IR 05000327/1986036
| ML20215E338 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/09/1986 |
| From: | Zech G NRC - TVA OVERSIGHT GROUP, NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8610150244 | |
| Download: ML20215E338 (1) | |
Text
r
,
Origiha.)
_ jTennessee Valley Authority y ATTN:
Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-36 AND 50-328/86-36 Thank you for your responses of August 22, and September 4,1986, to our Notice of Violation, issued on July 23, 1986, concerning activities conducted at your Sequoyah facility. We have evaluated your responses and found that they meet the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
The corrective actions described in your second response to prevent inaccurate information from being included in future submittals, such as that contained in your first response, appears to be adequate.
We appreciate your cooperation in this matter.
Sincerely, Gary G. Zech, Director Division of TVA Projects cc: til. L. Abercrombie, Sequoyah Nuclear d.PlantSiteDirector R. Wallace, Plant Manager p.A.Kirkebo, Director Nuclear Engineering vd. L. Gridley, Director Nuclear Safety and Licensing
/ M. R. Harding, Licensing Site Manager Ld bec:/
N. Grace R. Denton, NRR
. L. Thompson, NRR
. M. Taylor, IE B. B. Hayes, 01 S. R. Connelly, OIA K. P. Barr NRC Resident Inspector Document Control Desk State of. Tennessee RII RI RI R
RII c3 V RWe ington osey DCollins JPStohr G enic s BDeb FBarr 9//f/86 9/q/86 9/// /86 9/s2/86 9/g'86 9/g /86 9/cy/86 N
..
..ggoggggpjjja7 _
_-
_
- -
- g g
n
-.
__