ML20206C084
| ML20206C084 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/23/1999 |
| From: | Fredrickson P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Scalice J TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20206C088 | List: |
| References | |
| 50-327-99-02, 50-327-99-2, 50-328-99-02, 50-328-99-2, NUDOCS 9904300177 | |
| Download: ML20206C084 (5) | |
See also: IR 05000327/1999002
Text
.
.
April 23, 1999
Tennessee Valley Authority
ATTN: Mr. J. A. Scalice
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402 2801
SUBJECT:
NRC INSPECTION REPORT NO. 50-327/99-02 AND 50-328/99-02
Dear Mr. Scalice:
This refers to the inspection conducted on February 14,1999 through March 27,1999, at the
Sequoyah Nuclear Plant facility. The enclosed report presents the results of this inspection.
During the inspection perio9, your conduct of activities at the Sequoyah facility was generally
characterized by good maWwance and plant support. Operations was considered to be
acceptable. Engineering supgart was considered to be acceptable.
During the inspection period, the NRC received responses dated March 2,1999 and March 19,
1999, to Notices of Violation transmitted to you with NRC Inspection Reports 50-327/98-11-01
and 50-327/98-11-02, respectively. We have evaluated your responses and found that they
meet the requirements of 10 CFR 2.201. We have examined the implementation of your
corrective actions during this inspection period and found them acceptable.
/
)
Based on the results of this inspection, the NRC has determined that a violation of NRC
j
requirements occurred. The violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
inspection report. If you contest the violation or the severity level of the NCV, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
20555-0001, with copies to the Regional Administrator, Region 11, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
i
,
"
9904300177 990423
ADOCK 05000327
l
G
l
l
.
I
fl0! }
.
4
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a. copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
(Original signed by Paul E. Fredrickson)
Paul E. Fredrickson, Chief
Reactor Projects Branch 6
Division of Reactor Projects
Docket Nos. 50-327,50-328
License Nos. DPR-77 DPR-79
Enclosure: NRC Inspection Report
cc w/ encl:
Senior Vice President
Nuclear Operations
Tennessee Valley Authority
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Jack A. Dailey, Vice President
Engineering and Technical Sentices
Tennessee Valley Authority
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Masoud Bajestani
Site Vice President
Sequoyah Nuclear Plant
Tennessee Valley Authority
P. O. Box 2000
Soddy-Daisy,TN 37379
General Counsel
Tennessee Valley Authority
ET 10H
400 West Summit Hill Drive
Knoxville,TN 37902
l
cc w/enci continued: See page 3
I
i
'
e
.
.
-TVA
3
cc w/ encl: Continued
N. C. Kazanas, General Manager
Nuclear Assurance
Tennessee Valley Authority
SM Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Mark J. Burzynski, Manager
Nuclear Licensing
Tennessee Valley Authority
4X Blue Ridge
1101 Market Street
Chattanooga, TN 37402-2801
Pedro Salas, Manager
Licensing and industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
P. O. Box 2000
Soddy-Daisy, TN 37379
D. L. Koehl, Plant Manager-
\\
Sequoyah Nuclear Plant
i
Tennessee Valley Authority
'N
P. O. Box 2000
' Soddy Daisy, TN 37379
Michael H. Mobley, Director
Division of Radiological Health
TN Dept. of Environment and
Conservation
3rd Floor, LNC Annex
401 Church Street
Nashville, TN 37243-1532
County Executive
Hamilton County Courthouse
Chattanooga, TN 37402-2801
Qistribution w/ encl:
L. H. Plisco, Ril
H. N. Berkow, NRR
R. W. Hernan, NRR
W. C. Bearden, Ril
C. F. Smith, Ril
Distribution w/enci continued: See page 4
-
.
.
'TVA
-4
Distribution w/enCI: Continued
i
D. W. Jones, Ril
D. H. Thompson, Rll
L. S. Mellen, Ril
PUBLIC
NRC Resident inspector, Operations
' U. S. Nuclear Regulatory Commission
1260 Nuclear Plant Road
Spring City. TN 37381
NRC Resident inspector
Sequoyah Nuclear Plant
U. S. Nuclear Regulatoi/ Commission
2600 Igou Ferry Road
Soddy-Daisy, TN 37379
i
- See previous concurrence - attached
OFFICE
FJihpRP
Ril:DRP
Ril:DRP
Ril:DRP
_,
SIGNATURE gg
NAME
P Taylor alt
M Shannon
D Starkey
R Telson
DATE
472)D9
W /99
W /99
W /99
W /99
& M
N /99
COPY 7
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YEs
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\SQWEPORTS\\M9902RPT.WPD
[
04-22-1999 09:26AM
FRON SEQUOYAH RESIDENT OFFICE
TO
14045624515
P.01
.
5
Distnbubon w/ encl: Continued
NRC Resident inspector, Operations
U. S. Nuclear Regulatory Commission
1260 Nuclear Plant Raad
Spring City, TN 37381
NRC Ret 4dentinspector
Sequoyoh Nuclear Plant
U. S. Nuclear Regulatory Commission
2600 Igou Ferry Road
Soddy-Daisy, TN 37379
i
l
u
=c
,w w
reg Q
%g _ g ,p.my
emeATURE
pf y A
_lgi g c,yfW Ff g-
>
P Taylor aR
M 5hennen
D 5tedrey
R Totoon
oniu
e ise
en tes
Wy 199
eI2.ise
e too
w /se
e too
m
wru r
TE5
NO
(usy
[ Tcy
NO
(Tcp
NO
TE5
NO
TE3
NO
TE5
NO
s v , ~enL murw hv
91L. ._.:i NAM: AW2rpt.wpd
Attachment 2
TOTAL P.01