ML20137S412

From kanterella
Revision as of 09:12, 13 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S412
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Williams J
TOLEDO EDISON CO.
References
NUDOCS 8602180042
Download: ML20137S412 (2)


Text

- -

y w w FEB 11108 Docket No. 50-346 Toledo Edison Company

  • ATTN: Mr. Joe Williams, Jr.

Vice President Nuclear Edison Plaza ..

300 Madison Avenue Toledo, OH .43652

  • Gentlemen:

Enclosed is a copy of the rerised NRC Form 398. This revised form requires that all information be compieted in total with each .new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received sface the last application under Item 15. Please note that the training section will no longer be cumulative. Other changes are detailed in Enclosure 2. Enclosure 3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications far licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

ORIGINAL SIGNED BY LUIS A. REYES

~

Doc $hl PDR Luis A. Reyes, Chief Operations Branch

Enclosures:

As stated See Attached Distribution l

RIII N RIII RI 1 Ro@xworthy/mab 1 eyes KMillen 02/11/86 &lig f a _ - - - -

dkd

A

. Toledo Edison Company 2 FEB 11 g

' Distribution cc w/ enclosures: .

~R. Simpkins,. Training Department cc w/o enclosures:

L.- Storz, Plant Manager

. -DCS/RSB (RIDS). *

Licensing-Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA

-James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of. Health I

i L