March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014001, 05000328/2014001

Dear Mr. Shea:

On February 10, 2015, the NRC completed its end-of-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Sequoyah Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP)

Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Temporary Instruction (TI) 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, and an initial operator license examination. In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4511 with any questions you have regarding this letter.

Sincerely,

/RA/

Michael F. King, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure: Sequoyah Inspection/Activity Plan

(03/01/2015 - 06/30/2016)

cc Distribution via ListServ

________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP

SIGNATURE

/RA by SRS5/

/RA By MFK1/

NAME SSandal MKing

DATE 2/26/2015 2/29/2015

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO Letter to Joseph from Michael F. King dated March 4, 2015

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014001, 05000328/2014001

Distribution w/encl:

D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 02/05/2015 08:19:27 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2015 - 06/30/2016 OL EXAM

- INITIAL LICENSE EXAM

1 SEQUOYAH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V23432 03/02/2015 03/27/2015 ISI

- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM

1 IP Inservice Inspection Activities - PWR 7111108P 04/20/2015 04/24/2015 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution 71152B 06/22/2015 06/26/2015 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/13/2015 07/17/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/27/2015 07/31/2015 HS

- TRIENNIAL HEAT SINK PERFORMANCE

1, 2 IP Heat Sink Performance 7111107T 07/20/2015 07/24/2015 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 10/12/2015 10/16/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 10/12/2015 10/16/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/12/2015 10/16/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/12/2015 10/16/2015 1, 2 IP Performance Indicator Verification 71151 10/12/2015 10/16/2015 RP

- RAD HAZARDS ANALYSIS AND TRANSPORTATION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/02/2015 11/06/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/02/2015 11/06/2015 1, 2 IP Performance Indicator Verification 71151 11/02/2015 11/06/2015 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/23/2015 11/27/2015 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/30/2015 12/04/2015 OL EXAM

- INITIAL LICENSE EXAM PREP

1 SEQUOYAH MARCH 2016 INITIAL EXAM AT POWER FACILITIES V23466 02/08/2016 02/12/2016 OL EXAM

- INITIAL LICENSE EXAM

1 SEQUOYAH MARCH 2016 INITIAL EXAM AT POWER FACILITIES V23466 03/07/2016 03/18/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/05/2015 08:19:27 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2015 - 06/30/2016 CDBI

- COMPONENT DESIGN BASES INSPECTION

1, 2 IP Component Design Bases Inspection 7111121 04/25/2016 04/29/2016 1, 2 IP Component Design Bases Inspection 7111121 05/09/2016 05/13/2016 1, 2 IP Component Design Bases Inspection 7111121 05/23/2016 05/27/2016 1, 2 IP Component Design Bases Inspection 7111121 06/13/2016 06/17/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.