Forwards Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102 & Nov.Violations Noted Re Failure to Comply with EOPs Following Rt & Failure to Enter TS 3.0.3 When Limiting Condition for RCS Flow Instrumentation TS Not Met
ML20202J542
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/01/1999
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20202J544 List:
References
50-327-98-11, 50-328-98-11, EA-99-018, EA-99-18, NUDOCS 9902090167
Download: ML20202J542 (7)


See also: IR 05000327/1998011

Text

m._ .. .

-_#...-.... - . . - - . . - . . . - . . _ . _ , _ _ _ . _ _ . . _ . _._.- _

9:

s

T*  ;

c: s

,

!

,

February 1,1999 j

'

EA 99-018

i

Tennessee Valley Authority

"

' ATTN: Mr. J. A. Scalice

. Chief Nuclear Officer and  ;

Executive Vice President  ;

6A Lookout Place  !

1101 Market Street -

Chattanooga, TN 37402-2801

SUBJECT: NRC INTEGRATED INSPECTION REPORT NO. 50-327/98-11 i

AND 50-328/9811 AND NOTICE OF VIOLATION i

Dear Mr. Scalice: '!

. This refers to the inspection conducted on November 22,1998 - January 2,1999, at the

'

Sequoyah facility. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities at the Sequoyah facility was generally i

characterized by satisfactory operations. Improvements were identified in the maintenance and

.

i

refurbishment of electrical breakers.' Engineering evaluations related to ice condenser

modifications were properly evaluated for conformance with the Updated Final Safety Analysis . j

Report.  ;

1

Based on the results of this inspection, the NRC has determined that violations of NRC  !

- requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice) and

the circumstances surrounding them are described in the subject inspection report. The

violations involved (1) two examples of failure to comply with emergency operating procedures

,

- (EOPs) following a reactor trip and (2) failure to enter Technical Specification (TS) 3.0.3 when

- the limiting condition for a reactor coolant system flow instrumentation TS requirement was not

met. These violations are of concem because they indicate a weakness in licensed operator's

understanding and adherence to TSs and EOPs.

You are required to. respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necassary to ensure compliance with l

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

\

'

.t

00000nu

'

,

3 9

i3 $ ..

9902090167 990201

PDR ADOCK 05000327

G PDR

, _ -

4l.0 \

r-

l. .-

!

....

TVA 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

l (Original signed by Ioren R. Plisco)

Loren R. Plisco, Director

Division of Reactor Projects

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

I

Enclosures: 1. Notice of Violation

l_

2. NRC Inspection Report

cc w/encis:

Senior Vice President .

Nuclear Operations

!

Tennessee Valley Authority

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

$ Jack A. Bailey, Vice President

!

Engineering and Technical Services

, Tennessee Valley Authority .

! 6A Lookout Place

L

1101 Market Street

l Chattanooga, TN 37402-2801

l

Masoud Bajestani

Site Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy,TN 37379

1

General Counsel

. Tennessee Valley Authority

ET 10H

400 West Summit Hill Drive

Knoxville,TN 37902

cc w/encls continued: See page 3

-

_. . . .- - -

1

.

1

!

l

TVA 3

cc w/encls: Continued

Raul R. Baron, General Manager

Nuclear Assurance

= Tennessee Valley Authority

SM Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

' Mark J. Burzynski, Manager -

Nuclear Licensing

Tennessee Valley Authority

4X Blue Ridge l

1101 Market Street

Chattanooga, TN 37402-2801

i

Pedro Salas, Manager I

Licensing and Industry Affairs l

Sequoyah Nuclear Plant i

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

Dennis Koehl, Plant Manager i

Sequoyah Nuclear Plant l

Tennessee Valley Authority l

P. O. Box 2000 -  ;

Soddy Daisy, TN 37379

Michael H. Mobley, Director

Division of Radiological Health

TN Dept. of Environment and

'

Conservation

3rd Floor, LNC Annex

401 Church Street

Nashville, TN 37243-1532 j

County Executive

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Qistribution w/encis:

L R. Plisco, Ril

R. W. Heman, NRR

C. O. Thomas, NRR

J. Lieberman, OE

B. Summers, OE:OA file (2 letterhead copies)

Distribution w/encls continued: See page 4

. . - . .- . . . . - . . . . ,~

..

..

!

TVA 4

Distribution w/encis: Continued l

.W. C. Bearden, Rll l

C. F. Smith, Rll

D. W. Jones, Ril i

D. H. Thompson, Rll

L. S. Mellen, Ril

PUBLIC .

NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission i

1260 Nuclear Plant Road

Spring City, TN 37381

.NRC' Resident inspector

' Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

_

,

  • See previous concurrence - a':tached

! vrrnd RII:DRP Ril:DRP RII:DFIP Ril:DRP Ril:DRP Ril:DRP Ril:DRS

SIGNATURE * * * * * * *

, NAME PTay or alt MShannon DStarkey RTelson P VanDoorn P Fredrickson R Gibbs

4 DATE' 2/ /99 2/ M 2/ M 2/ M 2/ /99 2/ /99 2/ M

COPY?. YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SQ\ REPORTS \9811.RPT

!

i

. . ~. . . . . . . - -. . . . . . -

.

.-

f -

!

TVA 4

Distribution w/encls: Continued I

. W. C. Bearden, Ril 1

C. F. Smith, Ril 1

D. W. Jones, Ril'

D. H. Thompson, Rll i

L. S. Mellen, Ril i

PUBLIC

l

NRC Resident inspector, Operations

U. S. Nuclear Regulatory Commission .

1260 Nuclear Plant Road

) '

Spring City, TN 37381

NRC Resident inspector

Sequoyah Nuclear Plant

. U. S. Nuclear Regulatory Commission 'j

2600 Igou Ferry Road i

Soddy-Daisy, TN 37379

J

I

1

I

!

l

1

Q6 01

'

0,I

i

'*See previous currence - attached

'

OFFICE Rij;.DRP Rif;DRP Ril:DRP Rll:DRP Ril:DRP Ril:DR L / Ril:DRS

  • * * *

SIGNATURE yf l jj/) *

NAME PTaylor alt Mshannon Dstarkey RTeison P VanDoorn P FrepvW:kson R Gibbs

. DATE. 1/ gs/99 l 1/ /99 1/ 199 1/ /99 1/ /99 1/M /99 1/ /99

COPY?. YES NO YEs NO YEs NO YES NO YEs NO YES NO YEs NO

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SQ\ REPORTS \9811.RPT

- ._ - ... - . .- - -. ~ . . .- . - . . . . ..

.

'

,

TVA- 4 ,

I

'

Distribution w/gngig
Continued '

D. W. Jones, Ril

D. H. Thompson, Ril

L S. Mellen, Ril

'

PUBLIC -

- NRC Resident inspector, Operations -

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road -

Spring City, TN ' 37381

NRC Resident inspector  !

Sequoyah Nuclear Plant. I

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road

Soddy-Daisy, TN 37379

I

l

l

l

l

I

,

/

  • See previous concur ce - attached

vrrms R5:DRP Rll:DRP l Ril:DRP Ril:DRP Ril:DRP Ril:DfjSg

.

M TURE fitt- * l * * (f-t-h),, 1)kVP

NAME- PTaylor att MShannon i DStarkey RTelson P VanDodn R Gibbs

DATE. 1/at /99 1/ /99 1/ 199 1/ /99 1/ 6 1/a4 /99 1/ /99

CU Vi YES NO YES NO YES NO YES NO YES NO YES (NOJ YES NO

OPFICIAL RECORD COPY DOCUMENT NAME: G:\SO\ REPORTS \9811.RPT W

'

-

. . . . _ . . _ _ . _ _ . __ _ _ . __- _ _ _

EO'd T101

-

r

I

1

WA 5 -

Distribution w/encls: Continued j

D. W. Jones, Ril

. D. H. Thompson, Ril

l L. S. Mellen, Ril

PUBUC

l

NRC Resident inspector, Operations l

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

Spring City, TN 37381

l

l

NRC Resident inspector '

Sequoyah Nuclear Plant

U. S. Nuclear Regulatory Commission

2600 Igou Ferry Road i

Soddy-Daisy, TN 37379

l

j

, .

-

verK;g Ril:DRP gi:piff) RH:DRP ,

RifM ja M.DRP RU:DRS

    • M

NAME PTaylor an

I W 2lMD5tarkey

S

~ MShannon

/E'E?//ff bPTeison

V P Vanocom R Gibbs

-___

1/ 199 il /99 11 199

DATh il 199 J2) 199 1/Ag 1/gj /99

YE5 NO YES NO YE5 NO

COPY? YE5 NO QE5) NO YES [NQ) YES /NQf

!

M * ? S!SP2t?SPOPI 01 331d30 IN3GIS3d HUAOnO35 WOdd WUSS:01 666T-12-T0

._ _