Discusses Status of Action Items Re Auxiliary Feedwater Sys Mods,Per Util .All Items Scheduled for Implementation by Startup of 1986 Outage Complete,Except as Listed
ML20203L324
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/21/1986
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
TAC-60783, NUDOCS 8608260070
Download: ML20203L324 (2)


Text

-

L

- mumm m 1555W

.r- ,.7 E Bart D Weers Vce Presdce August 21, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation Attn: Mr. S. A. Varga Director, PWR-A Project Directorate No. 3 U.S. Nuclear Regulatory Commission Washington DC 20555

Dear Sir:

Auxiliary Feedwater System Our letter of November 25, 1985 included a list of Auxiliary Feedwater (AFW) System modifications to be made and our schedule for completing them. The purpose of this letter is to provide status on those action items.

All items scheduled for implementation by startup of the 1986 outage are complete except as noted below. The remaining items are on schedule, and all are expected to be complete by startup of the 1987 refueling outage.

The following items were either not completed by startup in 1986 as originally scheduled or had final action which was different than originally described:

Item Description I B.2 The turbine AFW pump electrical overspeed trip was not deleted. During testing, the mechanical overspeed trip was determined to be inconsistent and erratic. Further evaluation of the mechanical overspeed trip with the turbine vendor is scheduled. Depending on the outcome of this evaluation, the electrical overspeed trip may be permanently retained. Final action on this item will be complete by startup of the 1987 refueling outage.

, B.S. C.3 A new detailed calibration procedure for the diesel- and I turbine-driven AFW pumps Woodward Governor Control System was not developed because an adequate procedure is already in place. No further action is required.

8608260070 860821 PDR I

ADOCK 05000344 P pyp ffgof ,

i 0

121 S W Ssmon Stwt Pomanci Oregon 97204

w W Gerier-d BedricCorty)eriy Mr. S. A. Varga August 21, 1986 Page 2 Item Description C.4 A new surveillance requirement for the diesel AFW pump starting batteries and charger was not added because detailed monthly surveillance requirements already exist.

C.5 The three timers were not replaced. One timer was removed as a result of a design change. The other two timers were evaluated and determined to be adequate.

Sincerely, y

Bart . Withers Vice President Nuclear Attachment I

c: Mr. John B. Martin (2 copies)

Regional Administrator, Region V U.S. Nuclear Regulatory Cornmission Mr. Lynn Frank, Director State of Oregon Department of Energy l

_ _ _ -,