

L S.Meton,Ril

E. D. Tests, Ril

PUDUC

NRC Reedent li-@cs, Opersbons

U. S. Nudeer Regulatory Commission

1260 Nudear Plant Road

Spring City, TN 37381

NRC Residentinspector

Sequoyah Nucieer Plant

U. 8. Nudeer Reguistory Commission

2000 Igou Feny Road

soddy-oesy,TN 37379

-

==

%--a

m:-

sw

--

--

mam8

_

"NM

MM__m MLfM

?%n

.

.

._.

m

P Tayter a

masusuten

RL%

v R 76. ry'W AUninsorgs

UJones

W Beerden

unin

e m

Ep

aw g

wgo m ,

w m

w m

e a

w rr

r um,

NU

ruw - NU

755

NO

YE5

sov

YE5

NO

YE5

NO

Y55

NO

--

-

- MMM

g

--

-

l

.

M

GM~

Id

M latdl5

'

naTu

sF T

m

w m

w M

W M

W M

W m

M if

vue

F'.

- ND

YEs

NU

Tse

NO

YEs

no

Tus

No

Yum

No

C FPICIAL M

.)f

DOGURENT NAME: G.E. _. M _ _3 1.wpd

i

TOTAL P.01

I

.

.

TVA

4

Distribution w/ encl: Continued

H. N. Berkow, NRR

W. C. Bearden, Rll

,

,

C. F. Smith, Rll

/

D. W. Jones, Ril

D. H. Thompson, Ril

L. S. Mellen, Rll

4 dd8M)gg (k

i

E. D. Testa, Ril

6 gg

PUBLIC

i

p

1

NRC Resident inspector, Operations

- U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

'

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

/

  • See previous concurrtmce - attached

OFFICE

Ril:DRP

Fds:DRP /

RII:DRP

RII;DRP

Ril:DRP

Ril:DRS

Rll:DRS

6I5NKTuRE

  • /

NAME

P Taylor alt

M Shannon

R Starkey

R Telson

W Kleinsorge

D Jones

W Bearden

DATE

6/ /99

6/ /99

6/ 19 9

8/ /99

G/ (99

61 /99

6/ 19 9

COPY 7

YES

NO

1g5 , NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFFICE

RII:DRP

ny g a

SIGNATURE

4g

NAME

C Casto

$Wyd

DATE.

6/ /99

/gp/99

6/ /99

6/ /99

6/ /99

6/ /99

6/ 199

COPY?

YES

NO

/

YES)

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFFICIAL RECORD CQP.y

DOCUMENT NAME: G:\\SQ\\ REPORTS \\9903.wpd

i

.

.

.

3

TVA

4

Distribution w/ encl: Continued

C. F. Smith, Rll

D. W. Jones, Rll

D. H. Thompson, Rll

L. S. Mellen, Ril -

E. D. Testa, Ril

PUBLIC

NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

,

OFFICE

RJLgRP

Ril:DRP/

Ril:DRP

Ril:DRP

Rl(:l Pfl

3/ Ril:DRS

Ril:DRS

r

,

SIGNATURE (J g

/

\\ f yg[AQ

Wp

NAME

P Taylor alt

M Shannon

E Starkey

R Teison

WM g

D pnes

W Bearden

DATE

6/ /g/99

6/ /99

6/ /99

6/ /99

JQ/99//

_

J //99

6/# 0 /99

COPY?

YES

NO

YES

NO

YES

NO

YES

NO

E'S

N

(yep NO

(YES/ NO

fl

SIGNATURE

/

l

NAME

C Casto

A Boland

j

DATE

6/ /99

6/ /99

6/ /99

6/ /99

6/ /99

6/ /99

6/ 199

COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFFICIAL RECORD COPY

DCCUMENT NAME: G:\\SQ\\ REPORTS \\9903.wpd

i